IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v51y1991i2p188-198.html
   My bibliography  Save this article

Sequencing jobs on a single machine with a common due date and stochastic processing times

Author

Listed:
  • Sarin, Subhash C.
  • Erel, Erdal
  • Steiner, George

Abstract

No abstract is available for this item.

Suggested Citation

  • Sarin, Subhash C. & Erel, Erdal & Steiner, George, 1991. "Sequencing jobs on a single machine with a common due date and stochastic processing times," European Journal of Operational Research, Elsevier, vol. 51(2), pages 188-198, March.
  • Handle: RePEc:eee:ejores:v:51:y:1991:i:2:p:188-198
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(91)90249-U
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Soroush, H. M., 1999. "Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 113(2), pages 450-468, March.
    2. Ramesh Bollapragada & Norman M. Sadeh, 2004. "Proactive release procedures for just‐in‐time job shop environments, subject to machine failures," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(7), pages 1018-1044, October.
    3. Alcaide, David & Rodriguez-Gonzalez, Andrés & Sicilia, Joaquín, 2003. "An approach to solve a hierarchical stochastic sequential ordering problem," Omega, Elsevier, vol. 31(3), pages 169-187, June.
    4. Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
    5. Li, Heng & Li, Zhicheng & Li, Ling X. & Hu, Bin, 2000. "A production rescheduling expert simulation system," European Journal of Operational Research, Elsevier, vol. 124(2), pages 283-293, July.
    6. Xiaoqiang Cai & Sean Zhou, 1999. "Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs," Operations Research, INFORMS, vol. 47(3), pages 422-437, June.
    7. Jang, Wooseung, 2002. "Dynamic scheduling of stochastic jobs on a single machine," European Journal of Operational Research, Elsevier, vol. 138(3), pages 518-530, May.
    8. Kolahan, F. & Liang, M., 1998. "An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups," European Journal of Operational Research, Elsevier, vol. 109(1), pages 142-159, August.
    9. Adamopoulos, G. I. & Pappis, C. P., 1996. "Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method," European Journal of Operational Research, Elsevier, vol. 88(2), pages 336-344, January.
    10. Adamopoulos, G. I. & Pappis, C. P., 1995. "The CON due-date determination method with processing time-dependent lateness penalties," International Journal of Production Economics, Elsevier, vol. 40(1), pages 29-36, June.
    11. Yang, Bibo & Geunes, Joseph, 2008. "Predictive-reactive scheduling on a single resource with uncertain future jobs," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1267-1283, September.
    12. Soroush, H.M., 2007. "Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 181(1), pages 266-287, August.
    13. Umar M. Al‐Turki & John Mittenthal & M. Raghavachari, 1996. "The single‐machine absolute‐deviation early‐tardy problem with random completion times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(4), pages 573-587, June.
    14. X. Cai & S. Zhou, 1997. "Scheduling stochastic jobs with asymmetric earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 531-557, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:51:y:1991:i:2:p:188-198. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.