IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v267y2018i3p1102-1109.html
   My bibliography  Save this article

Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints

Author

Listed:
  • Kilic, Onur A.
  • Tunc, Huseyin
  • Tarim, S. Armagan

Abstract

In this paper, we address the stochastic economic lot sizing problem with remanufacturing under service level constraints. The problem emerges in hybrid production systems where demand can be met via two alternative sources: manufacturing new products and remanufacturing returned products. The deterministic counterpart of this problem has been considered in the literature and it is shown to be NP-Hard. We focus on the case where period demands and returns are stochastic. The optimal solution to this problem is not a deterministic production schedule but a control policy, yet its structure has not yet been characterized. We propose two heuristic policies for the problem that make use of simple decision rules to control manufacturing and remanufacturing operations and present mathematical models thereof.

Suggested Citation

  • Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
  • Handle: RePEc:eee:ejores:v:267:y:2018:i:3:p:1102-1109
    DOI: 10.1016/j.ejor.2017.12.041
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S037722171731175X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2017.12.041?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mathijn Retel Helmrich & Raf Jans & Wilco van den Heuvel & Albert Wagelmans, 2014. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," IISE Transactions, Taylor & Francis Journals, vol. 46(1), pages 67-86.
    2. Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
    3. van der Laan, Erwin A. & Teunter, Ruud H., 2006. "Simple heuristics for push and pull remanufacturing policies," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1084-1102, December.
    4. Sifaleras, Angelo & Konstantaras, Ioannis & Mladenović, Nenad, 2015. "Variable neighborhood search for the economic lot sizing problem with product returns and recovery," International Journal of Production Economics, Elsevier, vol. 160(C), pages 133-143.
    5. L. Beril Toktay & Lawrence M. Wein & Stefanos A. Zenios, 2000. "Inventory Management of Remanufacturable Products," Management Science, INFORMS, vol. 46(11), pages 1412-1426, November.
    6. James H. Bookbinder & Jin-Yan Tan, 1988. "Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints," Management Science, INFORMS, vol. 34(9), pages 1096-1108, September.
    7. Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
    8. Chen, Frank Y. & Krass, Dmitry, 2001. "Inventory models with minimal service level constraints," European Journal of Operational Research, Elsevier, vol. 134(1), pages 120-140, October.
    9. Kiesmuller, G. P., 2003. "A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes," European Journal of Operational Research, Elsevier, vol. 147(1), pages 62-71, May.
    10. Koca, Esra & Yaman, Hande & Selim Aktürk, M., 2015. "Stochastic lot sizing problem with controllable processing times," Omega, Elsevier, vol. 53(C), pages 1-10.
    11. Athanassios N. Avramidis & James R. Wilson, 1998. "Correlation-Induction Techniques for Estimating Quantiles in Simulation Experiments," Operations Research, INFORMS, vol. 46(4), pages 574-591, August.
    12. Fatih Mutlu & Sila Çetinkaya & James Bookbinder, 2010. "An analytical model for computing the optimal time-and-quantity-based policy for consolidated shipments," IISE Transactions, Taylor & Francis Journals, vol. 42(5), pages 367-377.
    13. Tempelmeier, Horst, 2007. "On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints," European Journal of Operational Research, Elsevier, vol. 181(1), pages 184-194, August.
    14. Vlachos, Dimitrios & Dekker, Rommert, 2003. "Return handling options and order quantities for single period products," European Journal of Operational Research, Elsevier, vol. 151(1), pages 38-52, November.
    15. Kiesmuller, Gudrun P. & Scherer, Carsten W., 2003. "Computational issues in a stochastic finite horizon one product recovery inventory model," European Journal of Operational Research, Elsevier, vol. 146(3), pages 553-579, May.
    16. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
    17. Tarim, S. Armagan & Kingsman, Brian G., 2004. "The stochastic dynamic production/inventory lot-sizing problem with service-level constraints," International Journal of Production Economics, Elsevier, vol. 88(1), pages 105-119, March.
    18. Tunc, Huseyin & Kilic, Onur A. & Tarim, S. Armagan & Eksioglu, Burak, 2013. "A simple approach for assessing the cost of system nervousness," International Journal of Production Economics, Elsevier, vol. 141(2), pages 619-625.
    19. Panagiotidou, Sofia & Nenes, George & Zikopoulos, Christos & Tagaras, George, 2017. "Joint optimization of manufacturing/remanufacturing lot sizes under imperfect information on returns quality," European Journal of Operational Research, Elsevier, vol. 258(2), pages 537-551.
    20. Mahadevan, B. & Pyke, David F. & Fleischmann, Moritz, 2003. "Periodic review, push inventory policies for remanufacturing," European Journal of Operational Research, Elsevier, vol. 151(3), pages 536-551, December.
    21. Erwin van der Laan & Marc Salomon & Rommert Dekker & Luk Van Wassenhove, 1999. "Inventory Control in Hybrid Systems with Remanufacturing," Management Science, INFORMS, vol. 45(5), pages 733-747, May.
    22. Pan, Zhendong & Tang, Jiafu & Liu, Ou, 2009. "Capacitated dynamic lot sizing problems in closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 198(3), pages 810-821, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
    2. Franco Quezada & Céline Gicquel & Safia Kedad-Sidhoum, 2022. "Combining Polyhedral Approaches and Stochastic Dual Dynamic Integer Programming for Solving the Uncapacitated Lot-Sizing Problem Under Uncertainty," INFORMS Journal on Computing, INFORMS, vol. 34(2), pages 1024-1041, March.
    3. Bikash Koli Dey & Hyesung Seok, 2024. "Intelligent inventory management with autonomation and service strategy," Journal of Intelligent Manufacturing, Springer, vol. 35(1), pages 307-330, January.
    4. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    5. Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
    2. Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
    3. Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
    4. Zolfagharinia, Hossein & Hafezi, Maryam & Farahani, Reza Zanjirani & Fahimnia, Behnam, 2014. "A hybrid two-stock inventory control model for a reverse supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 67(C), pages 141-161.
    5. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    6. Rossi, Roberto & Kilic, Onur A. & Tarim, S. Armagan, 2015. "Piecewise linear approximations for the static–dynamic uncertainty strategy in stochastic lot-sizing," Omega, Elsevier, vol. 50(C), pages 126-140.
    7. Özen, Ulaş & Doğru, Mustafa K. & Armagan Tarim, S., 2012. "Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem," Omega, Elsevier, vol. 40(3), pages 348-357.
    8. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    9. Dural-Selcuk, Gozdem & Rossi, Roberto & Kilic, Onur A. & Tarim, S. Armagan, 2020. "The benefit of receding horizon control: Near-optimal policies for stochastic inventory control," Omega, Elsevier, vol. 97(C).
    10. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
    11. Gurkan, M. Edib & Tunc, Huseyin & Tarim, S. Armagan, 2022. "The joint stochastic lot sizing and pricing problem," Omega, Elsevier, vol. 108(C).
    12. Sereshti, Narges & Adulyasak, Yossiri & Jans, Raf, 2021. "The value of aggregate service levels in stochastic lot sizing problems," Omega, Elsevier, vol. 102(C).
    13. Choudhary, Devendra & Shankar, Ravi, 2015. "The value of VMI beyond information sharing in a single supplier multiple retailers supply chain under a non-stationary (Rn, Sn) policy," Omega, Elsevier, vol. 51(C), pages 59-70.
    14. Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
    15. Céline Gicquel & Jianqiang Cheng, 2018. "A joint chance-constrained programming approach for the single-item capacitated lot-sizing problem with stochastic demand," Annals of Operations Research, Springer, vol. 264(1), pages 123-155, May.
    16. Pauls-Worm, Karin G.J. & Hendrix, Eligius M.T. & Alcoba, Alejandro G. & Haijema, René, 2016. "Order quantities for perishable inventory control with non-stationary demand and a fill rate constraint," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 238-246.
    17. Hsueh, Che-Fu, 2011. "An inventory control model with consideration of remanufacturing and product life cycle," International Journal of Production Economics, Elsevier, vol. 133(2), pages 645-652, October.
    18. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    19. Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
    20. Rossi, Roberto & Tarim, S. Armagan & Hnich, Brahim & Prestwich, Steven, 2011. "A state space augmentation algorithm for the replenishment cycle inventory policy," International Journal of Production Economics, Elsevier, vol. 133(1), pages 377-384, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:267:y:2018:i:3:p:1102-1109. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.