Reference Class Forecasting In Icelandic Transport Infrastructure Projects

Author

Listed:
  • Thordur Vikingur FRIDGEIRSSON

    (Reykjavik University Menntavegur 1, 101 Reykjavik, Iceland)

Abstract

Summary. Previous studies have indicated that the majority of infrastructure projects have cost overruns. The root causes are traced to political,...

Suggested Citation

  • Thordur Vikingur FRIDGEIRSSON, 2016. "Reference Class Forecasting In Icelandic Transport Infrastructure Projects," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 11(2), pages 103-115, June.
  • Handle: RePEc:exl:1trans:v:11:y:2016:i:2:p:103-115
    DOI: 10.20858/tp.2016.11.2.10
    as

    Download full text from publisher

    File URL: https://www.exeley.com/exeley/journals/transport_problems/11/2/pdf/10.20858_tp.2016.11.2.10.pdf
    Download Restriction: no

    File URL: https://www.exeley.com/transport_problems/doi/10.20858/tp.2016.11.2.10
    Download Restriction: no

    File URL: https://libkey.io/10.20858/tp.2016.11.2.10?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Bent Flyvbjerg, 2013. "Quality Control and Due Diligence in Project Management: Getting Decisions Right by Taking the Outside View," Papers 1302.2544, arXiv.org.
    2. Will Jennings, 2012. "Why costs overrun: risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games," Construction Management and Economics, Taylor & Francis Journals, vol. 30(6), pages 455-462, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lordan-Perret, Rebecca & Bärenbold, Rebekka & Weigt, Hannes & Rosner, Robert, 2023. "An ex-ante method to verify commercial U.S. nuclear power plant decommissioning cost estimates," Energy Economics, Elsevier, vol. 127(PB).
    2. Chapman, Paul & Quang, Cuong, 2021. "Major Project Risk Management: Reconciling Complexity during Delivery with the Inside View in Planning," SocArXiv j9sw8, Center for Open Science.
    3. Lordan-Perret, Rebecca & Bärenbold, Rebekka & Weigt, Hannes & Rosner, Robert, 2022. "An Ex-Ante Method to Verify Commercial U.S. Nuclear Power Plant Decommissioning Cost Estimates," Working papers 2022/08, Faculty of Business and Economics - University of Basel.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bent Flyvbjerg & Alexander Budzier & Daniel Lunn, 2021. "Regression to the tail: Why the Olympics blow up," Environment and Planning A, , vol. 53(2), pages 233-260, March.
    2. Schreiner, Lena & Madlener, Reinhard, 2022. "Investing in power grid infrastructure as a flexibility option: A DSGE assessment for Germany," Energy Economics, Elsevier, vol. 107(C).
    3. Alexander Budzier & Bent Flyvbjerg & Andi Garavaglia & Andreas Leed, 2019. "Quantitative Cost and Schedule Risk Analysis of Nuclear Waste Storage," Papers 1901.11123, arXiv.org.
    4. Armstrong, J. Scott & Green, Kesten C. & Graefe, Andreas, 2015. "Golden rule of forecasting: Be conservative," Journal of Business Research, Elsevier, vol. 68(8), pages 1717-1731.
    5. Bent Flyvbjerg & Allison Stewart & Alexander Budzier, 2016. "The Oxford Olympics Study 2016: Cost and Cost Overrun at the Games," Papers 1607.04484, arXiv.org.
    6. Ginés de Rus, 2014. "The economic evaluation of infrastructure investment. Some inescapable tradeoffs," Working Papers 2014-16, FEDEA.
    7. Chiara Pancotti & Matteo Pedralli & Geert Smit & Silvia Vignetti, 2020. "Understanding transport project appraisal in its institutional dimension," Working Papers 201902, CSIL Centre for Industrial Studies.
    8. Rubina Canesi & Beatrice Gallo, 2023. "Risk Assessment in Sustainable Infrastructure Development Projects: A Tool for Mitigating Cost Overruns," Land, MDPI, vol. 13(1), pages 1-24, December.
    9. Locatelli, Giorgio & Mancini, Mauro & Todeschini, Nicola, 2013. "Generation IV nuclear reactors: Current status and future prospects," Energy Policy, Elsevier, vol. 61(C), pages 1503-1520.
    10. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
    11. Bent Flyvbjerg, 2014. "What You Should Know About Megaprojects, and Why: An Overview," Papers 1409.0003, arXiv.org.
    12. Flyvbjerg, Bent & Bester, Dirk W., 2021. "The Cost-Benefit Fallacy: Why Cost-Benefit Analysis Is Broken and How to Fix It," Journal of Benefit-Cost Analysis, Cambridge University Press, vol. 12(3), pages 395-419, October.
    13. Ika, Lavagnon A., 2018. "Beneficial or Detrimental Ignorance: The Straw Man Fallacy of Flyvbjerg’s Test of Hirschman’s Hiding Hand," World Development, Elsevier, vol. 103(C), pages 369-382.
    14. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
    15. Dutta, Debprotim & Bose, Indranil, 2015. "Managing a Big Data project: The case of Ramco Cements Limited," International Journal of Production Economics, Elsevier, vol. 165(C), pages 293-306.
    16. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
    17. Anatoliy Kovalyov & Olha Vynokurova, 2017. "Practical Guideline for the Restructuring of Enterprises Involving Consulting Services (on the Example of Ukrainian Industrial Enterprises)," European Financial and Accounting Journal, Prague University of Economics and Business, vol. 2017(3), pages 171-189.
    18. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
    19. Einat Tenenboim & Nira Munichor & Yoram Shiftan, 2023. "Justifying toll payment with biased travel time estimates: Behavioral findings and route choice modeling," Transportation, Springer, vol. 50(2), pages 477-511, April.
    20. Vicente Alcaraz Carrillo de Albornoz & Juan Molina Millán & Antonio Lorenzo Lara Galera & Belén Muñoz-Medina, 2022. "A Dysfunctional Legal Framework for Failed Public–Private Partnership Projects: Accounting or Economics?," Social Sciences, MDPI, vol. 11(12), pages 1-12, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:exl:1trans:v:11:y:2016:i:2:p:103-115. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MPS Ltd. (email available below). General contact details of provider: https://www.exeley.com/journal/transport_problems .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.