Hybrid flow shop scheduling with parallel batching

Author

Listed:
  • Amin-Naseri, Mohammad Reza
  • Beheshti-Nia, Mohammad Ali

Abstract

In this research the problem of parallel batch scheduling in a hybrid flow shop environment with minimizing Cmax is studied. In parallel batching it is assumed that machines in some stages are able to process a number of operations simultaneously. Since the problem is NP-hard, three heuristic algorithms are developed to give near optimal solutions. Since this problem has not been studied previously, therefore, a lower bound is developed for evaluating the performance of the proposed heuristics. Several test problems have been solved using these heuristics and results compared. To further enhance the solution quality, a three dimensional genetic algorithm (3DGA) is also developed. Several test problems have been solved using 3DGA and the results indicate its superiority to the other heuristics.

Suggested Citation

  • Amin-Naseri, Mohammad Reza & Beheshti-Nia, Mohammad Ali, 2009. "Hybrid flow shop scheduling with parallel batching," International Journal of Production Economics, Elsevier, vol. 117(1), pages 185-196, January.
  • Handle: RePEc:eee:proeco:v:117:y:2009:i:1:p:185-196
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00354-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Valerie Botta-Genoulaz, 2000. "Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness," Post-Print hal-00398647, HAL.
    2. Li, Wenhua & Yuan, Jinjiang, 2006. "Single machine parallel batch scheduling problem with release dates and three hierarchical criteria to minimize makespan, machine occupation time and stocking cost," International Journal of Production Economics, Elsevier, vol. 102(1), pages 143-148, July.
    3. Clyde L. Monma & Chris N. Potts, 1989. "On the Complexity of Scheduling with Batch Setup Times," Operations Research, INFORMS, vol. 37(5), pages 798-804, October.
    4. Thornton, Henry W. & Hunsucker, John L., 2004. "A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage," European Journal of Operational Research, Elsevier, vol. 152(1), pages 96-114, January.
    5. Kurz, Mary E. & Askin, Ronald G., 2003. "Comparing scheduling rules for flexible flow lines," International Journal of Production Economics, Elsevier, vol. 85(3), pages 371-388, September.
    6. Kyparisis, George J. & Koulamas, Christos, 2006. "Flexible flow shop scheduling with uniform parallel machines," European Journal of Operational Research, Elsevier, vol. 168(3), pages 985-997, February.
    7. Janiak, Adam & Kozan, Erhan & Lichtenstein, Maciej & Oguz, Ceyda, 2007. "Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion," International Journal of Production Economics, Elsevier, vol. 105(2), pages 407-424, February.
    8. Lin, Hung-Tso & Liao, Ching-Jong, 2003. "A case study in a two-stage hybrid flow shop with setup time and dedicated machines," International Journal of Production Economics, Elsevier, vol. 86(2), pages 133-143, November.
    9. Nong, Qingqin & Yuan, Jinjiang & Fu, Ruyan & Lin, Lin & Tian, Ji, 2008. "The single-machine parallel-batching on-line scheduling problem with family jobs to minimize makespan," International Journal of Production Economics, Elsevier, vol. 111(2), pages 435-440, February.
    10. Quadt, Daniel & Kuhn, Heinrich, 2007. "Batch scheduling of jobs with identical process times on flexible flow lines," International Journal of Production Economics, Elsevier, vol. 105(2), pages 385-401, February.
    11. Logendran, Rasaratnam & deSzoeke, Paula & Barnard, Faith, 2006. "Sequence-dependent group scheduling problems in flexible flow shops," International Journal of Production Economics, Elsevier, vol. 102(1), pages 66-86, July.
    12. Logendran, Rasaratnam & Carson, Sara & Hanson, Erik, 2005. "Group scheduling in flexible flow shops," International Journal of Production Economics, Elsevier, vol. 96(2), pages 143-155, May.
    13. Kurz, Mary E. & Askin, Ronald G., 2004. "Scheduling flexible flow lines with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 159(1), pages 66-82, November.
    14. Clyde L. Monma & Chris N. Potts, 1993. "Analysis of Heuristics for Preemptive Parallel Machine Scheduling with Batch Setup Times," Operations Research, INFORMS, vol. 41(5), pages 981-993, October.
    15. Oguz, Ceyda & Zinder, Yakov & Ha Do, Van & Janiak, Adam & Lichtenstein, Maciej, 2004. "Hybrid flow-shop scheduling problems with multiprocessor task systems," European Journal of Operational Research, Elsevier, vol. 152(1), pages 115-131, January.
    16. Botta-Genoulaz, Valerie, 2000. "Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 101-111, March.
    17. Bertel, S. & Billaut, J. -C., 2004. "A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation," European Journal of Operational Research, Elsevier, vol. 159(3), pages 651-662, December.
    18. Vo[ss], Stefan & Witt, Andreas, 2007. "Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application," International Journal of Production Economics, Elsevier, vol. 105(2), pages 445-458, February.
    19. Nawaz, Muhammad & Enscore Jr, E Emory & Ham, Inyong, 1983. "A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem," Omega, Elsevier, vol. 11(1), pages 91-95.
    20. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    21. Scott Webster & Kenneth R. Baker, 1995. "Scheduling Groups of Jobs on a Single Machine," Operations Research, INFORMS, vol. 43(4), pages 692-703, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
    2. Yi Tan & Lars Mönch & John W. Fowler, 2018. "A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines," Journal of Scheduling, Springer, vol. 21(2), pages 209-226, April.
    3. Christoph Hertrich & Christian Weiß & Heiner Ackermann & Sandy Heydrich & Sven O. Krumke, 2022. "Online algorithms to schedule a proportionate flexible flow shop of batching machines," Journal of Scheduling, Springer, vol. 25(6), pages 643-657, December.
    4. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    5. A. G. Leeftink & R. J. Boucherie & E. W. Hans & M. A. M. Verdaasdonk & I. M. H. Vliegen & P. J. Diest, 2018. "Batch scheduling in the histopathology laboratory," Flexible Services and Manufacturing Journal, Springer, vol. 30(1), pages 171-197, June.
    6. Ming Liu & Xuenan Yang & Jiantong Zhang & Chengbin Chu, 2017. "Scheduling a tempered glass manufacturing system: a three-stage hybrid flow shop model," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 6084-6107, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.
    2. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    3. Chen, Yin-Yann & Cheng, Chen-Yang & Wang, Li-Chih & Chen, Tzu-Li, 2013. "A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—A case study for solar cell industry," International Journal of Production Economics, Elsevier, vol. 141(1), pages 66-78.
    4. Luo, Hao & Du, Bing & Huang, George Q. & Chen, Huaping & Li, Xiaolin, 2013. "Hybrid flow shop scheduling considering machine electricity consumption cost," International Journal of Production Economics, Elsevier, vol. 146(2), pages 423-439.
    5. Carlos Paternina-Arboleda & Jairo Montoya-Torres & Milton Acero-Dominguez & Maria Herrera-Hernandez, 2008. "Scheduling jobs on a k-stage flexible flow-shop," Annals of Operations Research, Springer, vol. 164(1), pages 29-40, November.
    6. Liji Shen & Jatinder N. D. Gupta, 2018. "Family scheduling with batch availability in flow shops to minimize makespan," Journal of Scheduling, Springer, vol. 21(2), pages 235-249, April.
    7. Quadt, Daniel & Kuhn, Heinrich, 2007. "A taxonomy of flexible flow line scheduling procedures," European Journal of Operational Research, Elsevier, vol. 178(3), pages 686-698, May.
    8. Wang, Xiuli & Cheng, T.C.E., 2009. "Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers," International Journal of Production Economics, Elsevier, vol. 119(1), pages 199-206, May.
    9. Bozorgirad, Mir Abbas & Logendran, Rasaratnam, 2013. "Bi-criteria group scheduling in hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 145(2), pages 599-612.
    10. Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
    11. Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
    12. Pan, Quan-Ke & Gao, Liang & Li, Xin-Yu & Gao, Kai-Zhou, 2017. "Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times," Applied Mathematics and Computation, Elsevier, vol. 303(C), pages 89-112.
    13. Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.
    14. Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013. "Family sequencing and cooperation," European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
    15. Schaller, Jeffrey, 2007. "Scheduling on a single machine with family setups to minimize total tardiness," International Journal of Production Economics, Elsevier, vol. 105(2), pages 329-344, February.
    16. Quadt, Daniel & Kuhn, Heinrich, 2007. "Batch scheduling of jobs with identical process times on flexible flow lines," International Journal of Production Economics, Elsevier, vol. 105(2), pages 385-401, February.
    17. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    18. Madiha Harrabi & Olfa Belkahla Driss & Khaled Ghedira, 2021. "A hybrid evolutionary approach to job-shop scheduling with generic time lags," Journal of Scheduling, Springer, vol. 24(3), pages 329-346, June.
    19. Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
    20. Paul Schikora & Andrew Manikas & Michael Godfrey, 2015. "Determining Optimal Flow-Time Schedules For The Multiple-Product Batch-Flow Problem," International Journal of Management and Marketing Research, The Institute for Business and Finance Research, vol. 8(2), pages 19-35.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:117:y:2009:i:1:p:185-196. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.