IDEAS home Printed from https://ideas.repec.org/a/spr/joptap/v160y2014i2d10.1007_s10957-013-0280-1.html
   My bibliography  Save this article

An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System

Author

Listed:
  • Wen-Tsung Ho

    (Takming University of Science and Technology)

  • Shu-Fang Lai

    (Takming University of Science and Technology)

  • Yun-Kuei Huang

    (Takming University of Science and Technology)

Abstract

This study addresses mixed batch shipment policy with common replenishment cycle for multiple items in a single-supplier multiple-retailer integrated system. The supplier produces multiple items on a single facility under a common replenishment cycle and delivers products to retailer utilizing a mixed batch shipment policy. The objective is to determine the optimal replenishment cycle, the number of shipments, and the structure of mixed shipment, all of which minimize the integrated total cost per unit time. The single-item isolation model is constructed first, and the single-item isolation model is then integrated into the single-item integration model. Moreover, the single-item integration model is integrated into the multi-item integration model. The minimum total cost model is transformed into a maximum replenishment cycle model to optimize the structure of the mixed batch shipment. The replenishment cycle division method is then developed to obtain the optimal solutions to the subject problem. Examples are presented to illustrate the procedures involved in the replenishment cycle division method.

Suggested Citation

  • Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
  • Handle: RePEc:spr:joptap:v:160:y:2014:i:2:d:10.1007_s10957-013-0280-1
    DOI: 10.1007/s10957-013-0280-1
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10957-013-0280-1
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10957-013-0280-1?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    2. Hoque, M. A. & Goyal, S. K., 2000. "An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment," International Journal of Production Economics, Elsevier, vol. 65(3), pages 305-315, May.
    3. Lu Lu & Marc E. Posner, 1994. "Approximation Procedures for the One-Warehouse Multi-Retailer System," Management Science, INFORMS, vol. 40(10), pages 1305-1316, October.
    4. Leroy B. Schwarz, 1973. "A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem," Management Science, INFORMS, vol. 19(5), pages 555-566, January.
    5. Banerjee, Avijit, 2009. "Simultaneous determination of multiproduct batch and full truckload shipment schedules," International Journal of Production Economics, Elsevier, vol. 118(1), pages 111-117, March.
    6. Robin Roundy, 1985. "98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems," Management Science, INFORMS, vol. 31(11), pages 1416-1430, November.
    7. Andrew Z. Szendrovits, 1975. "Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model," Management Science, INFORMS, vol. 22(3), pages 298-308, November.
    8. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
    9. Glock, C. H., 2011. "A multiple-vendor single-buyer integrated inventory model with a variable number of vendors," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57821, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    10. Joseph D. Blackburn & Robert A. Millen, 1982. "Improved Heuristics for Multi-Stage Requirements Planning Systems," Management Science, INFORMS, vol. 28(1), pages 44-56, January.
    11. Szendrovits, Andrew Z & Drezner, ZVI, 1980. "Optimizing multi-stage production with constant lot size and varying numbers of batches," Omega, Elsevier, vol. 8(6), pages 623-629.
    12. Glock, C. H., 2009. "A Comment: "Integrated single vendor single buyer model with stochastic demand and variable lead time"," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57828, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    13. S. K. Goyal, 1976. "Note--Note on "Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model"," Management Science, INFORMS, vol. 23(3), pages 332-333, November.
    14. Kim, Taebok & Hong, Yushin & Chang, Soo Young, 2006. "Joint economic procurement--production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system," International Journal of Production Economics, Elsevier, vol. 103(1), pages 199-208, September.
    15. Wee, H. M. & Yang, P. C., 2004. "The optimal and heuristic solutions of a distribution network," European Journal of Operational Research, Elsevier, vol. 158(3), pages 626-632, November.
    16. Goyal, S. K. & Szendrovits, A. Z., 1986. "A constant lot size model with equal and unequal sized batch shipments between production stages," Engineering Costs and Production Economics, Elsevier, vol. 10(3), pages 203-210, March.
    17. Glock, Christoph H., 2009. "A comment: "Integrated single vendor-single buyer model with stochastic demand and variable lead time"," International Journal of Production Economics, Elsevier, vol. 122(2), pages 790-792, December.
    18. Derek Atkins & Daning Sun, 1995. "98%-Effective Lot Sizing for Series Inventory Systems with Backlogging," Operations Research, INFORMS, vol. 43(2), pages 335-345, April.
    19. Taebok Kim & Suresh Kumar Goyal, 2009. "A consolidated delivery policy of multiple suppliers for a single buyer," International Journal of Procurement Management, Inderscience Enterprises Ltd, vol. 2(3), pages 267-287.
    20. Liu, Xingchu & Cetinkaya, Sila, 2007. "A note on "quality improvement and setup reduction in the joint economic lot size model"," European Journal of Operational Research, Elsevier, vol. 182(1), pages 194-204, October.
    21. Siajadi, Hans & Ibrahim, Raafat N. & Lochert, Paul B., 2006. "Joint economic lot size in distribution system with multiple shipment policy," International Journal of Production Economics, Elsevier, vol. 102(2), pages 302-316, August.
    22. Banerjee, Avijit & Burton, Jonathan S., 1994. "Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 215-222, June.
    23. Hsiao, Yu-Cheng & Lin, Yi & Huang, Yun-Kuei, 2010. "Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 408-413, April.
    24. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    25. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    26. Zhou, Yong-Wu & Wang, Sheng-Dong, 2007. "Optimal production and shipment models for a single-vendor-single-buyer integrated system," European Journal of Operational Research, Elsevier, vol. 180(1), pages 309-328, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    2. Hsiao, Yu-Cheng, 2008. "Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information," International Journal of Production Economics, Elsevier, vol. 115(1), pages 229-235, September.
    3. Wen-Tsung Ho & Yu-Cheng Hsiao, 2014. "Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System," Journal of Optimization Theory and Applications, Springer, vol. 161(2), pages 648-663, May.
    4. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    5. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    6. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    7. Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
    8. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    9. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    10. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
    11. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    12. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    13. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    14. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    15. Chu, Chi-Leung & Leon, V. Jorge, 2008. "Single-vendor multi-buyer inventory coordination under private information," European Journal of Operational Research, Elsevier, vol. 191(2), pages 485-503, December.
    16. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    17. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    18. Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
    19. Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.
    20. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joptap:v:160:y:2014:i:2:d:10.1007_s10957-013-0280-1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.