IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v120y2000i2p228-249.html
   My bibliography  Save this item

Scheduling with batching: A review

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
  2. Chuleeporn Kusoncum & Kanchana Sethanan & Richard F. Hartl & Thitipong Jamrus, 2022. "Modified differential evolution and heuristic algorithms for dump tippler machine allocation in a typical sugar mill in Thailand," Operational Research, Springer, vol. 22(5), pages 5863-5895, November.
  3. Tang, Lixin & Huang, Lin, 2007. "Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production," International Journal of Production Economics, Elsevier, vol. 105(2), pages 357-371, February.
  4. Lin, Ran & Wang, Jun-Qiang & Oulamara, Ammar, 2023. "Online scheduling on parallel-batch machines with periodic availability constraints and job delivery," Omega, Elsevier, vol. 116(C).
  5. Peng Wu & Junheng Cheng & Feng Chu, 2021. "Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristics," Annals of Operations Research, Springer, vol. 296(1), pages 471-494, January.
  6. Jason Pan & Chi-Shiang Su, 2015. "Two parallel machines problem with job delivery coordination and availability constraint," Annals of Operations Research, Springer, vol. 235(1), pages 653-664, December.
  7. Courtad, Brenda & Baker, Kenneth & Magazine, Michael & Polak, George, 2017. "Minimizing flowtime for paired tasks," European Journal of Operational Research, Elsevier, vol. 259(3), pages 818-828.
  8. Altekin, F. Tevhide & Bukchin, Yossi, 2022. "A multi-objective optimization approach for exploring the cost and makespan trade-off in additive manufacturing," European Journal of Operational Research, Elsevier, vol. 301(1), pages 235-253.
  9. Elisabeth Lübbecke & Marco E. Lübbecke & Rolf H. Möhring, 2019. "Ship Traffic Optimization for the Kiel Canal," Operations Research, INFORMS, vol. 67(3), pages 791-812, May.
  10. Yang, Fan & Davari, Morteza & Wei, Wenchao & Hermans, Ben & Leus, Roel, 2022. "Scheduling a single parallel-batching machine with non-identical job sizes and incompatible job families," European Journal of Operational Research, Elsevier, vol. 303(2), pages 602-615.
  11. Herr, Oliver & Goel, Asvin, 2016. "Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints," European Journal of Operational Research, Elsevier, vol. 248(1), pages 123-135.
  12. Xu, Jun & Wang, Jun-Qiang & Liu, Zhixin, 2022. "Parallel batch scheduling: Impact of increasing machine capacity," Omega, Elsevier, vol. 108(C).
  13. Tamssaouet, Karim & Dauzère-Pérès, Stéphane & Knopp, Sebastian & Bitar, Abdoul & Yugma, Claude, 2022. "Multiobjective optimization for complex flexible job-shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 296(1), pages 87-100.
  14. Leung, Joseph Y.-T. & Ng, C.T. & Cheng, T.C. Edwin, 2008. "Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1090-1099, June.
  15. Bock, Stefan, 2020. "Optimally solving a versatile Traveling Salesman Problem on tree networks with soft due dates and multiple congestion scenarios," European Journal of Operational Research, Elsevier, vol. 283(3), pages 863-882.
  16. Yuzhong Zhang & Zhigang Cao, 2008. "An asymptotic PTAS for batch scheduling with nonidentical job sizes to minimize makespan," Journal of Combinatorial Optimization, Springer, vol. 16(2), pages 119-126, August.
  17. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
  18. Barketau, M.S. & Cheng, T.C.E. & Kovalyov, M.Y., 2008. "Batch scheduling of deteriorating reworkables," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1317-1326, September.
  19. Lixin Tang & Hua Gong & Jiyin Liu & Feng Li, 2014. "Bicriteria scheduling on a single batching machine with job transportation and deterioration considerations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(4), pages 269-285, June.
  20. Janiak, Adam & Kovalyov, Mikhail Y. & Portmann, Marie-Claude, 2005. "Single machine group scheduling with resource dependent setup and processing times," European Journal of Operational Research, Elsevier, vol. 162(1), pages 112-121, April.
  21. Monch, Lars & Schabacker, Rene & Pabst, Detlef & Fowler, John W., 2007. "Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops," European Journal of Operational Research, Elsevier, vol. 177(3), pages 2100-2118, March.
  22. Gahm, Christian & Uzunoglu, Aykut & Wahl, Stefan & Ganschinietz, Chantal & Tuma, Axel, 2022. "Applying machine learning for the anticipation of complex nesting solutions in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 296(3), pages 819-836.
  23. Jinwen Ou, 2020. "Near-linear-time approximation algorithms for scheduling a batch-processing machine with setups and job rejection," Journal of Scheduling, Springer, vol. 23(5), pages 525-538, October.
  24. Agnetis, Alessandro & Aloulou, Mohamed Ali & Fu, Liang-Liang & Kovalyov, Mikhail Y., 2015. "Two faster algorithms for coordination of production and batch delivery: A note," European Journal of Operational Research, Elsevier, vol. 241(3), pages 927-930.
  25. Averbakh, Igor, 2010. "On-line integrated production-distribution scheduling problems with capacitated deliveries," European Journal of Operational Research, Elsevier, vol. 200(2), pages 377-384, January.
  26. A. Beynaghi & F. Moztarzadeh & A. Shahmardan & R. Alizadeh & J. Salimi & M. Mozafari, 2019. "Makespan minimization for batching work and rework process on a single facility with an aging effect: a hybrid meta-heuristic algorithm for sustainable production management," Journal of Intelligent Manufacturing, Springer, vol. 30(1), pages 33-45, January.
  27. Biber Nurit & Mor Baruch & Schlissel Yitzhak & Shapira Dana, 2023. "Lot scheduling involving completion time problems on identical parallel machines," Operational Research, Springer, vol. 23(1), pages 1-29, March.
  28. Wei Jiang & Yilan Shen & Lingxuan Liu & Xiancong Zhao & Leyuan Shi, 2022. "A new method for a class of parallel batch machine scheduling problem," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 518-550, June.
  29. Lin, B. M. T. & Jeng, A. A. K., 2004. "Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 91(2), pages 121-134, September.
  30. Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
  31. Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
  32. Dolgui, Alexandre & Hashemi-Petroodi, S. Ehsan & Kovalev, Sergey & Kovalyov, Mikhail Y., 2021. "Profitability of a multi-model manufacturing line versus multiple dedicated lines," International Journal of Production Economics, Elsevier, vol. 236(C).
  33. Hanen, Claire & Hanzalek, Zdenek, 2020. "Grouping tasks to save energy in a cyclic scheduling problem: A complexity study," European Journal of Operational Research, Elsevier, vol. 284(2), pages 445-459.
  34. Lele Zhang & Andrew Wirth, 2010. "On-line machine scheduling with batch setups," Journal of Combinatorial Optimization, Springer, vol. 20(3), pages 285-306, October.
  35. Shi-Sheng Li & Ren-Xia Chen & Qi Feng, 2016. "Scheduling two job families on a single machine with two competitive agents," Journal of Combinatorial Optimization, Springer, vol. 32(3), pages 784-799, October.
  36. Kovalyov, M. Y. & Potts, C. N. & Strusevich, V. A., 2004. "Batching decisions for assembly production systems," European Journal of Operational Research, Elsevier, vol. 157(3), pages 620-642, September.
  37. Artur Alves Pessoa & Teobaldo Bulhões & Vitor Nesello & Anand Subramanian, 2022. "Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling," INFORMS Journal on Computing, INFORMS, vol. 34(3), pages 1512-1530, May.
  38. Wu, Kan & Huang, Edward & Wang, Mengchang & Zheng, Meimei, 2022. "Job scheduling of diffusion furnaces in semiconductor fabrication facilities," European Journal of Operational Research, Elsevier, vol. 301(1), pages 141-152.
  39. Dominik Kress & Sebastian Meiswinkel & Erwin Pesch, 2018. "Mechanism design for machine scheduling problems: classification and literature overview," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 583-611, July.
  40. Jun-Qiang Wang & Guo-Qiang Fan & Zhixin Liu, 2020. "Mixed batch scheduling on identical machines," Journal of Scheduling, Springer, vol. 23(4), pages 487-496, August.
  41. Shisheng Li & T.C.E. Cheng & C.T. Ng & Jinjiang Yuan, 2017. "Two‐agent scheduling on a single sequential and compatible batching machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 64(8), pages 628-641, December.
  42. Anurag Agarwal & Varghese S. Jacob & Hasan Pirkul, 2006. "An Improved Augmented Neural-Network Approach for Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 18(1), pages 119-128, February.
  43. Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013. "Family sequencing and cooperation," European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
  44. F Jin & J N D Gupta & S Song & C Wu, 2010. "Single machine scheduling with sequence-dependent family setups to minimize maximum lateness," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(7), pages 1181-1189, July.
  45. Li, Xueping & Zhang, Kaike, 2018. "Single batch processing machine scheduling with two-dimensional bin packing constraints," International Journal of Production Economics, Elsevier, vol. 196(C), pages 113-121.
  46. Janiak, Adam & Rudek, RadosLaw, 2010. "A note on a makespan minimization problem with a multi-ability learning effect," Omega, Elsevier, vol. 38(3-4), pages 213-217, June.
  47. Cheng, T. C. Edwin & Janiak, Adam & Kovalyov, Mikhail Y., 2001. "Single machine batch scheduling with resource dependent setup and processing times," European Journal of Operational Research, Elsevier, vol. 135(1), pages 177-183, November.
  48. Jae-Min Yu & Rong Huang & Dong-Ho Lee, 2017. "Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3266-3282, June.
  49. Lele Zhang & Andrew Wirth, 2016. "Online Machine Scheduling with Family Setups," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(04), pages 1-16, August.
  50. Shabtay, Dvir, 2014. "The single machine serial batch scheduling problem with rejection to minimize total completion time and total rejection cost," European Journal of Operational Research, Elsevier, vol. 233(1), pages 64-74.
  51. Florian Mischek & Nysret Musliu, 2021. "A local search framework for industrial test laboratory scheduling," Annals of Operations Research, Springer, vol. 302(2), pages 533-562, July.
  52. Melouk, Sharif & Damodaran, Purushothaman & Chang, Ping-Yu, 2004. "Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing," International Journal of Production Economics, Elsevier, vol. 87(2), pages 141-147, January.
  53. Vo[ss], Stefan & Witt, Andreas, 2007. "Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application," International Journal of Production Economics, Elsevier, vol. 105(2), pages 445-458, February.
  54. Jacomine Grobler & Andries Engelbrecht & Schalk Kok & Sarma Yadavalli, 2010. "Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time," Annals of Operations Research, Springer, vol. 180(1), pages 165-196, November.
  55. Chakhlevitch, Konstantin & Glass, Celia A. & Kellerer, Hans, 2011. "Batch machine production with perishability time windows and limited batch size," European Journal of Operational Research, Elsevier, vol. 210(1), pages 39-47, April.
  56. X Wang & L Tang, 2011. "Scheduling a single machine with multiple job processing ability to minimize makespan," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(8), pages 1555-1565, August.
  57. Ciftci, B.B. & Borm, P.E.M. & Hamers, H.J.M. & Slikker, M., 2008. "Batch Sequencing and Cooperation," Discussion Paper 2008-100, Tilburg University, Center for Economic Research.
  58. Mosheiov, Gur & Oron, Daniel, 2005. "A note on flow-shop and job-shop batch scheduling with identical processing-time jobs," European Journal of Operational Research, Elsevier, vol. 161(1), pages 285-291, February.
  59. Bo Chen & Xiaotie Deng & Wenan Zang, 2004. "On-Line Scheduling a Batch Processing System to Minimize Total Weighted Job Completion Time," Journal of Combinatorial Optimization, Springer, vol. 8(1), pages 85-95, March.
  60. Wang, Xiuli & Cheng, T.C.E., 2009. "Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers," International Journal of Production Economics, Elsevier, vol. 119(1), pages 199-206, May.
  61. George Steiner & Rui Zhang, 2011. "Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries," Annals of Operations Research, Springer, vol. 191(1), pages 171-181, November.
  62. Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 0. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$P2→D|v=1,c=1|Cmax," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-12.
  63. A. Dolgui & M. Kovalyov & K. Shchamialiova, 2011. "Multi-product lot-sizing and sequencing on a single imperfect machine," Computational Optimization and Applications, Springer, vol. 50(3), pages 465-482, December.
  64. Dunstall, Simon & Wirth, Andrew, 2005. "A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines," European Journal of Operational Research, Elsevier, vol. 167(2), pages 283-296, December.
  65. Selvarajah, Esaignani & Zhang, Rui, 2014. "Supply chain scheduling at the manufacturer to minimize inventory holding and delivery costs," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 117-124.
  66. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
  67. Wang, Xiuli & Cheng, T.C.E., 2009. "Production scheduling with supply and delivery considerations to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 194(3), pages 743-752, May.
  68. Pereira Lopes, Manuel J. & de Carvalho, J.M. Valerio, 2007. "A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1508-1527, February.
  69. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
  70. Liron Ravner & Yoni Nazarathy, 2017. "Scheduling for a processor sharing system with linear slowdown," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 86(1), pages 71-102, August.
  71. Christiaens, Jan & Çalik, Hatice & Wauters, Tony & Chirayil Chandrasekharan, Reshma & Vanden Berghe, Greet, 2020. "The prisoner transportation problem," European Journal of Operational Research, Elsevier, vol. 284(3), pages 1058-1073.
  72. Mazdeh, Mohammad Mahdavi & Sarhadi, Mansoor & Hindi, Khalil S., 2007. "A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs," European Journal of Operational Research, Elsevier, vol. 183(1), pages 74-86, November.
  73. Nicholas G. Hall & Zhixin Liu, 2010. "Capacity Allocation and Scheduling in Supply Chains," Operations Research, INFORMS, vol. 58(6), pages 1711-1725, December.
  74. Gur Mosheiov & Daniel Oron & Yaacov Ritov, 2004. "Flow‐shop batch scheduling with identical processing‐time jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 783-799, September.
  75. Nicholas G. Hall & Chris N. Potts, 2003. "Supply chain scheduling: Batching and delivery," Operations Research, INFORMS, vol. 51(4), pages 566-584, August.
  76. Mosheiov, Gur & Oron, Daniel, 2008. "A single machine batch scheduling problem with bounded batch size," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1069-1079, June.
  77. Ou, Jinwen & Lu, Lingfa & Zhong, Xueling, 2023. "Parallel-batch scheduling with rejection: Structural properties and approximation algorithms," European Journal of Operational Research, Elsevier, vol. 310(3), pages 1017-1032.
  78. Pang, King-Wah, 2013. "A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness," International Journal of Production Economics, Elsevier, vol. 141(1), pages 127-136.
  79. Lin, B.M.T. & Cheng, T.C.E. & Chou, A.S.C., 2007. "Scheduling in an assembly-type production chain with batch transfer," Omega, Elsevier, vol. 35(2), pages 143-151, April.
  80. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
  81. Florian Jaehn & Sergey Kovalev & Mikhail Y. Kovalyov & Erwin Pesch, 2014. "Multiproduct batching and scheduling with buffered rework: The case of a car paint shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(6), pages 458-471, September.
  82. Q. Q. Nong & G. Q. Fan & Q. Z. Fang, 2017. "A coordination mechanism for a scheduling game with parallel-batching machines," Journal of Combinatorial Optimization, Springer, vol. 33(2), pages 567-579, February.
  83. Öncü Hazır & Safia Kedad-Sidhoum, 2014. "Batch sizing and just-in-time scheduling with common due date," Annals of Operations Research, Springer, vol. 213(1), pages 187-202, February.
  84. Rongqi Li & Zhiyi Tan & Qianyu Zhu, 0. "Batch scheduling of nonidentical job sizes with minsum criteria," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-22.
  85. Xinxin Hu & James D Blocher & Hans Sebastian Heese & Feng Zhou, 2016. "Scheduling products with subassemblies and changeover time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(8), pages 1025-1033, August.
  86. Wu, Wei & Hayashi, Takito & Haruyasu, Kato & Tang, Liang, 2023. "Exact algorithms based on a constrained shortest path model for robust serial-batch and parallel-batch scheduling problems," European Journal of Operational Research, Elsevier, vol. 307(1), pages 82-102.
  87. Schaller, Jeffrey, 2007. "Scheduling on a single machine with family setups to minimize total tardiness," International Journal of Production Economics, Elsevier, vol. 105(2), pages 329-344, February.
  88. Li, Shisheng & Ng, C.T. & Cheng, T.C.E. & Yuan, Jinjiang, 2011. "Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 210(3), pages 482-488, May.
  89. Zhou, Feng & Blocher, James D. & Hu, Xinxin & Sebastian Heese, H., 2014. "Optimal single machine scheduling of products with components and changeover cost," European Journal of Operational Research, Elsevier, vol. 233(1), pages 75-83.
  90. Guruprasad Pundoor & Zhi‐Long Chen, 2005. "Scheduling a production–distribution system to optimize the tradeoff between delivery tardiness and distribution cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 571-589, September.
  91. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
  92. Jens Rocholl & Lars Mönch & John Fowler, 2020. "Bi-criteria parallel batch machine scheduling to minimize total weighted tardiness and electricity cost," Journal of Business Economics, Springer, vol. 90(9), pages 1345-1381, November.
  93. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
  94. Tang, Lixin & Zhao, Xiaoli & Liu, Jiyin & Leung, Joseph Y.-T., 2017. "Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine," European Journal of Operational Research, Elsevier, vol. 263(2), pages 401-411.
  95. Simon Emde & Shohre Zehtabian & Yann Disser, 2023. "Point-to-point and milk run delivery scheduling: models, complexity results, and algorithms based on Benders decomposition," Annals of Operations Research, Springer, vol. 322(1), pages 467-496, March.
  96. Jia, Zhao-hong & Leung, Joseph Y.-T., 2015. "A meta-heuristic to minimize makespan for parallel batch machines with arbitrary job sizes," European Journal of Operational Research, Elsevier, vol. 240(3), pages 649-665.
  97. Wenhua Li & Jinjiang Yuan & Yixun Lin, 2007. "A note on special optimal batching structures to minimize total weighted completion time," Journal of Combinatorial Optimization, Springer, vol. 14(4), pages 475-480, November.
  98. Jia, Zhao-hong & Li, Kai & Leung, Joseph Y.-T., 2015. "Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities," International Journal of Production Economics, Elsevier, vol. 169(C), pages 1-10.
  99. Zee, Durk Jouke van der, 2002. "Look-ahead strategies for controlling batch operations in industry : basic insights in rule construction," Research Report 02A68, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  100. Guillaume Aupy & Manu Shantharam & Anne Benoit & Yves Robert & Padma Raghavan, 2016. "Co-scheduling algorithms for high-throughput workload execution," Journal of Scheduling, Springer, vol. 19(6), pages 627-640, December.
  101. Drótos, Márton & Erdos, Gábor & Kis, Tamás, 2009. "Computing lower and upper bounds for a large-scale industrial job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 197(1), pages 296-306, August.
  102. C. Ng & T. Cheng & Adam Janiak & Mikhail Kovalyov, 2005. "Group Scheduling with Controllable Setup and Processing Times: Minimizing Total Weighted Completion Time," Annals of Operations Research, Springer, vol. 133(1), pages 163-174, January.
  103. Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
  104. Malapert, Arnaud & Guéret, Christelle & Rousseau, Louis-Martin, 2012. "A constraint programming approach for a batch processing problem with non-identical job sizes," European Journal of Operational Research, Elsevier, vol. 221(3), pages 533-545.
  105. Liji Shen & Jatinder N. D. Gupta, 2018. "Family scheduling with batch availability in flow shops to minimize makespan," Journal of Scheduling, Springer, vol. 21(2), pages 235-249, April.
  106. Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Nossack, Jenny & Pesch, Erwin, 2014. "Minimizing setup costs in a transfer line design problem with sequential operation processing," International Journal of Production Economics, Elsevier, vol. 151(C), pages 186-194.
  107. Ozturk, Onur & Begen, Mehmet A. & Zaric, Gregory S., 2014. "A branch and bound based heuristic for makespan minimization of washing operations in hospital sterilization services," European Journal of Operational Research, Elsevier, vol. 239(1), pages 214-226.
  108. repec:dgr:rugsom:02a68 is not listed on IDEAS
  109. Otto, Alena & Li, Xiyu, 2020. "Product sequencing in multiple-piece-flow assembly lines," Omega, Elsevier, vol. 91(C).
  110. Eduardo Queiroga & Rian G. S. Pinheiro & Quentin Christ & Anand Subramanian & Artur A. Pessoa, 2021. "Iterated local search for single machine total weighted tardiness batch scheduling," Journal of Heuristics, Springer, vol. 27(3), pages 353-438, June.
  111. Zhi‐Long Chen & Warren B. Powell, 2003. "Exact algorithms for scheduling multiple families of jobs on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(7), pages 823-840, October.
  112. Gaby Pinto & Yariv Ben-Dov & Gad Rabinowitz, 2013. "Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)," Annals of Operations Research, Springer, vol. 206(1), pages 311-339, July.
  113. Santini, Alberto & Bartolini, Enrico & Schneider, Michael & Greco de Lemos, Vinicius, 2021. "The crop growth planning problem in vertical farming," European Journal of Operational Research, Elsevier, vol. 294(1), pages 377-390.
  114. David Conradie & Leilani Morison & Johan Joubert, 2008. "Scheduling at coal handling facilities using Simulated Annealing," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 68(2), pages 277-293, October.
  115. Ivan Kristianto Singgih & Onyu Yu & Byung-In Kim & Jeongin Koo & Seungdoe Lee, 2020. "Production scheduling problem in a factory of automobile component primer painting," Journal of Intelligent Manufacturing, Springer, vol. 31(6), pages 1483-1496, August.
  116. Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
  117. Zhou, Shengchao & Jin, Mingzhou & Du, Ni, 2020. "Energy-efficient scheduling of a single batch processing machine with dynamic job arrival times," Energy, Elsevier, vol. 209(C).
  118. Nodari Vakhania & Badri Mamporia, 2020. "Fast Algorithms for Basic Supply Chain Scheduling Problems," Mathematics, MDPI, vol. 8(11), pages 1-19, November.
  119. Baruch Mor & Gur Mosheiov, 2012. "Batch scheduling with step‐deteriorating processing times to minimize flowtime," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(8), pages 587-600, December.
  120. Chung Keung Poon & Wenci Yu, 2005. "On-Line Scheduling Algorithms for a Batch Machine with Finite Capacity," Journal of Combinatorial Optimization, Springer, vol. 9(2), pages 167-186, March.
  121. Xiuli Wang & T. C. Edwin Cheng, 2007. "Machine scheduling with an availability constraint and job delivery coordination," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 11-20, February.
  122. Damodaran, Purushothaman & Kumar Manjeshwar, Praveen & Srihari, Krishnaswami, 2006. "Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms," International Journal of Production Economics, Elsevier, vol. 103(2), pages 882-891, October.
  123. Yuan Gao & Jinjiang Yuan, 2019. "Unbounded parallel-batch scheduling under agreeable release and processing to minimize total weighted number of tardy jobs," Journal of Combinatorial Optimization, Springer, vol. 38(3), pages 698-711, October.
  124. Jorge M. S. Valente, 2005. "Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups," FEP Working Papers 186, Universidade do Porto, Faculdade de Economia do Porto.
  125. Lixin Tang & Feng Li & Jiyin Liu, 2015. "Integrated scheduling of loading and transportation with tractors and semitrailers separated," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(5), pages 416-433, August.
  126. Vladimir Krasik & Joseph Leung & Michael Pinedo & Jiawei Zhang, 2008. "Scheduling multiple products on parallel machines with setup costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(7), pages 654-669, October.
  127. Amin-Naseri, Mohammad Reza & Beheshti-Nia, Mohammad Ali, 2009. "Hybrid flow shop scheduling with parallel batching," International Journal of Production Economics, Elsevier, vol. 117(1), pages 185-196, January.
  128. Daniel Ng, C. T. & Cheng, T. C. Edwin & Kovalyov, Mikhail Y., 2004. "Single machine batch scheduling with jointly compressible setup and processing times," European Journal of Operational Research, Elsevier, vol. 153(1), pages 211-219, February.
  129. Quadt, Daniel & Kuhn, Heinrich, 2007. "Batch scheduling of jobs with identical process times on flexible flow lines," International Journal of Production Economics, Elsevier, vol. 105(2), pages 385-401, February.
  130. Sanja Petrovic & Carole Fayad & Dobrila Petrovic & Edmund Burke & Graham Kendall, 2008. "Fuzzy job shop scheduling with lot-sizing," Annals of Operations Research, Springer, vol. 159(1), pages 275-292, March.
  131. Yuan Gao & Jinjiang Yuan & Zhigang Wei, 2019. "Unbounded parallel-batch scheduling with drop-line tasks," Journal of Scheduling, Springer, vol. 22(4), pages 449-463, August.
  132. Liji Shen & Lars Mönch & Udo Buscher, 2013. "An iterative approach for the serial batching problem with parallel machines and job families," Annals of Operations Research, Springer, vol. 206(1), pages 425-448, July.
  133. Ciavotta, Michele & Detti, Paolo & Meloni, Carlo & Pranzo, Marco, 2008. "A bi-objective coordination setup problem in a two-stage production system," European Journal of Operational Research, Elsevier, vol. 189(3), pages 734-745, September.
  134. Passchyn, Ward & Coene, Sofie & Briskorn, Dirk & Hurink, Johann L. & Spieksma, Frits C.R. & Vanden Berghe, Greet, 2016. "The lockmaster’s problem," European Journal of Operational Research, Elsevier, vol. 251(2), pages 432-441.
  135. Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
  136. Gupta, Jatinder N.D. & Stafford, Edward Jr., 2006. "Flowshop scheduling research after five decades," European Journal of Operational Research, Elsevier, vol. 169(3), pages 699-711, March.
  137. Beat Gfeller & Leon Peeters & Birgitta Weber & Peter Widmayer, 2009. "Single machine batch scheduling with release times," Journal of Combinatorial Optimization, Springer, vol. 17(3), pages 323-338, April.
  138. Rongqi Li & Zhiyi Tan & Qianyu Zhu, 2021. "Batch scheduling of nonidentical job sizes with minsum criteria," Journal of Combinatorial Optimization, Springer, vol. 42(3), pages 543-564, October.
  139. Pranzo, Marco, 2004. "Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times," European Journal of Operational Research, Elsevier, vol. 153(3), pages 581-592, March.
  140. Miaomiao Jin & Xiaoxia Liu & Wenchang Luo, 2020. "Single-Machine Parallel-Batch Scheduling with Nonidentical Job Sizes and Rejection," Mathematics, MDPI, vol. 8(2), pages 1-8, February.
  141. Bredstrom, David & Lundgren, Jan T. & Ronnqvist, Mikael & Carlsson, Dick & Mason, Andrew, 2004. "Supply chain optimization in the pulp mill industry--IP models, column generation and novel constraint branches," European Journal of Operational Research, Elsevier, vol. 156(1), pages 2-22, July.
  142. Alessandro Druetto & Erica Pastore & Elena Rener, 2023. "Parallel batching with multi-size jobs and incompatible job families," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(2), pages 440-458, July.
  143. Laub, Jeffrey D. & Fowler, John W. & Keha, Ahmet B., 2007. "Minimizing makespan with multiple-orders-per-job in a two-machine flowshop," European Journal of Operational Research, Elsevier, vol. 182(1), pages 63-79, October.
  144. Koulamas, Christos & Kyparisis, George J., 2008. "Single-machine scheduling problems with past-sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1045-1049, June.
  145. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
  146. Yijie Li, 2023. "Bicriteria fabrication scheduling of two-component jobs on a single machine," Operational Research, Springer, vol. 23(4), pages 1-13, December.
  147. Hark-Chin Hwang & Soo Y. Chang, 2005. "Order Consolidation for Batch Processing," Journal of Combinatorial Optimization, Springer, vol. 9(1), pages 121-138, February.
  148. Al-Anzi, Fawaz S. & Allahverdi, Ali & Kovalyov, Mikhail Y., 2007. "Batching deteriorating items with applications in computer communication and reverse logistics," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1002-1011, November.
  149. Yuan, J.J. & Lin, Y.X. & Cheng, T.C.E. & Ng, C.T., 2007. "Single machine serial-batching scheduling problem with a common batch size to minimize total weighted completion time," International Journal of Production Economics, Elsevier, vol. 105(2), pages 402-406, February.
  150. Dominik Kress & Maksim Barketau & Erwin Pesch, 2018. "Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines," Journal of Scheduling, Springer, vol. 21(6), pages 595-606, December.
  151. Gribkovskaia, Irina V. & Kovalev, Sergey & Werner, Frank, 2010. "Batching for work and rework processes on dedicated facilities to minimize the makespan," Omega, Elsevier, vol. 38(6), pages 522-527, December.
  152. C T Daniel Ng & T C E Cheng & M Y Kovalyov, 2003. "Batch scheduling with controllable setup and processing times to minimize total completion time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 499-506, May.
  153. Nong, Qingqin & Yuan, Jinjiang & Fu, Ruyan & Lin, Lin & Tian, Ji, 2008. "The single-machine parallel-batching on-line scheduling problem with family jobs to minimize makespan," International Journal of Production Economics, Elsevier, vol. 111(2), pages 435-440, February.
  154. Xu, Rui & Chen, Huaping & Li, Xueping, 2013. "A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system," International Journal of Production Economics, Elsevier, vol. 145(1), pages 371-386.
  155. Esswein, Carl & Billaut, Jean-Charles & Strusevich, Vitaly A., 2005. "Two-machine shop scheduling: Compromise between flexibility and makespan value," European Journal of Operational Research, Elsevier, vol. 167(3), pages 796-809, December.
  156. Li, Wenhua & Yuan, Jinjiang, 2006. "Single machine parallel batch scheduling problem with release dates and three hierarchical criteria to minimize makespan, machine occupation time and stocking cost," International Journal of Production Economics, Elsevier, vol. 102(1), pages 143-148, July.
  157. Fehmi Tanrisever & Erhan Kutanoglu, 2008. "Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem," Annals of Operations Research, Springer, vol. 159(1), pages 5-24, March.
  158. Gyorgy Dosa & Zhiyi Tan & Zsolt Tuza & Yujie Yan & Cecília Sik Lányi, 2014. "Improved bounds for batch scheduling with nonidentical job sizes," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(5), pages 351-358, August.
  159. Florian Mischek & Nysret Musliu & Andrea Schaerf, 2023. "Local search approaches for the test laboratory scheduling problem with variable task grouping," Journal of Scheduling, Springer, vol. 26(5), pages 457-477, October.
  160. A. G. Leeftink & R. J. Boucherie & E. W. Hans & M. A. M. Verdaasdonk & I. M. H. Vliegen & P. J. Diest, 2018. "Batch scheduling in the histopathology laboratory," Flexible Services and Manufacturing Journal, Springer, vol. 30(1), pages 171-197, June.
  161. Shaojun Lu & Min Kong & Zhiping Zhou & Xinbao Liu & Siwen Liu, 2022. "A hybrid metaheuristic for a semiconductor production scheduling problem with deterioration effect and resource constraints," Operational Research, Springer, vol. 22(5), pages 5405-5440, November.
  162. Li, Kai & Jia, Zhao-hong & Leung, Joseph Y.-T., 2015. "Integrated production and delivery on parallel batching machines," European Journal of Operational Research, Elsevier, vol. 247(3), pages 755-763.
  163. B. Lin & T. Cheng, 2005. "Two-Machine Flowshop Batching and Scheduling," Annals of Operations Research, Springer, vol. 133(1), pages 149-161, January.
  164. Ridouard, Frédéric & Richard, Pascal & Martineau, Patrick, 2008. "On-line scheduling on a batch processing machine with unbounded batch size to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1327-1342, September.
  165. F. Hwang & M. Kovalyov & B. Lin, 2014. "Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence," Annals of Operations Research, Springer, vol. 217(1), pages 263-279, June.
  166. Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.
  167. Ji, Min & Cheng, T.C.E., 2010. "Batch scheduling of simple linear deteriorating jobs on a single machine to minimize makespan," European Journal of Operational Research, Elsevier, vol. 202(1), pages 90-98, April.
  168. Ebben, Mark & van der Zee, Durk-Jouke & van der Heijden, Matthieu, 2004. "Dynamic one-way traffic control in automated transportation systems," Transportation Research Part B: Methodological, Elsevier, vol. 38(5), pages 441-458, June.
  169. Yinling Wang & Yan Lan & Xin Chen & Xin Han & Yong Piao, 2022. "A tight approximation algorithm for problem $$P2\rightarrow D|v=1,c=1|C_{\max }$$ P 2 → D | v = 1 , c = 1 | C max," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2195-2206, November.
  170. Li, Shuguang, 2017. "Approximation algorithms for scheduling jobs with release times and arbitrary sizes on batch machines with non-identical capacities," European Journal of Operational Research, Elsevier, vol. 263(3), pages 815-826.
  171. Mosheiov, Gur & Oron, Daniel, 2008. "Open-shop batch scheduling with identical jobs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1282-1292, June.
  172. Matin, Hossein N.Z. & Salmasi, Nasser & Shahvari, Omid, 2017. "Makespan minimization in flowshop batch processing problem with different batch compositions on machines," International Journal of Production Economics, Elsevier, vol. 193(C), pages 832-844.
  173. Tarhan, İstenç & Oğuz, Ceyda, 2022. "A matheuristic for the generalized order acceptance and scheduling problem," European Journal of Operational Research, Elsevier, vol. 299(1), pages 87-103.
  174. Nicholas Hall & Chris Potts, 2005. "The Coordination of Scheduling and Batch Deliveries," Annals of Operations Research, Springer, vol. 135(1), pages 41-64, March.
  175. Tang, Lixin & Zhao, Yufang, 2008. "Scheduling a single semi-continuous batching machine," Omega, Elsevier, vol. 36(6), pages 992-1004, December.
  176. Wang, Jun-Qiang & Fan, Guo-Qiang & Zhang, Yingqian & Zhang, Cheng-Wu & Leung, Joseph Y.-T., 2017. "Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes," European Journal of Operational Research, Elsevier, vol. 258(2), pages 478-490.
  177. Li, Shuguang, 2017. "Parallel batch scheduling with inclusive processing set restrictions and non-identical capacities to minimize makespan," European Journal of Operational Research, Elsevier, vol. 260(1), pages 12-20.
  178. B. M. T. Lin & T. C. E. Cheng, 2011. "Scheduling with centralized and decentralized batching policies in concurrent open shops," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(1), pages 17-27, February.
  179. Kellerer, H. & Strusevich, V. A., 2003. "Scheduling parallel dedicated machines under a single non-shared resource," European Journal of Operational Research, Elsevier, vol. 147(2), pages 345-364, June.
  180. Lushchakova, Irina N. & Strusevich, Vitaly A., 2010. "Scheduling incompatible tasks on two machines," European Journal of Operational Research, Elsevier, vol. 200(2), pages 334-346, January.
  181. Lin, Ran & Wang, Jun-Qiang & Liu, Zhixin & Xu, Jun, 2023. "Best possible algorithms for online scheduling on identical batch machines with periodic pulse interruptions," European Journal of Operational Research, Elsevier, vol. 309(1), pages 53-64.
  182. Kramer, Arthur & Iori, Manuel & Lacomme, Philippe, 2021. "Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization," European Journal of Operational Research, Elsevier, vol. 289(3), pages 825-840.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.