IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v136y2012i1p37-44.html
   My bibliography  Save this article

Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand

Author

Listed:
  • Glock, Christoph H.

Abstract

This paper studies alternative methods for reducing lead time and their impact on the safety stock and the expected total costs of a (Q,s) continuous review inventory control system. We focus on a single-vendor–single-buyer integrated inventory model with stochastic demand and variable, lot size-dependent lead time and assume that lead time consists of production and setup and transportation time. As a consequence, lead time may be reduced by crashing setup and transportation time, by increasing the production rate, or by reducing the lot size. We illustrate the benefits of reducing lead time in numerical examples and show that lead time reduction is especially beneficial in case of high demand uncertainty. Further, our studies indicate that a mixture of setup time and production time reduction is appropriate to lower expected total costs.

Suggested Citation

  • Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
  • Handle: RePEc:eee:proeco:v:136:y:2012:i:1:p:37-44
    DOI: 10.1016/j.ijpe.2011.09.007
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527311003938
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2011.09.007?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Glock, C. H., 2009. "A Comment: "Integrated single vendor single buyer model with stochastic demand and variable lead time"," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57828, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    2. Chang, Hung-Chi & Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2006. "Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction," European Journal of Operational Research, Elsevier, vol. 170(2), pages 481-495, April.
    3. Glock, C. H., 2010. "Batch sizing with controllable production rates," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57823, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    4. Chandra, Charu & Grabis, Janis, 2008. "Inventory management with variable lead-time dependent procurement cost," Omega, Elsevier, vol. 36(5), pages 877-887, October.
    5. Glock, Christoph H., 2009. "A comment: "Integrated single vendor-single buyer model with stochastic demand and variable lead time"," International Journal of Production Economics, Elsevier, vol. 122(2), pages 790-792, December.
    6. Maiti, Manas Kumar & Maiti, Manoranjan, 2007. "Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm," European Journal of Operational Research, Elsevier, vol. 179(2), pages 352-371, June.
    7. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    8. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    9. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    10. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    11. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
    12. Hoque, Mohammad A. & Goyal, Suresh K., 2006. "A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer," International Journal of Production Economics, Elsevier, vol. 102(2), pages 217-225, August.
    13. Jason Chao-Hsien Pan & Ming-Cheng Lo, 2008. "The Learning Effect On Setup Cost Reduction For Mixture Inventory Models With Variable Lead Time," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 25(04), pages 513-529.
    14. Kaijie Zhu & Rachel Q. Zhang & Fugee Tsung, 2007. "Pushing Quality Improvement Along Supply Chains," Management Science, INFORMS, vol. 53(3), pages 421-436, March.
    15. Hsiao, Yu-Cheng, 2008. "A note on integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 114(1), pages 294-297, July.
    16. Glock, C. H., 2011. "Batch sizing with controllable production rates in a multi-stage production system," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57822, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    2. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    3. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    4. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    5. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    6. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    7. Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.
    8. Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
    9. M. A. Hoque, 2021. "An optimal solution policy to an integrated manufacturer-retailers problem with normal distribution of lead times of delivering equal and unequal-sized batches," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 483-512, June.
    10. Asif Iqbal Malik & Byung Soo Kim, 2020. "A Constrained Production System Involving Production Flexibility and Carbon Emissions," Mathematics, MDPI, vol. 8(2), pages 1-21, February.
    11. Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
    12. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    13. Sumon Sarkar & Bibhas C. Giri, 2022. "Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment," Operational Research, Springer, vol. 22(2), pages 917-946, April.
    14. Mitali Sarkar & Li Pan & Bikash Koli Dey & Biswajit Sarkar, 2020. "Does the Autonomation Policy Really Help in a Smart Production System for Controlling Defective Production?," Mathematics, MDPI, vol. 8(7), pages 1-21, July.
    15. Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
    16. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    17. Haider Ali & Reshma Nasreen & Neetu Arneja & Chandra K. Jaggi, 2023. "Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 241-266, February.
    18. Lucio Enrico Zavanella & Beatrice Marchi & Simone Zanoni & Ivan Ferretti, 2019. "Energy considerations for the economic production quantity and the joint economic lot sizing," Journal of Business Economics, Springer, vol. 89(7), pages 845-865, September.
    19. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
    20. M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:136:y:2012:i:1:p:37-44. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.