IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v103y2006i1p199-208.html
   My bibliography  Save this article

Joint economic procurement--production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system

Author

Listed:
  • Kim, Taebok
  • Hong, Yushin
  • Chang, Soo Young

Abstract

No abstract is available for this item.

Suggested Citation

  • Kim, Taebok & Hong, Yushin & Chang, Soo Young, 2006. "Joint economic procurement--production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system," International Journal of Production Economics, Elsevier, vol. 103(1), pages 199-208, September.
  • Handle: RePEc:eee:proeco:v:103:y:2006:i:1:p:199-208
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(05)00223-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ouenniche, Jamal & Boctor, Fayez F., 2001. "The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops," European Journal of Operational Research, Elsevier, vol. 129(3), pages 539-554, March.
    2. Bertazzi, Luca, 2003. "Rounding off the optimal solution of the economic lot size problem," International Journal of Production Economics, Elsevier, vol. 81(1), pages 385-392, January.
    3. Kim, Seung-Lae & Ha, Daesung, 2003. "A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage," International Journal of Production Economics, Elsevier, vol. 86(1), pages 1-10, October.
    4. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    5. Grznar, J. & Riggle, C., 1997. "An optimal algorithm for the basic period approach to the economic lot scheduling problem," Omega, Elsevier, vol. 25(3), pages 355-364, June.
    6. Hsu, John I. S. & EI-Najdawi, M., 1990. "Common cycle scheduling in a multistage production process," Engineering Costs and Production Economics, Elsevier, vol. 20(1), pages 73-80, July.
    7. Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
    8. Wen-Lian Hsu, 1983. "On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine," Management Science, INFORMS, vol. 29(1), pages 93-105, January.
    9. Earl E. Bomberger, 1966. "A Dynamic Programming Approach to a Lot Size Scheduling Problem," Management Science, INFORMS, vol. 12(11), pages 778-784, July.
    10. Kelle, Peter & Al-khateeb, Faisal & Anders Miller, Pam, 2003. "Partnership and negotiation support by joint optimal ordering/setup policies for JIT," International Journal of Production Economics, Elsevier, vol. 81(1), pages 431-441, January.
    11. HSU, Wen-Lian, 1983. "On the general feasibility test of scheduling lot sizes for several products on one machine," LIDAM Reprints CORE 515, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    12. Banerjee, Avijit & Burton, Jonathan S., 1994. "Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 215-222, June.
    13. Khoury, B. N. & Abboud, N. E. & Tannous, M. M., 2001. "The common cycle approach to the ELSP problem with insufficient capacity," International Journal of Production Economics, Elsevier, vol. 73(2), pages 189-199, September.
    14. Khouja, Moutaz, 1997. "The scheduling of economic lot sizes on volume flexible production systems," International Journal of Production Economics, Elsevier, vol. 48(1), pages 73-86, January.
    15. Wagner, Bret J. & Davis, Darwin J., 2002. "A search heuristic for the sequence-dependent economic lot scheduling problem," European Journal of Operational Research, Elsevier, vol. 141(1), pages 133-146, August.
    16. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hoque, M.A., 2011. "Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization," International Journal of Production Economics, Elsevier, vol. 131(2), pages 463-472, June.
    2. Utama, Dana Marsetiya & Santoso, Imam & Hendrawan, Yusuf & Dania, Wike Agustin Prima, 2022. "Integrated procurement-production inventory model in supply chain: A systematic review," Operations Research Perspectives, Elsevier, vol. 9(C).
    3. Ik Sun Lee, 2016. "Production and shipment policy under dynamic demand in the supply chain environments," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 8(1), pages 1-19.
    4. Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
    5. Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
    6. Osman, Hany & Demirli, Kudret, 2012. "Economic lot and delivery scheduling problem for multi-stage supply chains," International Journal of Production Economics, Elsevier, vol. 136(2), pages 275-286.
    7. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    8. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    9. Hoque, M.A., 2008. "Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain," European Journal of Operational Research, Elsevier, vol. 188(3), pages 811-825, August.
    10. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    11. Osman, Hany & Demirli, Kudret, 2012. "Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time," International Journal of Production Economics, Elsevier, vol. 135(1), pages 299-307.
    12. Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
    13. Gheidar Kheljani, J. & Ghodsypour, S.H. & O'Brien, C., 2009. "Optimizing whole supply chain benefit versus buyer's benefit through supplier selection," International Journal of Production Economics, Elsevier, vol. 121(2), pages 482-493, October.
    14. Hariga, Moncer & Hassini, Elkafi & Ben-Daya, Mohamed, 2014. "A note on generalized single-vendor multi-buyer integrated inventory supply chain models with better synchronization," International Journal of Production Economics, Elsevier, vol. 154(C), pages 313-316.
    15. Sajadieh, Mohsen S. & Fallahnezhad, Mohammad Saber & Khosravi, Maryam, 2013. "A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system," International Journal of Production Economics, Elsevier, vol. 146(2), pages 738-744.
    16. Tátrai Tünde & Vörösmarty Gyöngyi, 2023. "Comparative Analysis of the European Centralised Public Procurement," Central European Journal of Public Policy, Sciendo, vol. 17(2), pages 82-96, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
    2. Kelle, Peter & Miller, Pamela A. & Akbulut, Asli Y., 2007. "Coordinating ordering/shipment policy for buyer and supplier: Numerical and empirical analysis of influencing factors," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 100-110, July.
    3. Banerjee, Avijit & Kim, Seung-Lae & Burton, Jonathan, 2007. "Supply chain coordination through effective multi-stage inventory linkages in a JIT environment," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 271-280, July.
    4. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
    5. Daniel Adelman & Christiane Barz, 2014. "A Unifying Approximate Dynamic Programming Model for the Economic Lot Scheduling Problem," Mathematics of Operations Research, INFORMS, vol. 39(2), pages 374-402, May.
    6. Torabi, S.A. & Karimi, B. & Fatemi Ghomi, S.M.T., 2005. "The common cycle economic lot scheduling in flexible job shops: The finite horizon case," International Journal of Production Economics, Elsevier, vol. 97(1), pages 52-65, July.
    7. Khoury, B. N. & Abboud, N. E. & Tannous, M. M., 2001. "The common cycle approach to the ELSP problem with insufficient capacity," International Journal of Production Economics, Elsevier, vol. 73(2), pages 189-199, September.
    8. Bylka, StanisLaw, 2011. "Non-cooperative strategies for production and shipment lot sizing in one vendor-multi-buyer system," International Journal of Production Economics, Elsevier, vol. 131(1), pages 372-382, May.
    9. Chung, Chun-Jen & Wee, Hui-Ming, 2008. "Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain," International Journal of Production Economics, Elsevier, vol. 113(2), pages 528-545, June.
    10. Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
    11. Banerjee, Avijit, 2009. "Simultaneous determination of multiproduct batch and full truckload shipment schedules," International Journal of Production Economics, Elsevier, vol. 118(1), pages 111-117, March.
    12. Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
    13. Ho, Chia-Huei & Ouyang, Liang-Yuh & Su, Chia-Hsien, 2008. "Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit," European Journal of Operational Research, Elsevier, vol. 187(2), pages 496-510, June.
    14. Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
    15. Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
    16. P. C. Geng & R. G. Vickson, 1988. "Two heuristics for the economic lot scheduling problem: An experimental study," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(4), pages 605-617, August.
    17. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
    18. Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
    19. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
    20. Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:103:y:2006:i:1:p:199-208. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.