IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v125y2010i1p173-184.html
   My bibliography  Save this article

Separate tools or tool kits: An exploratory study of engineers' preferences

Author

Listed:
  • Vliegen, I.M.H.
  • Kleingeld, P.A.M.
  • van Houtum, G.J.

Abstract

This paper describes an exploratory study of aspects that should be taken into consideration when optimizing tool kits, i.e. cases containing sets of tools that are used by service engineers for corrective maintenance. The study was carried out among service engineers of an Original Equipment Manufacturer (OEM) that produces lithography equipment that is critical in the production process of its customers. First, by means of the Critical Incident Technique, a conceptual model was developed incorporating the aspects that are associated with engineers' preferences for either separate tools or tool kits in servicing lithography equipment. Next, the actual preferences and most important determinants were established through a survey among engineers worldwide. The results show a preference for tool kits, both in general and for all phases of the maintenance process. Many aspects appear to play a significant role in this preference, such as packing, convenience, characteristics of the repair action, uncertainty, and time. Some of these aspects have been studied in the literature, mainly via quantitative models, while others have not been identified before.

Suggested Citation

  • Vliegen, I.M.H. & Kleingeld, P.A.M. & van Houtum, G.J., 2010. "Separate tools or tool kits: An exploratory study of engineers' preferences," International Journal of Production Economics, Elsevier, vol. 125(1), pages 173-184, May.
  • Handle: RePEc:eee:proeco:v:125:y:2010:i:1:p:173-184
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00029-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Brynzer, H. & Johansson, M. I., 1995. "Design and performance of kitting and order picking systems," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 115-125, October.
    2. Carlson, John G. & Yao, Andrew C. & Girouard, Wm. F., 1994. "The role of master kits in assembly operations," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 253-258, June.
    3. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
    4. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    5. John W. Mamer & Stephen A. Smith, 1985. "Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines," Management Science, INFORMS, vol. 31(6), pages 703-718, June.
    6. Shelby Brumelle & Daniel Granot, 1993. "The Repair Kit Problem Revisited," Operations Research, INFORMS, vol. 41(5), pages 994-1006, October.
    7. Isabelle Huault & V. Perret & S. Charreire-Petit, 2007. "Management," Post-Print halshs-00337676, HAL.
    8. Rustenburg, W. D. & van Houtum, G. J. & Zijm, W. H. M., 2001. "Spare parts management at complex technology-based organizations: An agenda for research," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 177-193, May.
    9. John W. Mamer & Stephen A. Smith, 1982. "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science, INFORMS, vol. 28(11), pages 1328-1333, November.
    10. John W. Mamer & Andrew W. Shogan, 1987. "A Constrained Capital Budgeting Problem with Applications to Repair Kit Selection," Management Science, INFORMS, vol. 33(6), pages 800-806, June.
    11. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    12. Jayashankar M. Swaminathan & Sridhar R. Tayur, 1998. "Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes," Management Science, INFORMS, vol. 44(12-Part-2), pages 161-172, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sleptchenko, Andrei & Al Hanbali, Ahmad & Zijm, Henk, 2018. "Joint planning of service engineers and spare parts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 97-108.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
    2. Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
    3. Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
    4. Prak, Dennis & Saccani, Nicola & Syntetos, Aris & Teunter, Ruud & Visintin, Filippo, 2017. "The Repair Kit Problem with positive replenishment lead times and fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 261(3), pages 893-902.
    5. Liu, Ke & Li, Jing-An & Lai, Kin Keung, 2004. "Single period, single product newsvendor model with random supply shock," European Journal of Operational Research, Elsevier, vol. 158(3), pages 609-625, November.
    6. Rachel Q. Zhang, 1999. "Expected time delay in multi‐item inventory systems with correlated demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(6), pages 671-688, September.
    7. Michael F. Gorman & Sanjay Ahire, 2006. "A Major Appliance Manufacturer Rethinks Its Inventory Policies for Service Vehicles," Interfaces, INFORMS, vol. 36(5), pages 407-419, October.
    8. R. Sundarraj, 2006. "A model for standardizing human decisions concerning service-contracts management," Annals of Operations Research, Springer, vol. 143(1), pages 171-189, March.
    9. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    10. Jing-Sheng Song, 1998. "On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System," Operations Research, INFORMS, vol. 46(6), pages 831-845, December.
    11. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
    12. Dombi, József & Jónás, Tamás & Tóth, Zsuzsanna Eszter, 2018. "Modeling and long-term forecasting demand in spare parts logistics businesses," International Journal of Production Economics, Elsevier, vol. 201(C), pages 1-17.
    13. Heeremans, D. & Gelders, L. F., 1995. "Multiple period repair kit problem with a job completion criterion: A case study," European Journal of Operational Research, Elsevier, vol. 81(2), pages 239-248, March.
    14. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    15. Juha Lukkarinen & Jukka Majava, 2020. "Supplies Inventory Management in a Corporation Context: A Case Study," International Journal of Management, Knowledge and Learning, International School for Social and Business Studies, Celje, Slovenia, vol. 9(2), pages 169-184.
    16. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    17. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    18. K Liu & J-A Li & Y Wu & K K Lai, 2005. "Analysis of monitoring and limiting of commercial cheating: a newsvendor model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 844-854, July.
    19. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    20. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:125:y:2010:i:1:p:173-184. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.