IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v178y2016icp57-64.html
   My bibliography  Save this article

Optimal imperfect maintenance strategy for leased equipment

Author

Listed:
  • Ben Mabrouk, A.
  • Chelbi, A.
  • Radhoui, M.

Abstract

This paper presents a preventive maintenance (PM) policy for leased equipment over a finite lease period L. Maintenance is entrusted to the lessor. The purpose is to determine the PM period T minimizing the expected total cost over the lease period in a context where repairs and PM actions are imperfect and have non-negligible durations. The leased equipment is periodically subjected to imperfect PM restoring it to the state ‘as good as new’ with probability p and keeping it at state ‘as bad as old’ with probability q. In case of failures between successive PM actions, imperfect repairs are performed with a given efficiency following a decreasing quasi-renewal process. Besides the maintenance costs, the lessor may incur a penalty cost if the total expected equipment downtime due to repair and PM during the lease period exceeds a pre-specified threshold. A mathematical model and a numerical algorithm are developed to find the optimal maintenance strategy T* over the lease period for any given set of input parameters (equipment reliability, the lease period length, the repair and PM efficiency levels, and the maintenance and penalty costs). A numerical example is presented and the obtained results are discussed.

Suggested Citation

  • Ben Mabrouk, A. & Chelbi, A. & Radhoui, M., 2016. "Optimal imperfect maintenance strategy for leased equipment," International Journal of Production Economics, Elsevier, vol. 178(C), pages 57-64.
  • Handle: RePEc:eee:proeco:v:178:y:2016:i:c:p:57-64
    DOI: 10.1016/j.ijpe.2016.04.024
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527316300585
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2016.04.024?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wu, Jun & Xie, Min & Adam Ng, Tsan Sheng, 2011. "On a general periodic preventive maintenance policy incorporating warranty contracts and system ageing losses," International Journal of Production Economics, Elsevier, vol. 129(1), pages 102-110, January.
    2. Aras, Necati & Güllü, Refik & Yürülmez, Sevil, 2011. "Optimal inventory and pricing policies for remanufacturable leased products," International Journal of Production Economics, Elsevier, vol. 133(1), pages 262-271, September.
    3. A. Ben Mabrouk & A. Chelbi & M. Radhoui, 2016. "Optimal imperfect preventive maintenance policy for equipment leased during successive periods," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5095-5110, September.
    4. Hongzhou Wang & Hoang Pham, 2006. "Reliability and Optimal Maintenance," Springer Series in Reliability Engineering, Springer, number 978-1-84628-325-3, September.
    5. Jaturonnatee, J. & Murthy, D.N.P. & Boondiskulchok, R., 2006. "Optimal preventive maintenance of leased equipment with corrective minimal repairs," European Journal of Operational Research, Elsevier, vol. 174(1), pages 201-215, October.
    6. Pongpech, J. & Murthy, D.N.P., 2006. "Optimal periodic preventive maintenance policy for leased equipment," Reliability Engineering and System Safety, Elsevier, vol. 91(7), pages 772-777.
    7. SamatlI-Pa, Glay & Taner, Mehmet R., 2009. "The role of repair strategy in warranty cost minimization: An investigation via quasi-renewal processes," European Journal of Operational Research, Elsevier, vol. 197(2), pages 632-641, September.
    8. Chelbi, Anis & Ait-Kadi, Daoud, 2000. "Generalized inspection strategy for randomly failing systems subjected to random shocks," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 379-384, March.
    9. Nakagawa, T. & Mizutani, S., 2009. "A summary of maintenance policies for a finite interval," Reliability Engineering and System Safety, Elsevier, vol. 94(1), pages 89-96.
    10. Chukova, S. & Arnold, R. & Wang, Dong Q., 2004. "Warranty analysis: An approach to modeling imperfect repairs," International Journal of Production Economics, Elsevier, vol. 89(1), pages 57-68, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xia, Tangbin & Sun, Bowen & Chen, Zhen & Pan, Ershun & Wang, Hao & Xi, Lifeng, 2021. "Opportunistic maintenance policy integrating leasing profit and capacity balancing for serial-parallel leased systems," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    2. Xinlong Li & Yan Ran & Fangming Wan & Hui Yu & Genbao Zhang & Yan He, 2022. "Condition-based maintenance strategy optimization of meta-action unit considering imperfect preventive maintenance based on Wiener process," Flexible Services and Manufacturing Journal, Springer, vol. 34(1), pages 204-233, March.
    3. Zhang, Yunzheng & Zhang, Xiaohong & Zeng, Jianchao & Wang, Jinhe & Xue, Songdong, 2019. "Lessees’ satisfaction and optimal condition-based maintenance policy for leased system," Reliability Engineering and System Safety, Elsevier, vol. 191(C).
    4. Gouiaa-Mtibaa, A. & Dellagi, S. & Achour, Z. & Erray, W., 2018. "Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 173(C), pages 1-11.
    5. Juhyun Lee & Byunghoon Kim & Suneung Ahn, 2019. "Maintenance Optimization for Repairable Deteriorating Systems under Imperfect Preventive Maintenance," Mathematics, MDPI, vol. 7(8), pages 1-17, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shafiee, Mahmood & Chukova, Stefanka, 2013. "Maintenance models in warranty: A literature review," European Journal of Operational Research, Elsevier, vol. 229(3), pages 561-572.
    2. Hamidi, Maryam & Liao, Haitao & Szidarovszky, Ferenc, 2016. "Non-cooperative and cooperative game-theoretic models for usage-based lease contracts," European Journal of Operational Research, Elsevier, vol. 255(1), pages 163-174.
    3. Sharafali, Moosa & Tarakci, Hakan & Kulkarni, Shailesh & Razack Shahul Hameed, Raja Abdul, 2019. "Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance," International Journal of Production Economics, Elsevier, vol. 208(C), pages 53-68.
    4. Xia, Tangbin & Dong, Yifan & Xiao, Lei & Du, Shichang & Pan, Ershun & Xi, Lifeng, 2018. "Recent advances in prognostics and health management for advanced manufacturing paradigms," Reliability Engineering and System Safety, Elsevier, vol. 178(C), pages 255-268.
    5. Ruey Yeh & Wen Chang & Hui-Chiung Lo, 2010. "Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method," Annals of Operations Research, Springer, vol. 181(1), pages 171-183, December.
    6. Ait Mokhtar, El Hassene & Laggoune, Radouane & Chateauneuf, Alaa, 2023. "Imperfect maintenance modeling and assessment of repairable multi-component systems," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
    7. Young Yun, Won & Nakagawa, Toshio, 2010. "Replacement and inspection policies for products with random life cycle," Reliability Engineering and System Safety, Elsevier, vol. 95(3), pages 161-165.
    8. Yi Ding & Anatoly Lisnianski & Ilia Frenkel & Lev Khvatskin, 2009. "Optimal corrective maintenance contract planning for aging multi‐state system," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 25(5), pages 612-631, September.
    9. Zhou, Xiaojun & Wu, Changjie & Li, Yanting & Xi, Lifeng, 2016. "A preventive maintenance model for leased equipment subject to internal degradation and external shock damage," Reliability Engineering and System Safety, Elsevier, vol. 154(C), pages 1-7.
    10. Jackson, Canek & Pascual, Rodrigo & Mac Cawley, Alejandro & Godoy, Sergio, 2023. "Product–service system negotiation in aircraft lease contracts with option of disagreement," Journal of Air Transport Management, Elsevier, vol. 107(C).
    11. Si, Guojin & Xia, Tangbin & Zhu, Ying & Du, Shichang & Xi, Lifeng, 2019. "Triple-level opportunistic maintenance policy for leasehold service network of multi-location production lines," Reliability Engineering and System Safety, Elsevier, vol. 190(C), pages 1-1.
    12. Wen Liang Chang, 2015. "Optimal single-replacement for repairable products with different failure rate under a finite planning horizon," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(6), pages 1003-1009, April.
    13. Chaabane, K. & Khatab, A. & Diallo, C. & Aghezzaf, E.-H. & Venkatadri, U., 2020. "Integrated imperfect multimission selective maintenance and repairpersons assignment problem," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    14. Jackson, Canek & Pascual, Rodrigo, 2021. "Joint pricing and maintenance strategies in availability-based product-service systems under different overhaul conditions," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
    15. Xia, Tangbin & Sun, Bowen & Chen, Zhen & Pan, Ershun & Wang, Hao & Xi, Lifeng, 2021. "Opportunistic maintenance policy integrating leasing profit and capacity balancing for serial-parallel leased systems," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    16. Taghipour, Sharareh & Banjevic, Dragan, 2012. "Optimal inspection of a complex system subject to periodic and opportunistic inspections and preventive replacements," European Journal of Operational Research, Elsevier, vol. 220(3), pages 649-660.
    17. A. Khatab, 2018. "Maintenance optimization in failure-prone systems under imperfect preventive maintenance," Journal of Intelligent Manufacturing, Springer, vol. 29(3), pages 707-717, March.
    18. Taghipour, Sharareh & Banjevic, Dragan & Jardine, Andrew K.S., 2010. "Periodic inspection optimization model for a complex repairable system," Reliability Engineering and System Safety, Elsevier, vol. 95(9), pages 944-952.
    19. Huang, Yeu-Shiang & Ho, Jyh-Wen & Hung, Jin-Wei & Tseng, Tzu-Liang (Bill), 2021. "A customized warranty model by considering multi-usage levels for the leasing industry," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    20. Wu, Shaomin, 2012. "Assessing maintenance contracts when preventive maintenance is outsourced," Reliability Engineering and System Safety, Elsevier, vol. 98(1), pages 66-72.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:178:y:2016:i:c:p:57-64. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.