IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v146y2013i2p738-744.html
   My bibliography  Save this article

A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system

Author

Listed:
  • Sajadieh, Mohsen S.
  • Fallahnezhad, Mohammad Saber
  • Khosravi, Maryam

Abstract

This paper considers an integrated production–inventory model for a three-stage supply chain involving multiple suppliers, multiple manufacturers and multiple retailers. The suppliers/manufacturers produce the raw materials/final goods at a finite rate and deliver the materials/goods in a number of batches to the manufacturers/retailers. We analyze the problem where the lead times from the manufacturers to the retailers are stochastic and shortage is allowed. We also explicitly include the transportation costs from the manufacturers to the retailers into the model. The numerical analysis shows that the coordination mechanism employed is more beneficial for the cases with less unpredictable lead times, lower shortage prices, and no transportation cost.

Suggested Citation

  • Sajadieh, Mohsen S. & Fallahnezhad, Mohammad Saber & Khosravi, Maryam, 2013. "A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system," International Journal of Production Economics, Elsevier, vol. 146(2), pages 738-744.
  • Handle: RePEc:eee:proeco:v:146:y:2013:i:2:p:738-744
    DOI: 10.1016/j.ijpe.2013.09.002
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527313003885
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2013.09.002?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    2. Sajadieh, Mohsen S. & Thorstenson, Anders & Jokar, Mohammad R. Akbari, 2010. "An integrated vendor-buyer model with stock-dependent demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 46(6), pages 963-974, November.
    3. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    4. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    5. Hoque, Mohammad A. & Goyal, Suresh K., 2006. "A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer," International Journal of Production Economics, Elsevier, vol. 102(2), pages 217-225, August.
    6. Jaber, M.Y. & Goyal, S.K., 2008. "Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers," International Journal of Production Economics, Elsevier, vol. 116(1), pages 95-103, November.
    7. Glock, C. H., 2012. "The joint economic lot size problem: a review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57811, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    9. Ben-Daya, Mohammed & As’ad, Rami & Seliaman, Mohammed, 2013. "An integrated production inventory model with raw material replenishment considerations in a three layer supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 53-61.
    10. Kim, Taebok & Hong, Yushin & Chang, Soo Young, 2006. "Joint economic procurement--production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system," International Journal of Production Economics, Elsevier, vol. 103(1), pages 199-208, September.
    11. Khouja, Moutaz, 2003. "Optimizing inventory decisions in a multi-stage multi-customer supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 39(3), pages 193-208, May.
    12. Cárdenas-Barrón, Leopoldo Eduardo, 2007. "Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 43(5), pages 647-654, September.
    13. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    14. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    15. Siajadi, Hans & Ibrahim, Raafat N. & Lochert, Paul B., 2006. "Joint economic lot size in distribution system with multiple shipment policy," International Journal of Production Economics, Elsevier, vol. 102(2), pages 302-316, August.
    16. Sajadieh, Mohsen S. & Akbari Jokar, Mohammad R., 2009. "Optimizing shipment, ordering and pricing policies in a two-stage supply chain with price-sensitive demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 45(4), pages 564-571, July.
    17. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    18. Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
    19. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    2. Sawik, Tadeusz, 2015. "On the fair optimization of cost and customer service level in a supply chain under disruption risks," Omega, Elsevier, vol. 53(C), pages 58-66.
    3. Muhammad Waqas Iqbal & Muhammad Babar Ramzan & Asif Iqbal Malik, 2022. "Food Preservation within Multi-Echelon Supply Chain Considering Single Setup and Multi-Deliveries of Unequal Lot Size," Sustainability, MDPI, vol. 14(11), pages 1-30, June.
    4. Islam, S.M. Shahidul & Hoque, Md. Abdul & Hamzah, Norhayati, 2017. "Single-supplier single-manufacturer multi-retailer consignment policy for retailers’ generalized demand distributions," International Journal of Production Economics, Elsevier, vol. 184(C), pages 157-167.
    5. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    2. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    3. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    4. Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
    5. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    6. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
    7. S. M. Shahidul Islam & Mohammad Abdul Hoque, 2017. "A joint economic lot size model for a supplier-manufacturer-retailers supply chain of an agricultural product," OPSEARCH, Springer;Operational Research Society of India, vol. 54(4), pages 868-885, December.
    8. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    9. Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
    10. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    11. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    12. Sarker, Bhaba R. & Rochanaluk, Ratkrit & Yi, Huizhi & Egbelu, Pius J., 2014. "An operational policy for a three-stage distributive supply chain system with retailers’ backorders," International Journal of Production Economics, Elsevier, vol. 156(C), pages 332-345.
    13. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    14. Abdelsalam, Hisham M. & Elassal, Magy M., 2014. "Joint economic lot sizing problem for a three—Layer supply chain with stochastic demand," International Journal of Production Economics, Elsevier, vol. 155(C), pages 272-283.
    15. Islam, S.M. Shahidul & Hoque, Md. Abdul & Hamzah, Norhayati, 2017. "Single-supplier single-manufacturer multi-retailer consignment policy for retailers’ generalized demand distributions," International Journal of Production Economics, Elsevier, vol. 184(C), pages 157-167.
    16. Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
    17. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    18. Ik Sun Lee, 2016. "Production and shipment policy under dynamic demand in the supply chain environments," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 8(1), pages 1-19.
    19. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    20. Ben-Daya, Mohammed & As’ad, Rami & Seliaman, Mohammed, 2013. "An integrated production inventory model with raw material replenishment considerations in a three layer supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 53-61.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:146:y:2013:i:2:p:738-744. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.