IDEAS home Printed from https://ideas.repec.org/a/spr/opsear/v58y2021i4d10.1007_s12597-021-00515-7.html
   My bibliography  Save this article

Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost

Author

Listed:
  • K. F. Mary Latha

    (Jayaraj Annapackiam College for Women (Autonomous))

  • M. Ganesh Kumar

    (Amrita College of Engineering and Technology)

  • R. Uthayakumar

    (The Gandhigram Rural Institute (Deemed to be University))

Abstract

This article presents a single-vendor and a single-buyer joint economic lot size (JELS) production-distribution inventory model with the prime aim on; the effect of the investment on ordering cost reduction, back order price discount and reduction on lead time. The produced items are delivered to the buyer by adopting a geometric shipment policy. Two continuous review models are developed by assuming that the lead time demand follows a normal distribution and distribution-free. Two types of investments are incorporated to reduce the ordering cost. They are (i) logarithmic investment function and (ii) power investment function. The minimax distribution free approach is adopted in the distribution-free model to find the optimal values of the decision variables by minimizing the expected annual total cost of the system. Numerical examples are given to validate the proposed models. Sensitivity analysis is also performed to analyze the behavior of the key parameters on lot size, ordering cost, backorder price discount, the number of shipments from the vendor to the buyer in one production run and the expected annual total cost of the proposed models.

Suggested Citation

  • K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
  • Handle: RePEc:spr:opsear:v:58:y:2021:i:4:d:10.1007_s12597-021-00515-7
    DOI: 10.1007/s12597-021-00515-7
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12597-021-00515-7
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12597-021-00515-7?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Glock, C. H., 2009. "A Comment: "Integrated single vendor single buyer model with stochastic demand and variable lead time"," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57828, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    2. Chang, Hung-Chi & Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2006. "Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction," European Journal of Operational Research, Elsevier, vol. 170(2), pages 481-495, April.
    3. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    4. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
    5. Glock, C. H. & Kim, T., 2012. "A joint economic lot sizemodel with returnable transport items," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 59079, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    6. Glock, Christoph H. & Grosse, Eric H. & Ries, Jörg M., 2014. "The lot sizing problem: A tertiary study," International Journal of Production Economics, Elsevier, vol. 155(C), pages 39-51.
    7. Glock, Christoph H., 2009. "A comment: "Integrated single vendor-single buyer model with stochastic demand and variable lead time"," International Journal of Production Economics, Elsevier, vol. 122(2), pages 790-792, December.
    8. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    9. Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
    10. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    11. L-Y Ouyang & C-K Chen & H-C Chang, 1999. "Lead time and ordering cost reductions in continuous review inventory systems with partial backorders," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(12), pages 1272-1279, December.
    12. Pan, Jason Chao-Hsien & Hsiao, Yu-Cheng, 2005. "Integrated inventory models with controllable lead time and backorder discount considerations," International Journal of Production Economics, Elsevier, vol. 93(1), pages 387-397, January.
    13. Pan, Jason Chao-Hsien & Lo, Ming-Cheng & Hsiao, Yu-Cheng, 2004. "Optimal reorder point inventory models with variable lead time and backorder discount considerations," European Journal of Operational Research, Elsevier, vol. 158(2), pages 488-505, October.
    14. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    15. B.C. Giri & A. Chakraborty & T. Maiti, 2017. "Consignment stock policy with unequal shipments and process unreliability for a two-level supply chain," International Journal of Production Research, Taylor & Francis Journals, vol. 55(9), pages 2489-2505, May.
    16. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    17. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
    18. Darwish, M.A., 2009. "Economic selection of process mean for single-vendor single-buyer supply chain," European Journal of Operational Research, Elsevier, vol. 199(1), pages 162-169, November.
    19. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    20. Goyal, Suresh K. & Nebebe, Fassil, 2000. "Determination of economic production-shipment policy for a single-vendor-single-buyer system," European Journal of Operational Research, Elsevier, vol. 121(1), pages 175-178, February.
    21. Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.
    22. Hoque, Mohammad A. & Goyal, Suresh K., 2006. "A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer," International Journal of Production Economics, Elsevier, vol. 102(2), pages 217-225, August.
    23. Woo, York Y. & Hsu, Shu-Lu & Wu, Soushan, 2001. "An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction," International Journal of Production Economics, Elsevier, vol. 73(3), pages 203-215, October.
    24. Hsu, Shu-Lu & Lee, Chun Chen, 2009. "Replenishment and lead time decisions in manufacturer-retailer chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 45(3), pages 398-408, May.
    25. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    26. Glock, C. H., 2012. "The joint economic lot size problem: a review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57811, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    27. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    28. Glock, C. H. & Grosse, E. H. & Ries, J. M., 2014. "The Lot Sizing Problem: A Tertiary Study," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 63361, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    29. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nidhi Handa & S. R. Singh & Neha Punetha, 2022. "Impact of carbon emission in two-echelon supply chain inventory decision with controllable deterioration and two-level trade-credit period," OPSEARCH, Springer;Operational Research Society of India, vol. 59(4), pages 1555-1586, December.
    2. R. Uthayakumar & B. Karthick, 2023. "Analysis of several reduction strategies on a two-echelon sustainable supply chain model with triangular fuzzy demand," OPSEARCH, Springer;Operational Research Society of India, vol. 60(1), pages 393-419, March.
    3. Dipak Barman & Gour Chandra Mahata, 2022. "Two-echelon production inventory model with imperfect quality items with ordering cost reduction depending on controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(5), pages 2656-2671, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    2. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    3. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    4. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    5. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    6. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
    7. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    8. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    9. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    10. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    11. Lucio Enrico Zavanella & Beatrice Marchi & Simone Zanoni & Ivan Ferretti, 2019. "Energy considerations for the economic production quantity and the joint economic lot sizing," Journal of Business Economics, Springer, vol. 89(7), pages 845-865, September.
    12. Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.
    13. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    14. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    15. Nima Kazemi & Salwa Hanim Abdul-Rashid & Ehsan Shekarian & Eleonora Bottani & Roberto Montanari, 2016. "A fuzzy lot-sizing problem with two-stage composite human learning," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 5010-5025, August.
    16. Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
    17. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    18. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    19. Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers," International Journal of Production Economics, Elsevier, vol. 245(C).
    20. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:58:y:2021:i:4:d:10.1007_s12597-021-00515-7. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.