IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v191y2017icp335-350.html
   My bibliography  Save this article

A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate

Author

Listed:
  • AlDurgam, Mohammad
  • Adegbola, Kehinde
  • Glock, Christoph H.

Abstract

This paper investigates an alternative way to react to demand uncertainty in an integrated inventory model, namely the variation of the production rate that enables the manufacturer to reduce lead times and the corresponding demand uncertainty. To investigate the impact of variable production rates on the supply chain, this paper considers a single-vendor single-manufacturer integrated inventory model where the vendor ships finished products in multiples of full truckloads to the manufacturer. The objective of the model is to coordinate both production and distribution of the product in such a way that the total costs of the supply chain are minimized. A solution procedure is suggested, and the behaviour of the model is analysed in numerical examples. Obviously, the total supply chain cost is reduced when the manufacturer's production rate is included as a decision variable in the model. These savings can generally benefit both the vendor and the manufacturer. However, in situations where coordinated decision making is initially not beneficial to the vendor, the supply chain members can benefit from a revenue sharing contract that supports the sharing of the total savings. The model proposed in the paper at hand supports both the determination of an optimal production rate as well as the distribution of coordination benefits among the supply chain members.

Suggested Citation

  • AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
  • Handle: RePEc:eee:proeco:v:191:y:2017:i:c:p:335-350
    DOI: 10.1016/j.ijpe.2017.05.017
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527317301664
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2017.05.017?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Panda, S. & Modak, N.M. & Basu, M. & Goyal, S.K., 2015. "Channel coordination and profit distribution in a social responsible three-layer supply chain," International Journal of Production Economics, Elsevier, vol. 168(C), pages 224-233.
    2. Glock, C. H., 2009. "A Comment: "Integrated single vendor single buyer model with stochastic demand and variable lead time"," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57828, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    3. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    4. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    5. Hoque, M. A. & Goyal, S. K., 2000. "An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment," International Journal of Production Economics, Elsevier, vol. 65(3), pages 305-315, May.
    6. Glock, C. H., 2010. "Batch sizing with controllable production rates," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57823, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    7. Glock, C. H. & Kim, T., 2012. "A joint economic lot sizemodel with returnable transport items," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 59079, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. Kelle, Peter & Akbulut, Asli, 2005. "The role of ERP tools in supply chain information sharing, cooperation, and cost optimization," International Journal of Production Economics, Elsevier, vol. 93(1), pages 41-52, January.
    9. Hou, Jing & Zeng, Amy Z. & Zhao, Lindu, 2010. "Coordination with a backup supplier through buy-back contract under supply disruption," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 46(6), pages 881-895, November.
    10. Glock, Christoph H., 2009. "A comment: "Integrated single vendor-single buyer model with stochastic demand and variable lead time"," International Journal of Production Economics, Elsevier, vol. 122(2), pages 790-792, December.
    11. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    12. Linh, Cao To & Hong, Yushin, 2009. "Channel coordination through a revenue sharing contract in a two-period newsboy problem," European Journal of Operational Research, Elsevier, vol. 198(3), pages 822-829, November.
    13. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    14. Lode Li, 2002. "Information Sharing in a Supply Chain with Horizontal Competition," Management Science, INFORMS, vol. 48(9), pages 1196-1212, September.
    15. Eiamkanchanalai, Somkiat & Banerjee, Avijit, 1999. "Production lot sizing with variable production rate and explicit idle capacity cost," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 251-259, March.
    16. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    17. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    18. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
    19. Darwish, M.A. & Abdulmalek, F. & Alkhedher, M., 2013. "Optimal selection of process mean for a stochastic inventory model," European Journal of Operational Research, Elsevier, vol. 226(3), pages 481-490.
    20. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    21. Wee, Hui Ming & Widyadana, Gede Agus, 2013. "Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales," International Journal of Production Economics, Elsevier, vol. 143(2), pages 574-579.
    22. Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
    23. Glock, C. H., 2012. "The joint economic lot size problem: a review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57811, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    24. Glock, C. H., 2011. "Batch sizing with controllable production rates in a multi-stage production system," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57822, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    25. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    26. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    27. Modak, Nikunja Mohan & Panda, Shibaji & Sana, Shib Sankar, 2016. "Three-echelon supply chain coordination considering duopolistic retailers with perfect quality products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 564-578.
    28. Arshinder & Kanda, Arun & Deshmukh, S.G., 2008. "Supply chain coordination: Perspectives, empirical studies and research directions," International Journal of Production Economics, Elsevier, vol. 115(2), pages 316-335, October.
    29. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
    2. Faranak Emtehani & Nasim Nahavandi & Farimah Mokhatab Rafiei, 2021. "A joint inventory–finance model for coordinating a capital-constrained supply chain with financing limitations," Financial Innovation, Springer;Southwestern University of Finance and Economics, vol. 7(1), pages 1-39, December.
    3. Herbon, Avi, 2021. "An integrated manufacturer-buyer chain with bounded production cycle length," Operations Research Perspectives, Elsevier, vol. 8(C).
    4. Utama, Dana Marsetiya & Santoso, Imam & Hendrawan, Yusuf & Dania, Wike Agustin Prima, 2022. "Integrated procurement-production inventory model in supply chain: A systematic review," Operations Research Perspectives, Elsevier, vol. 9(C).
    5. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    6. Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers," International Journal of Production Economics, Elsevier, vol. 245(C).
    7. Glock, Christoph H. & Rekik, Yacine & Ries, Jörg M., 2020. "A coordination mechanism for supply chains with capacity expansions and order-dependent lead times," European Journal of Operational Research, Elsevier, vol. 285(1), pages 247-262.
    8. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    9. Sudip Adak & G. S. Mahapatra, 2021. "Effect of inspection and rework of probabilistic defective production on two-layer supply chain incorporating deterioration and reliability dependent demand," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 12(3), pages 565-578, June.
    10. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    11. Mohammed Alkahtani & Muhammad Omair & Qazi Salman Khalid & Ghulam Hussain & Imran Ahmad & Catalin Pruncu, 2021. "A COVID-19 Supply Chain Management Strategy Based on Variable Production under Uncertain Environment Conditions," IJERPH, MDPI, vol. 18(4), pages 1-23, February.
    12. Wakhid Ahmad Jauhari & I Nyoman Pujawan & Mokh Suef, 2023. "Sustainable inventory management with hybrid production system and investment to reduce defects," Annals of Operations Research, Springer, vol. 324(1), pages 543-572, May.
    13. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    14. Asif Iqbal Malik & Byung Soo Kim, 2020. "A Constrained Production System Involving Production Flexibility and Carbon Emissions," Mathematics, MDPI, vol. 8(2), pages 1-21, February.
    15. Heibatolah Sadeghi & Hêriş Golpîra & Faicel Hnaien & Cosimo Magazzino, 2023. "Pricing-inventory model with discrete demand and delivery orders," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 33(3), pages 119-139.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    2. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    3. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    4. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    5. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    6. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    7. Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers," International Journal of Production Economics, Elsevier, vol. 245(C).
    8. Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.
    9. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
    10. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    11. Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.
    12. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    13. Herbon, Avi & David, Israel, 2023. "Optimal manufacturer's cost sharing ratio, shipping policy and production rate – A two-echelon supply chain," Operations Research Perspectives, Elsevier, vol. 10(C).
    14. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    15. Faranak Emtehani & Nasim Nahavandi & Farimah Mokhatab Rafiei, 2021. "A joint inventory–finance model for coordinating a capital-constrained supply chain with financing limitations," Financial Innovation, Springer;Southwestern University of Finance and Economics, vol. 7(1), pages 1-39, December.
    16. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    17. Lucio Enrico Zavanella & Beatrice Marchi & Simone Zanoni & Ivan Ferretti, 2019. "Energy considerations for the economic production quantity and the joint economic lot sizing," Journal of Business Economics, Springer, vol. 89(7), pages 845-865, September.
    18. Abdelsalam, Hisham M. & Elassal, Magy M., 2014. "Joint economic lot sizing problem for a three—Layer supply chain with stochastic demand," International Journal of Production Economics, Elsevier, vol. 155(C), pages 272-283.
    19. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    20. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:191:y:2017:i:c:p:335-350. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.