IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v182y2007i3p1399-1411.html
   My bibliography  Save this article

Managing a portfolio of long term service agreements

Author

Listed:
  • Bollapragada, Srinivas
  • Gupta, Aparna
  • Lawsirirat, Chaipat

Abstract

No abstract is available for this item.

Suggested Citation

  • Bollapragada, Srinivas & Gupta, Aparna & Lawsirirat, Chaipat, 2007. "Managing a portfolio of long term service agreements," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1399-1411, November.
  • Handle: RePEc:eee:ejores:v:182:y:2007:i:3:p:1399-1411
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00887-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nejat Karabakal & Jack R. Lohmann & James C. Bean, 1994. "Parallel Replacement under Capital Rationing Constraints," Management Science, INFORMS, vol. 40(3), pages 305-319, March.
    2. Wallace J. Hopp & Philip C. Jones & James L. Zydiak, 1993. "A further note on parallel machine replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 575-579, June.
    3. Escudero, L. F., 1982. "On maintenance scheduling of production units," European Journal of Operational Research, Elsevier, vol. 9(3), pages 264-274, March.
    4. Kralj, Branimir L. & Petrovic, Radivoj, 1988. "Optimal preventive maintenance scheduling of thermal generating units in power systems --A survey of problem formulations and solution methods," European Journal of Operational Research, Elsevier, vol. 35(1), pages 1-15, April.
    5. Jen Tang & Kwei Tang, 1993. "A note on parallel machine replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 569-573, June.
    6. S. Anily & C.A. Glass & R. Hassin, 1999. "Scheduling maintenance services to three machines," Annals of Operations Research, Springer, vol. 86(0), pages 375-391, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Moura, Márcio das Chagas & Santana, João Mateus & Droguett, Enrique López & Lins, Isis Didier & Guedes, Bruno Nunes, 2017. "Analysis of extended warranties for medical equipment: A Stackelberg game model using priority queues," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 338-354.
    2. Kang, Hyuna & Hong, Juwon & Hong, Taehoon & Han, Dongsu & Chin, Sangyoon & Lee, Minhyun, 2019. "Determining the optimal long-term service agreement period and cost considering the uncertain factors in the fuel cell: From the perspectives of the sellers and generators," Applied Energy, Elsevier, vol. 237(C), pages 378-389.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Suzanne Childress & Pablo Durango‐Cohen, 2005. "On parallel machine replacement problems with general replacement cost functions and stochastic deterioration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 409-419, August.
    2. Joseph C. Hartman, 2000. "The parallel replacement problem with demand and capital budgeting constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(1), pages 40-56, February.
    3. Zhang, Le & Gu, Weihua & Fu, Liangliang & Mei, Yu & Hu, Yaohua, 2021. "A two-stage heuristic approach for fleet management optimization under time-varying demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 147(C).
    4. Chand, Suresh & McClurg, Tim & Ward, Jim, 2000. "A model for parallel machine replacement with capacity expansion," European Journal of Operational Research, Elsevier, vol. 121(3), pages 519-531, March.
    5. Tim McClurg & Suresh Chand, 2002. "A parallel machine replacement model," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(3), pages 275-287, April.
    6. Grigoriev, Alexander & van de Klundert, Joris & Spieksma, Frits C.R., 2006. "Modeling and solving the periodic maintenance problem," European Journal of Operational Research, Elsevier, vol. 172(3), pages 783-797, August.
    7. Shields, Brett A. & Seif, Javad & Yu, Andrew Junfang, 2019. "Parallel machine replacement with shipping decisions," International Journal of Production Economics, Elsevier, vol. 218(C), pages 62-71.
    8. Froger, Aurélien & Gendreau, Michel & Mendoza, Jorge E. & Pinson, Éric & Rousseau, Louis-Martin, 2016. "Maintenance scheduling in the electricity industry: A literature review," European Journal of Operational Research, Elsevier, vol. 251(3), pages 695-706.
    9. Lim, Seung-Kil & Kim, Yeong-Dae, 1998. "Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions," European Journal of Operational Research, Elsevier, vol. 104(1), pages 175-186, January.
    10. Scarf, Philip A. & Martin, Harry H., 2001. "A framework for maintenance and replacement of a network structured system," International Journal of Production Economics, Elsevier, vol. 69(3), pages 287-296, February.
    11. Dahal, Keshav & Al-Arfaj, Khalid & Paudyal, Krishna, 2015. "Modelling generator maintenance scheduling costs in deregulated power markets," European Journal of Operational Research, Elsevier, vol. 240(2), pages 551-561.
    12. Kevin Spiritus & Etienne Lehmann & Sander Renes, "undated". "Optimal Taxation with Multiple Incomes and Types," Tinbergen Institute Discussion Papers 22-000/IVI, Tinbergen Institute.
    13. Amiri, Ali, 2002. "An integrated approach for planning the adoption of client/server systems," European Journal of Operational Research, Elsevier, vol. 142(3), pages 509-522, November.
    14. Stasko, Timon H. & Oliver Gao, H., 2012. "Developing green fleet management strategies: Repair/retrofit/replacement decisions under environmental regulation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 46(8), pages 1216-1226.
    15. S. Rajagopalan, 1998. "Capacity Expansion and Equipment Replacement: A Unified Approach," Operations Research, INFORMS, vol. 46(6), pages 846-857, December.
    16. Mazidi, Peyman & Tohidi, Yaser & Ramos, Andres & Sanz-Bobi, Miguel A., 2018. "Profit-maximization generation maintenance scheduling through bi-level programming," European Journal of Operational Research, Elsevier, vol. 264(3), pages 1045-1057.
    17. Kralj, Branimir & Petrovic, Radivoj, 1995. "A multiobjective optimization approach to thermal generating units maintenance scheduling," European Journal of Operational Research, Elsevier, vol. 84(2), pages 481-493, July.
    18. Cholette, Michael E. & Yu, Hongyang & Borghesani, Pietro & Ma, Lin & Kent, Geoff, 2019. "Degradation modeling and condition-based maintenance of boiler heat exchangers using gamma processes," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 184-196.
    19. Asaf Levin & Gur Mosheiov & Assaf Sarig, 2009. "Scheduling a maintenance activity on parallel identical machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(1), pages 33-41, February.
    20. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:182:y:2007:i:3:p:1399-1411. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.