IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i7p1992-2012.html
   My bibliography  Save this article

Revisiting rescheduling: MRP nervousness and the bullwhip effect

Author

Listed:
  • Qinyun Li
  • Stephen M. Disney

Abstract

We study the material requirements planning (MRP) system nervousness problem from a dynamic, stochastic and economic perspective in a two-echelon supply chain under first-order auto-regressive demand. MRP nervousness is an effect where the future order forecasts, given to suppliers so that they may plan production and organise their affairs, exhibits extreme period-to-period variability. We develop a measure of nervousness that weights future forecast errors geometrically over time. Near-term forecast errors are weighted higher than distant forecast errors. Focusing on replenishment policies for high volume items, we investigate two methods of generating order call-offs and two methods of creating order forecasts. For order call-offs, we consider the traditional order-up-to (OUT) policy and the proportional OUT policy (POUT). For order forecasts, we study both minimum mean square error (MMSE) forecasts of the demand process and MMSE forecasts coupled with a procedure that accounts for the known future influence of the POUT policy. We show that when retailers use the POUT policy and account for its predictable future behaviour, they can reduce the bullwhip effect, supply chain inventory costs and the manufacturer’s MRP nervousness.

Suggested Citation

  • Qinyun Li & Stephen M. Disney, 2017. "Revisiting rescheduling: MRP nervousness and the bullwhip effect," International Journal of Production Research, Taylor & Francis Journals, vol. 55(7), pages 1992-2012, April.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:7:p:1992-2012
    DOI: 10.1080/00207543.2016.1261196
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2016.1261196
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2016.1261196?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hau L. Lee & Kut C. So & Christopher S. Tang, 2000. "The Value of Information Sharing in a Two-Level Supply Chain," Management Science, INFORMS, vol. 46(5), pages 626-643, May.
    2. Ton de Kok & Fred Janssen & Jan van Doremalen & Erik van Wachem & Mathieu Clerkx & Winfried Peeters, 2005. "Philips Electronics Synchronizes Its Supply Chain to End the Bullwhip Effect," Interfaces, INFORMS, vol. 35(1), pages 37-48, February.
    3. Hau L. Lee, Seungjin Whang, 2000. "Information sharing in a supply chain," International Journal of Manufacturing Technology and Management, Inderscience Enterprises Ltd, vol. 1(1), pages 79-93.
    4. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
    5. Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
    6. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    7. Disney, S. M. & Towill, D. R. & van de Velde, W., 2004. "Variance amplification and the golden ratio in production and inventory control," International Journal of Production Economics, Elsevier, vol. 90(3), pages 295-309, August.
    8. Julian Englberger & Frank Herrmann & Michael Manitz, 2016. "Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6192-6215, October.
    9. Robert L. Bray & Haim Mendelson, 2015. "Production Smoothing and the Bullwhip Effect," Manufacturing & Service Operations Management, INFORMS, vol. 17(2), pages 208-220, May.
    10. Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
    11. Hosoda, Takamichi & Disney, Stephen M., 2012. "On the replenishment policy when the market demand information is lagged," International Journal of Production Economics, Elsevier, vol. 135(1), pages 458-467.
    12. Robert C. Carlson & James V. Jucker & Dean H. Kropp, 1979. "Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach," Management Science, INFORMS, vol. 25(8), pages 754-761, August.
    13. Disney, S. M. & Towill, D. R., 2003. "On the bullwhip and inventory variance produced by an ordering policy," Omega, Elsevier, vol. 31(3), pages 157-167, June.
    14. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
    15. Li Chen & Hau L. Lee, 2009. "Information Sharing and Order Variability Control Under a Generalized Demand Model," Management Science, INFORMS, vol. 55(5), pages 781-797, May.
    16. Robert H. Hayes & Kim B. Clark, 1985. "Explaining Observed Productivity Differentials Between Plants: Implications for Operations Research," Interfaces, INFORMS, vol. 15(6), pages 3-14, December.
    17. Wang, Xun & Disney, Stephen M., 2016. "The bullwhip effect: Progress, trends and directions," European Journal of Operational Research, Elsevier, vol. 250(3), pages 691-701.
    18. Christian Terwiesch & Z. Justin Ren & Teck H. Ho & Morris A. Cohen, 2005. "An Empirical Analysis of Forecast Sharing in the Semiconductor Equipment Supply Chain," Management Science, INFORMS, vol. 51(2), pages 208-220, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Klaus Altendorfer & Wolfgang Seiringer & Thomas Felberbauer & Balwin Bokor & Fabian Brockmann, 2024. "How Periodic Forecast Updates Influence MRP Planning Parameters: A Simulation Study," Papers 2403.11010, arXiv.org.
    2. Van Belle, Jente & Crevits, Ruben & Verbeke, Wouter, 2023. "Improving forecast stability using deep learning," International Journal of Forecasting, Elsevier, vol. 39(3), pages 1333-1350.
    3. Ghazi M. Magableh & Mahmoud Z. Mistarihi, 2023. "Global Supply Chain Nervousness (GSCN)," Sustainability, MDPI, vol. 15(16), pages 1-24, August.
    4. Dominguez, Roberto & Cannella, Salvatore & Barbosa-Póvoa, Ana P. & Framinan, Jose M., 2018. "OVAP: A strategy to implement partial information sharing among supply chain retailers," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 110(C), pages 122-136.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Carlos Herrera & Sana Belmokhtar-Berraf & André Thomas & Víctor Parada, 2016. "A reactive decision-making approach to reduce instability in a master production schedule," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2394-2404, April.
    2. QU, Zhan & RAFF, Horst, 2023. "Two-part tariffs, inventory stockpiling, and the bullwhip effect," European Journal of Operational Research, Elsevier, vol. 308(1), pages 201-214.
    3. Wang, Xun & Disney, Stephen M., 2016. "The bullwhip effect: Progress, trends and directions," European Journal of Operational Research, Elsevier, vol. 250(3), pages 691-701.
    4. Pastore, Erica & Alfieri, Arianna & Zotteri, Giulio & Boylan, John E., 2020. "The impact of demand parameter uncertainty on the bullwhip effect," European Journal of Operational Research, Elsevier, vol. 283(1), pages 94-107.
    5. Nagaraja, Chaitra H. & McElroy, Tucker, 2018. "The multivariate bullwhip effect," European Journal of Operational Research, Elsevier, vol. 267(1), pages 96-106.
    6. Pastore, Erica & Alfieri, Arianna & Zotteri, Giulio, 2019. "An empirical investigation on the antecedents of the bullwhip effect: Evidence from the spare parts industry," International Journal of Production Economics, Elsevier, vol. 209(C), pages 121-133.
    7. Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
    8. Dominguez, Roberto & Cannella, Salvatore & Barbosa-Póvoa, Ana P. & Framinan, Jose M., 2018. "Information sharing in supply chains with heterogeneous retailers," Omega, Elsevier, vol. 79(C), pages 116-132.
    9. Enrique Holgado de Frutos & Juan R Trapero & Francisco Ramos, 2020. "A literature review on operational decisions applied to collaborative supply chains," PLOS ONE, Public Library of Science, vol. 15(3), pages 1-28, March.
    10. Gaalman, Gerard & Disney, Stephen M. & Wang, Xun, 2022. "When bullwhip increases in the lead time: An eigenvalue analysis of ARMA demand," International Journal of Production Economics, Elsevier, vol. 250(C).
    11. Ojha, Divesh & Sahin, Funda & Shockley, Jeff & Sridharan, Sri V., 2019. "Is there a performance tradeoff in managing order fulfillment and the bullwhip effect in supply chains? The role of information sharing and information type," International Journal of Production Economics, Elsevier, vol. 208(C), pages 529-543.
    12. Ma, Yungao & Wang, Nengmin & He, Zhengwen & Lu, Jizhou & Liang, Huigang, 2015. "Analysis of the bullwhip effect in two parallel supply chains with interacting price-sensitive demands," European Journal of Operational Research, Elsevier, vol. 243(3), pages 815-825.
    13. Li Chen & Hau L. Lee, 2012. "Bullwhip Effect Measurement and Its Implications," Operations Research, INFORMS, vol. 60(4), pages 771-784, August.
    14. Lin Wang & Zhiqiang Lu & Yifei Ren, 2019. "A rolling horizon approach for production planning and condition-based maintenance under uncertain demand," Journal of Risk and Reliability, , vol. 233(6), pages 1014-1028, December.
    15. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    16. Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
    17. Hosoda, Takamichi & Disney, Stephen M., 2018. "A unified theory of the dynamics of closed-loop supply chains," European Journal of Operational Research, Elsevier, vol. 269(1), pages 313-326.
    18. Sodhi, ManMohan S. & Tang, Christopher S., 2011. "The incremental bullwhip effect of operational deviations in an arborescent supply chain with requirements planning," European Journal of Operational Research, Elsevier, vol. 215(2), pages 374-382, December.
    19. Ponte, Borja & Puche, Julio & Rosillo, Rafael & de la Fuente, David, 2020. "The effects of quantity discounts on supply chain performance: Looking through the Bullwhip lens," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 143(C).
    20. Wang, Xun & Disney, Stephen M. & Ponte, Borja, 2023. "On the stationary stochastic response of an order-constrained inventory system," European Journal of Operational Research, Elsevier, vol. 304(2), pages 543-557.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:7:p:1992-2012. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.