IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v34y1988i9p1096-1108.html
   My bibliography  Save this item

Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Roberto Rossi & S. Armagan Tarim & Brahim Hnich & Steven Prestwich & Semra Karacaer, 2010. "Scheduling internal audit activities: a stochastic combinatorial optimization problem," Journal of Combinatorial Optimization, Springer, vol. 19(3), pages 325-346, April.
  2. Julian Englberger & Frank Herrmann & Michael Manitz, 2016. "Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6192-6215, October.
  3. Minjiao Zhang & Simge Küçükyavuz & Saumya Goel, 2014. "A Branch-and-Cut Method for Dynamic Decision Making Under Joint Chance Constraints," Management Science, INFORMS, vol. 60(5), pages 1317-1333, May.
  4. G. P. Kiesmüller & K. Inderfurth, 2018. "Approaches for periodic inventory control under random production yield and fixed setup cost," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(2), pages 449-477, March.
  5. Tunc, Huseyin & Kilic, Onur A. & Tarim, S. Armagan & Eksioglu, Burak, 2013. "A simple approach for assessing the cost of system nervousness," International Journal of Production Economics, Elsevier, vol. 141(2), pages 619-625.
  6. Tempelmeier, Horst, 2011. "A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint," Omega, Elsevier, vol. 39(6), pages 627-633, December.
  7. Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
  8. Vargas, Vicente & Metters, Richard, 2011. "A master production scheduling procedure for stochastic demand and rolling planning horizons," International Journal of Production Economics, Elsevier, vol. 132(2), pages 296-302, August.
  9. Özen, Ulaş & Doğru, Mustafa K. & Armagan Tarim, S., 2012. "Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem," Omega, Elsevier, vol. 40(3), pages 348-357.
  10. Roberto Rossi & S. Armagan Tarim & Ramesh Bollapragada, 2012. "Constraint-Based Local Search for Inventory Control Under Stochastic Demand and Lead Time," INFORMS Journal on Computing, INFORMS, vol. 24(1), pages 66-80, February.
  11. Hadi Farhangi, 2021. "Multi-Echelon Supply Chains with Lead Times and Uncertain Demands," SN Operations Research Forum, Springer, vol. 2(3), pages 1-25, September.
  12. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
  13. Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
  14. Micheli, Guido J.L. & Mantella, Fabio, 2018. "Modelling an environmentally-extended inventory routing problem with demand uncertainty and a heterogeneous fleet under carbon control policies," International Journal of Production Economics, Elsevier, vol. 204(C), pages 316-327.
  15. Fernando Rojas & Víctor Leiva & Peter Wanke & Camilo Lillo & Jimena Pascual, 2019. "Modeling lot-size with time-dependent demand based on stochastic programming and case study of drug supply in Chile," PLOS ONE, Public Library of Science, vol. 14(3), pages 1-24, March.
  16. Malte Meistering & Hartmut Stadtler, 2020. "Stabilized-cycle strategy for a multi-item, capacitated, hierarchical production planning problem in rolling schedules," Business Research, Springer;German Academic Association for Business Research, vol. 13(1), pages 3-38, April.
  17. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
  18. Ma, Xiyuan & Rossi, Roberto & Archibald, Thomas Welsh, 2022. "Approximations for non-stationary stochastic lot-sizing under (s,Q)-type policy," European Journal of Operational Research, Elsevier, vol. 298(2), pages 573-584.
  19. Tarim, S. Armagan & Smith, Barbara M., 2008. "Constraint programming for computing non-stationary (R, S) inventory policies," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1004-1021, September.
  20. Visentin, Andrea & Prestwich, Steven & Rossi, Roberto & Tarim, S. Armagan, 2021. "Computing optimal (R,s,S) policy parameters by a hybrid of branch-and-bound and stochastic dynamic programming," European Journal of Operational Research, Elsevier, vol. 294(1), pages 91-99.
  21. Manmohan Aseri & Milind Dawande & Ganesh Janakiraman & Vijay Mookerjee, 2018. "Procurement Policies for Mobile-Promotion Platforms," Management Science, INFORMS, vol. 64(10), pages 4590-4607, October.
  22. Pujawan, I Nyoman & Silver, Edward A., 2008. "Augmenting the lot sizing order quantity when demand is probabilistic," European Journal of Operational Research, Elsevier, vol. 188(3), pages 705-722, August.
  23. Govindan, Kannan, 2015. "The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory," European Journal of Operational Research, Elsevier, vol. 242(2), pages 402-423.
  24. Zied Bahroun & Nidhal Belgacem, 2019. "Determination of dynamic safety stocks for cyclic production schedules," Operations Management Research, Springer, vol. 12(1), pages 62-93, June.
  25. Martel, Alain & Diaby, Moustapha & Boctor, Fayez, 1995. "Multiple items procurement under stochastic nonstationary demands," European Journal of Operational Research, Elsevier, vol. 87(1), pages 74-92, November.
  26. Gurkan, M. Edib & Tunc, Huseyin & Tarim, S. Armagan, 2022. "The joint stochastic lot sizing and pricing problem," Omega, Elsevier, vol. 108(C).
  27. Xiang, Mengyuan & Rossi, Roberto & Martin-Barragan, Belen & Tarim, S. Armagan, 2018. "Computing non-stationary (s, S) policies using mixed integer linear programming," European Journal of Operational Research, Elsevier, vol. 271(2), pages 490-500.
  28. Tempelmeier, Horst & Herpers, Sascha, 2011. "Dynamic uncapacitated lot sizing with random demand under a fillrate constraint," European Journal of Operational Research, Elsevier, vol. 212(3), pages 497-507, August.
  29. Körpeoglu, Ersin & Yaman, Hande & Selim Aktürk, M., 2011. "A multi-stage stochastic programming approach in master production scheduling," European Journal of Operational Research, Elsevier, vol. 213(1), pages 166-179, August.
  30. Tarim, S. Armagan & Kingsman, Brian G., 2006. "Modelling and computing (Rn, Sn) policies for inventory systems with non-stationary stochastic demand," European Journal of Operational Research, Elsevier, vol. 174(1), pages 581-599, October.
  31. Rossi, Roberto & Tarim, S. Armagan & Hnich, Brahim & Prestwich, Steven, 2010. "Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times," International Journal of Production Economics, Elsevier, vol. 127(1), pages 180-189, September.
  32. Yuchen Jiang & Juan Xu & Siqian Shen & Cong Shi, 2017. "Production planning problems with joint service-level guarantee: a computational study," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 38-58, January.
  33. Tempelmeier, Horst, 2007. "On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints," European Journal of Operational Research, Elsevier, vol. 181(1), pages 184-194, August.
  34. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  35. Lin, Chun-Ta & Chen, Yee Ming, 2009. "Hedging strategic flexibility in the distribution optimization problem," Omega, Elsevier, vol. 37(4), pages 826-837, August.
  36. Pauls-Worm, Karin G.J. & Hendrix, Eligius M.T. & Alcoba, Alejandro G. & Haijema, René, 2016. "Order quantities for perishable inventory control with non-stationary demand and a fill rate constraint," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 238-246.
  37. Wang, Lin & Lu, Zhiqiang & Ren, Yifei, 2020. "Joint production control and maintenance policy for a serial system with quality deterioration and stochastic demand," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
  38. Özgün Turgut & Florian Taube & Stefan Minner, 2018. "Data-driven retail inventory management with backroom effect," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(4), pages 945-968, October.
  39. Huseyin Tunc & Onur A. Kilic & S. Armagan Tarim & Roberto Rossi, 2018. "An Extended Mixed-Integer Programming Formulation and Dynamic Cut Generation Approach for the Stochastic Lot-Sizing Problem," INFORMS Journal on Computing, INFORMS, vol. 30(3), pages 492-506, August.
  40. Pauls-Worm, Karin G.J. & Hendrix, Eligius M.T. & Haijema, René & van der Vorst, Jack G.A.J., 2014. "An MILP approximation for ordering perishable products with non-stationary demand and service level constraints," International Journal of Production Economics, Elsevier, vol. 157(C), pages 133-146.
  41. Soysal, Mehmet & Bloemhof-Ruwaard, Jacqueline M. & Haijema, Rene & van der Vorst, Jack G.A.J., 2015. "Modeling an Inventory Routing Problem for perishable products with environmental considerations and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 164(C), pages 118-133.
  42. Roberto Rossi & S. Tarim & Brahim Hnich & Steven Prestwich, 2012. "Constraint programming for stochastic inventory systems under shortage cost," Annals of Operations Research, Springer, vol. 195(1), pages 49-71, May.
  43. Sereshti, Narges & Adulyasak, Yossiri & Jans, Raf, 2021. "The value of aggregate service levels in stochastic lot sizing problems," Omega, Elsevier, vol. 102(C).
  44. Simon Thevenin & Yossiri Adulyasak & Jean-François Cordeau, 2022. "Stochastic Dual Dynamic Programming for Multiechelon Lot Sizing with Component Substitution," INFORMS Journal on Computing, INFORMS, vol. 34(6), pages 3151-3169, November.
  45. Tiacci, Lorenzo & Saetta, Stefano, 2009. "An approach to evaluate the impact of interaction between demand forecasting method and stock control policy on the inventory system performances," International Journal of Production Economics, Elsevier, vol. 118(1), pages 63-71, March.
  46. Vargas, Vicente, 2009. "An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model," European Journal of Operational Research, Elsevier, vol. 198(2), pages 447-451, October.
  47. Koca, Esra & Yaman, Hande & Selim Aktürk, M., 2015. "Stochastic lot sizing problem with controllable processing times," Omega, Elsevier, vol. 53(C), pages 1-10.
  48. Schildbach, Georg & Morari, Manfred, 2016. "Scenario-based model predictive control for multi-echelon supply chain management," European Journal of Operational Research, Elsevier, vol. 252(2), pages 540-549.
  49. Nasr, Walid W. & Elshar, Ibrahim J., 2018. "Continuous inventory control with stochastic and non-stationary Markovian demand," European Journal of Operational Research, Elsevier, vol. 270(1), pages 198-217.
  50. Azaron, Amir & Tang, Ou & Tavakkoli-Moghaddam, Reza, 2009. "Dynamic lot sizing problem with continuous-time Markovian production cost," International Journal of Production Economics, Elsevier, vol. 120(2), pages 607-612, August.
  51. Stefano Coniglio & Arie M. C. A. Koster & Nils Spiekermann, 2018. "Lot sizing with storage losses under demand uncertainty," Journal of Combinatorial Optimization, Springer, vol. 36(3), pages 763-788, October.
  52. Gruson, Matthieu & Cordeau, Jean-François & Jans, Raf, 2021. "Benders decomposition for a stochastic three-level lot sizing and replenishment problem with a distribution structure," European Journal of Operational Research, Elsevier, vol. 291(1), pages 206-217.
  53. Céline Gicquel & Jianqiang Cheng, 2018. "A joint chance-constrained programming approach for the single-item capacitated lot-sizing problem with stochastic demand," Annals of Operations Research, Springer, vol. 264(1), pages 123-155, May.
  54. Xiang, Mengyuan & Rossi, Roberto & Martin-Barragan, Belen & Tarim, S. Armagan, 2023. "A mathematical programming-based solution method for the nonstationary inventory problem under correlated demand," European Journal of Operational Research, Elsevier, vol. 304(2), pages 515-524.
  55. Gutierrez-Alcoba, Alejandro & Rossi, Roberto & Martin-Barragan, Belen & Embley, Tim, 2023. "The stochastic inventory routing problem on electric roads," European Journal of Operational Research, Elsevier, vol. 310(1), pages 156-167.
  56. Hongmin Li & Stephen C. Graves & Woonghee Tim Huh, 2014. "Optimal Capacity Conversion for Product Transitions Under High Service Requirements," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 46-60, February.
  57. Taş, Duygu & Gendreau, Michel & Jabali, Ola & Jans, Raf, 2019. "A capacitated lot sizing problem with stochastic setup times and overtime," European Journal of Operational Research, Elsevier, vol. 273(1), pages 146-159.
  58. Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
  59. Tarim, S. Armagan & Dogru, Mustafa K. & Özen, Ulas & Rossi, Roberto, 2011. "An efficient computational method for a stochastic dynamic lot-sizing problem under service-level constraints," European Journal of Operational Research, Elsevier, vol. 215(3), pages 563-571, December.
  60. Gruson, Matthieu & Cordeau, Jean-François & Jans, Raf, 2018. "The impact of service level constraints in deterministic lot sizing with backlogging," Omega, Elsevier, vol. 79(C), pages 91-103.
  61. Zhang, Guoqing & Shi, Jianmai & Chaudhry, Sohail S. & Li, Xindan, 2019. "Multi-period multi-product acquisition planning with uncertain demands and supplier quantity discounts," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 132(C), pages 117-140.
  62. Chen, Frank Y. & Krass, Dmitry, 2001. "Inventory models with minimal service level constraints," European Journal of Operational Research, Elsevier, vol. 134(1), pages 120-140, October.
  63. Bakker, Hannah & Bindewald, Viktor & Dunke, Fabian & Nickel, Stefan, 2023. "Logistics for diagnostic testing: An adaptive decision-support framework," European Journal of Operational Research, Elsevier, vol. 311(3), pages 1120-1133.
  64. Z Hua & J Yang & F Huang & X Xu, 2009. "A static-dynamic strategy for spare part inventory systems with nonstationary stochastic demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1254-1263, September.
  65. Chen, Zhen & Rossi, Roberto, 2021. "A dynamic ordering policy for a stochastic inventory problem with cash constraints," Omega, Elsevier, vol. 102(C).
  66. Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
  67. Rossi, Roberto & Tarim, S. Armagan & Hnich, Brahim & Prestwich, Steven, 2011. "A state space augmentation algorithm for the replenishment cycle inventory policy," International Journal of Production Economics, Elsevier, vol. 133(1), pages 377-384, September.
  68. Tarim, S. Armagan & Kingsman, Brian G., 2004. "The stochastic dynamic production/inventory lot-sizing problem with service-level constraints," International Journal of Production Economics, Elsevier, vol. 88(1), pages 105-119, March.
  69. Dural-Selcuk, Gozdem & Rossi, Roberto & Kilic, Onur A. & Tarim, S. Armagan, 2020. "The benefit of receding horizon control: Near-optimal policies for stochastic inventory control," Omega, Elsevier, vol. 97(C).
  70. Nourelfath, Mustapha, 2011. "Service level robustness in stochastic production planning under random machine breakdowns," European Journal of Operational Research, Elsevier, vol. 212(1), pages 81-88, July.
  71. Choudhary, Devendra & Shankar, Ravi, 2015. "The value of VMI beyond information sharing in a single supplier multiple retailers supply chain under a non-stationary (Rn, Sn) policy," Omega, Elsevier, vol. 51(C), pages 59-70.
  72. Rossi, Roberto & Kilic, Onur A. & Tarim, S. Armagan, 2015. "Piecewise linear approximations for the static–dynamic uncertainty strategy in stochastic lot-sizing," Omega, Elsevier, vol. 50(C), pages 126-140.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.