IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v155y2014icp351-360.html
   My bibliography  Save this article

Lot sizing and lead time decisions in production/inventory systems

Author

Listed:
  • Noblesse, Ann M.
  • Boute, Robert N.
  • Lambrecht, Marc R.
  • Van Houdt, Benny

Abstract

Traditionally, lot sizing decisions in inventory management trade-off the cost of placing orders against the cost of holding inventory. However, when these lot sizes are to be produced in a finite capacity production/inventory system, the lot size has an important impact on the lead times, which in turn determine inventory levels (and costs). In this paper we study the lot sizing decision in a production/inventory setting, where lead times are determined by a queueing model that is linked endogenously to the orders placed by the inventory model. Assuming a continuous review (s, S) inventory policy, we develop a procedure to obtain the distribution of lead times and the distribution of inventory levels, when lead times are endogenously determined by the inventory model. This procedure allows to determine the optimal inventory parameters within the class of (s, S) policies that minimize the expected ordering and inventory related costs over time. We numerically show that ignoring the endogeneity of lead times may lead to inappropriate lot sizing decisions and significantly higher costs. This cost discrepancy is very outspoken if the lot size based on the economic order quantity deviates significantly from desirable production lot sizes. In these cases, the endogenous treatment of lead times is of particular importance.

Suggested Citation

  • Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
  • Handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:351-360
    DOI: 10.1016/j.ijpe.2014.04.027
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527314001534
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2014.04.027?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Z. Jemai & F. Karaesmen, 2005. "The influence of demand variability on the performance of a make-to-stock queue," Post-Print hal-00126137, HAL.
    2. Boute, Robert N. & Disney, Stephen M. & Lambrecht, Marc R. & Van Houdt, Benny, 2007. "An integrated production and inventory model to dampen upstream demand variability in the supply chain," European Journal of Operational Research, Elsevier, vol. 178(1), pages 121-142, April.
    3. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    4. Hoque, M.A., 2013. "A vendor–buyer integrated production–inventory model with normal distribution of lead time," International Journal of Production Economics, Elsevier, vol. 144(2), pages 409-417.
    5. Cakanyildirim, Metin & Bookbinder, James H. & Gerchak, Yigal, 2000. "Continuous review inventory models where random lead time depends on lot size and reserved capacity," International Journal of Production Economics, Elsevier, vol. 68(3), pages 217-228, December.
    6. Saif Benjaafar & William L. Cooper & Joon-Seok Kim, 2005. "On the Benefits of Pooling in Production-Inventory Systems," Management Science, INFORMS, vol. 51(4), pages 548-565, April.
    7. Jemai, Zied & Karaesmen, Fikri, 2005. "The influence of demand variability on the performance of a make-to-stock queue," European Journal of Operational Research, Elsevier, vol. 164(1), pages 195-205, July.
    8. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
    9. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    10. Alp Muharremoglu & John N. Tsitsiklis, 2008. "A Single-Unit Decomposition Approach to Multiechelon Inventory Systems," Operations Research, INFORMS, vol. 56(5), pages 1089-1103, October.
    11. Saif Benjaafar & Joon-Seok Kim & N. Vishwanadham, 2004. "On the Effect of Product Variety in Production–Inventory Systems," Annals of Operations Research, Springer, vol. 126(1), pages 71-101, February.
    12. Glock, C. H., 2012. "The joint economic lot size problem: a review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57811, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    13. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    14. Evan L. Porteus, 1971. "On the Optimality of Generalized (s, S) Policies," Management Science, INFORMS, vol. 17(7), pages 411-426, March.
    15. Donald L. Iglehart, 1963. "Optimality of (s, S) Policies in the Infinite Horizon Dynamic Inventory Problem," Management Science, INFORMS, vol. 9(2), pages 259-267, January.
    16. Glock, C. H. & Kim, T., 2012. "A joint economic lot sizemodel with returnable transport items," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 59079, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    17. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    18. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    19. Andrew Caplin & John Leahy, 2010. "Economic Theory and the World of Practice: A Celebration of the ( S , s ) Model," Journal of Economic Perspectives, American Economic Association, vol. 24(1), pages 183-202, Winter.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chen, Tzu-Li & Cheng, Chen-Yang & Chen, Yin-Yann & Chan, Li-Kai, 2015. "An efficient hybrid algorithm for integrated order batching, sequencing and routing problem," International Journal of Production Economics, Elsevier, vol. 159(C), pages 158-167.
    2. Daniela Favaretto & Alessandro Marin & Marco Tolotti, 2021. "A data-driven and risk-based prudential approach to validate the DDMRP planning and control system," Working Papers 09, Department of Management, Università Ca' Foscari Venezia.
    3. Gharaei, Abolfazl & Almehdawe, Eman, 2020. "Economic growing quantity," International Journal of Production Economics, Elsevier, vol. 223(C).
    4. Qiu, Ruozhen & Sun, Minghe & Lim, Yun Fong, 2017. "Optimizing (s, S) policies for multi-period inventory models with demand distribution uncertainty: Robust dynamic programing approaches," European Journal of Operational Research, Elsevier, vol. 261(3), pages 880-892.
    5. Jalali, Hamed & Carmen, Raïsa & Van Nieuwenhuyse, Inneke & Boute, Robert, 2019. "Quality and pricing decisions in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 272(1), pages 195-206.
    6. Hernan Caceres & Dongchen Yu & Alexander Nikolaev, 2018. "Evaluating shortfall distributions in periodic inventory systems with stochastic endogenous demands and lead-times," Annals of Operations Research, Springer, vol. 271(2), pages 405-427, December.
    7. Heydari, Jafar & Mahmoodi, Mansour & Taleizadeh, Ata Allah, 2016. "Lead time aggregation: A three-echelon supply chain model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 89(C), pages 215-233.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    2. Abdelsalam, Hisham M. & Elassal, Magy M., 2014. "Joint economic lot sizing problem for a three—Layer supply chain with stochastic demand," International Journal of Production Economics, Elsevier, vol. 155(C), pages 272-283.
    3. Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.
    4. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    5. Castellano, Davide & Gallo, Mosè & Grassi, Andrea & Santillo, Liberatina C., 2019. "The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain," International Journal of Production Economics, Elsevier, vol. 218(C), pages 30-42.
    6. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    7. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    8. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    9. Nima Kazemi & Salwa Hanim Abdul-Rashid & Ehsan Shekarian & Eleonora Bottani & Roberto Montanari, 2016. "A fuzzy lot-sizing problem with two-stage composite human learning," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 5010-5025, August.
    10. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    11. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    12. Robert N. Boute & Marc R. Lambrecht & Benny Van Houdt, 2007. "Performance evaluation of a production/inventory system with periodic review and endogenous lead times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(4), pages 462-473, June.
    13. S. M. Shahidul Islam & Mohammad Abdul Hoque, 2017. "A joint economic lot size model for a supplier-manufacturer-retailers supply chain of an agricultural product," OPSEARCH, Springer;Operational Research Society of India, vol. 54(4), pages 868-885, December.
    14. M. A. Hoque, 2021. "An optimal solution policy to an integrated manufacturer-retailers problem with normal distribution of lead times of delivering equal and unequal-sized batches," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 483-512, June.
    15. Herbon, Avi & David, Israel, 2023. "Optimal manufacturer's cost sharing ratio, shipping policy and production rate – A two-echelon supply chain," Operations Research Perspectives, Elsevier, vol. 10(C).
    16. Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
    17. Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
    18. Rabin Kumar Mallick & Kartik Patra & Shyamal Kumar Mondal, 2020. "Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments," Annals of Operations Research, Springer, vol. 292(1), pages 341-369, September.
    19. Jonas C.P. Yu & Kung-Jeng Wang & Yu-Siang Lin, 2016. "Managing dual warehouses with an incentive policy for deteriorating items," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 586-602, February.
    20. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:351-360. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.