IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v95y2005i1p95-107.html
   My bibliography  Save this article

The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study

Author

Listed:
  • Meixell, Mary J.

Abstract

No abstract is available for this item.

Suggested Citation

  • Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
  • Handle: RePEc:eee:proeco:v:95:y:2005:i:1:p:95-107
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00376-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Tang, Ou & Grubbstrom, Robert W., 2002. "Planning and replanning the master production schedule under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 78(3), pages 323-334, August.
    2. Stadtler, Hartmut & Kilger, C., 2000. "Supply chain management and advanced planning: concepts, models, software and case studies," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 4691, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    3. Grubbstrom, Robert W. & Tang, Ou, 2000. "Modelling rescheduling activities in a multi-period production-inventory system," International Journal of Production Economics, Elsevier, vol. 68(2), pages 123-135, November.
    4. V. Sridharan & William L. Berry & V. Udayabhanu, 1987. "Freezing the Master Production Schedule Under Rolling Planning Horizons," Management Science, INFORMS, vol. 33(9), pages 1137-1149, September.
    5. Heisig, Gerald, 2001. "Comparison of (s,S) and (s,nQ) inventory control rules with respect to planning stability," International Journal of Production Economics, Elsevier, vol. 73(1), pages 59-82, August.
    6. repec:dau:papers:123456789/2057 is not listed on IDEAS
    7. repec:dau:papers:123456789/2775 is not listed on IDEAS
    8. Jeunet, Jully & Jonard, Nicolas, 2000. "Measuring the performance of lot-sizing techniques in uncertain environments," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 197-208, March.
    9. Horst Tempelmeier & Matthias Derstroff, 1996. "A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times," Management Science, INFORMS, vol. 42(5), pages 738-757, May.
    10. van Donselaar, K. & van den Nieuwenhof, J. & Visschers, J., 2000. "The impact of material coordination concepts on planning stability in supply chains," International Journal of Production Economics, Elsevier, vol. 68(2), pages 169-176, November.
    11. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
    12. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
    13. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
    14. Stadtler, Hartmut, 2000. "Improved rolling schedules for the dynamic single level lot sizing problem," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 14079, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    15. Dellaert, Nico & Jeunet, Jully, 2003. "Controlling multi-level production in a rolling-schedule environment," International Journal of Production Economics, Elsevier, vol. 85(1), pages 113-121, July.
    16. Johansen, Soren Glud, 1999. "Lot sizing for varying degrees of demand uncertainty," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 405-414, March.
    17. Dejonckheere, J. & Disney, S. M. & Lambrecht, M. R. & Towill, D. R., 2003. "Measuring and avoiding the bullwhip effect: A control theoretic approach," European Journal of Operational Research, Elsevier, vol. 147(3), pages 567-590, June.
    18. Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
    19. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
    20. Jensen, Thomas, 1993. "Measuring and improving planning stability of reorder-point lot-sizing policies," International Journal of Production Economics, Elsevier, vol. 30(1), pages 167-178, July.
    21. Hartmut Stadtler, 2000. "Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem," Management Science, INFORMS, vol. 46(2), pages 318-326, February.
    22. Kelle, Peter & Milne, Alistair, 1999. "The effect of (s, S) ordering policy on the supply chain," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 113-122, March.
    23. Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hill, Alex & Doran, Des & Stratton, Roy, 2012. "How should you stabilise your supply chains?," International Journal of Production Economics, Elsevier, vol. 135(2), pages 870-881.
    2. Latifa Benhamou & Pierre Féniès & Vincent Giard, 2020. "Avantages Potentiels Du Reverse Blending Sur La Chaine Logistique De L'Industrie Des Engrais," Post-Print hal-03005688, HAL.
    3. Wong, Hartanto & Lesmono, Dharma & Chhajed, Dilip & Kim, Kilsun, 2019. "On the evaluation of commonality strategy in product line design: The effect of valuation change and distribution channel structure," Omega, Elsevier, vol. 83(C), pages 14-25.
    4. Lan, Chun-Hsiung, 2007. "The design of multiple production lines under deadline constraint," International Journal of Production Economics, Elsevier, vol. 106(1), pages 191-203, March.
    5. Carlos Herrera & Sana Belmokhtar-Berraf & André Thomas & Víctor Parada, 2016. "A reactive decision-making approach to reduce instability in a master production schedule," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2394-2404, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    2. Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
    3. Demirel, Edil & Özelkan, Ertunga C. & Lim, Churlzu, 2018. "Aggregate planning with Flexibility Requirements Profile," International Journal of Production Economics, Elsevier, vol. 202(C), pages 45-58.
    4. de Sampaio, Raimundo J.B. & Wollmann, Rafael R.G. & Vieira, Paula F.G., 2017. "A flexible production planning for rolling-horizons," International Journal of Production Economics, Elsevier, vol. 190(C), pages 31-36.
    5. G. Rius-Sorolla & J. Maheut & S. Estellés-Miguel & J. P. García-Sabater, 2021. "Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1289-1315, December.
    6. Carlos Herrera & Sana Belmokhtar-Berraf & André Thomas & Víctor Parada, 2016. "A reactive decision-making approach to reduce instability in a master production schedule," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2394-2404, April.
    7. Hartmut Stadtler & Malte Meistering, 2019. "Model formulations for the capacitated lot-sizing problem with service-level constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1025-1056, December.
    8. Merce, C. & Fontan, G., 2003. "MIP-based heuristics for capacitated lotsizing problems," International Journal of Production Economics, Elsevier, vol. 85(1), pages 97-111, July.
    9. Jeunet, Jully, 2006. "Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments," International Journal of Production Economics, Elsevier, vol. 103(1), pages 401-419, September.
    10. Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
    11. Schmid, Verena & Doerner, Karl F. & Laporte, Gilbert, 2013. "Rich routing problems arising in supply chain management," European Journal of Operational Research, Elsevier, vol. 224(3), pages 435-448.
    12. Christopher Suerie & Hartmut Stadtler, 2003. "The Capacitated Lot-Sizing Problem with Linked Lot Sizes," Management Science, INFORMS, vol. 49(8), pages 1039-1054, August.
    13. Miragliotta, Giovanni, 2006. "Layers and mechanisms: A new taxonomy for the Bullwhip Effect," International Journal of Production Economics, Elsevier, vol. 104(2), pages 365-381, December.
    14. Luong, Huynh Trung, 2007. "Measure of bullwhip effect in supply chains with autoregressive demand process," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1086-1097, August.
    15. repec:dau:papers:123456789/2078 is not listed on IDEAS
    16. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    17. Wang, Xun & Disney, Stephen M., 2016. "The bullwhip effect: Progress, trends and directions," European Journal of Operational Research, Elsevier, vol. 250(3), pages 691-701.
    18. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
    19. Junhai Ma & Xiaogang Ma, 2017. "Measure of the bullwhip effect considering the market competition between two retailers," International Journal of Production Research, Taylor & Francis Journals, vol. 55(2), pages 313-326, January.
    20. Li, Xiaoming, 2008. "Demand evolution in stochastic inventory systems: Riskiness increase," International Journal of Production Economics, Elsevier, vol. 116(2), pages 182-189, December.
    21. Dellaert, Nico & Jeunet, Jully, 2003. "Controlling multi-level production in a rolling-schedule environment," International Journal of Production Economics, Elsevier, vol. 85(1), pages 113-121, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:95:y:2005:i:1:p:95-107. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.