IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v48y1997i2p187-204.html
   My bibliography  Save this article

Scheduling policies for remanufacturing

Author

Listed:
  • Guide, V. Daniel R.
  • Kraus, Mark E.
  • Srivastava, Rajesh

Abstract

No abstract is available for this item.

Suggested Citation

  • Guide, V. Daniel R. & Kraus, Mark E. & Srivastava, Rajesh, 1997. "Scheduling policies for remanufacturing," International Journal of Production Economics, Elsevier, vol. 48(2), pages 187-204, January.
  • Handle: RePEc:eee:proeco:v:48:y:1997:i:2:p:187-204
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(96)00091-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sculli, D, 1987. "Priority dispatching rules in an assembly shop," Omega, Elsevier, vol. 15(1), pages 49-57.
    2. Sculli, Dominic, 1980. "Priority dispatching rules in job shops with assembly operations and random delays," Omega, Elsevier, vol. 8(2), pages 227-234.
    3. Kumar, Narendra & Vrat, Prem & Sushil, 1994. "A simulation study of unit exchange spares management of diesel locomotives in the Indian railways," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 225-236, January.
    4. Rousso, Ada S. & Shah, Shvetank P., 1994. "Packaging Taxes and Recycling Incentives: The German Green Dot Program," National Tax Journal, National Tax Association;National Tax Journal, vol. 47(3), pages 689-701, September.
    5. Rousso, Ada S. & Shah, Shvetank P., 1994. "Packaging Taxes and Recycling Incentives: The German Green Dot Program," National Tax Journal, National Tax Association, vol. 47(3), pages 689-701, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Li, Jianzhi & González, Miguel & Zhu, Yun, 2009. "A hybrid simulation optimization method for production planning of dedicated remanufacturing," International Journal of Production Economics, Elsevier, vol. 117(2), pages 286-301, February.
    2. Wang, Gang & Gunasekaran, Angappa, 2017. "Operations scheduling in reverse supply chains: Identical demand and delivery deadlines," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 375-381.
    3. Daniel, V. & Guide, R. Jr., 1997. "Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 53(1), pages 101-116, November.
    4. Kristianto, Yohanes & Helo, Petri, 2015. "Reprint of “Product architecture modularity implications for operations economy of green supply chains”," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 74(C), pages 63-80.
    5. Pokharel, Shaligram & Mutha, Akshay, 2009. "Perspectives in reverse logistics: A review," Resources, Conservation & Recycling, Elsevier, vol. 53(4), pages 175-182.
    6. Guide, V. Daniel R. & Souza, Gilvan C. & van der Laan, Erwin, 2005. "Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly," European Journal of Operational Research, Elsevier, vol. 164(2), pages 341-353, July.
    7. de Brito, M.P. & Flapper, S.D.P. & Dekker, R., 2002. "Reverse logistics," Econometric Institute Research Papers EI 2002-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    8. Kristianto, Yohanes & Helo, Petri, 2014. "Product architecture modularity implications for operations economy of green supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 70(C), pages 128-145.
    9. Gaur, Jighyasu & Amini, Mehdi & Rao, A.K., 2017. "Closed-loop supply chain configuration for new and reconditioned products: An integrated optimization model," Omega, Elsevier, vol. 66(PB), pages 212-223.
    10. Barba-Gutierrez, Y. & Adenso-Diaz, B. & Gupta, S.M., 2008. "Lot sizing in reverse MRP for scheduling disassembly," International Journal of Production Economics, Elsevier, vol. 111(2), pages 741-751, February.
    11. Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
    12. Ferrer, Geraldo & Heath, Susan K. & Dew, Nicholas, 2011. "An RFID application in large job shop remanufacturing operations," International Journal of Production Economics, Elsevier, vol. 133(2), pages 612-621, October.
    13. Inderfurth, K. & Teunter, R.H., 2001. "Production planning and control of closed-loop supply chains," Econometric Institute Research Papers EI 2001-39, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    14. Huang, Ximin & Choi, Sin-Man & Ching, Wai-Ki & Siu, Tak-Kuen & Huang, Min, 2011. "On supply chain coordination for false failure returns: A quantity discount contract approach," International Journal of Production Economics, Elsevier, vol. 133(2), pages 634-644, October.
    15. Rafael Diaz & Erika Marsillac, 2017. "Evaluating strategic remanufacturing supply chain decisions," International Journal of Production Research, Taylor & Francis Journals, vol. 55(9), pages 2522-2539, May.
    16. Wenjie Wang & Guangdong Tian & Gang Yuan & Duc Truong Pham, 2023. "Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm," Journal of Intelligent Manufacturing, Springer, vol. 34(3), pages 1065-1083, March.
    17. Roland Geyer & Luk N. Van Wassenhove & Atalay Atasu, 2007. "The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles," Management Science, INFORMS, vol. 53(1), pages 88-100, January.
    18. V. Daniel R. Guide & Vaidyanathan Jayaraman & Rajesh Srivastava & W. C. Benton, 2000. "Supply-Chain Management for Recoverable Manufacturing Systems," Interfaces, INFORMS, vol. 30(3), pages 125-142, June.
    19. Huang, Shui-Mu & Su, Jack C.P., 2013. "Impact of product proliferation on the reverse supply chain," Omega, Elsevier, vol. 41(3), pages 626-639.
    20. Hazen, Benjamin T. & Overstreet, Robert E. & Jones-Farmer, L. Allison & Field, Hubert S., 2012. "The role of ambiguity tolerance in consumer perception of remanufactured products," International Journal of Production Economics, Elsevier, vol. 135(2), pages 781-790.
    21. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    22. Evangelos Sambracos & Irene Ramfou, 2013. "Freight Transport Time Savings and Organizational Performance: A Systemic Approach," International Journal of Business and Economic Sciences Applied Research (IJBESAR), International Hellenic University (IHU), Kavala Campus, Greece (formerly Eastern Macedonia and Thrace Institute of Technology - EMaTTech), vol. 6(1), pages 19-40, April.
    23. Sambracos, Evangelos & Ramfou, Irene, 2010. "Assessing the role of goods transport in organizational performance," MPRA Paper 52204, University Library of Munich, Germany.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Daniel, V. & Guide, R. Jr., 1997. "Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 53(1), pages 101-116, November.
    2. Thomas C. Kinnaman & Don Fullerton, 2002. "The Economics of Residential Solid Waste Management," Chapters, in: Don Fullerton & Thomas C. Kinnaman (ed.), The Economics of Household Garbage and Recycling Behavior, chapter 1, pages 1-48, Edward Elgar Publishing.
    3. Marco Runkel, 2003. "Product Durability and Extended Producer Responsibility in Solid Waste Management," Environmental & Resource Economics, Springer;European Association of Environmental and Resource Economists, vol. 24(2), pages 161-182, February.
    4. Don Fullerton & Wenbo Wu, 2002. "Policies for Green Design," Chapters, in: Don Fullerton & Thomas C. Kinnaman (ed.), The Economics of Household Garbage and Recycling Behavior, chapter 5, pages 102-119, Edward Elgar Publishing.
    5. Thomas Eichner, 2005. "Imperfect Competition In The Recycling Industry," Metroeconomica, Wiley Blackwell, vol. 56(1), pages 1-24, February.
    6. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
    7. Eichner, Thomas & Pethig, Rudiger, 2001. "Product Design and Efficient Management of Recycling and Waste Treatment," Journal of Environmental Economics and Management, Elsevier, vol. 41(1), pages 109-134, January.
    8. Santosh Kumar Sahu & Prantik Bagchi, 2023. "Waste from production: an analysis at the firm level," Quality & Quantity: International Journal of Methodology, Springer, vol. 57(3), pages 2641-2656, June.
    9. M. R. Mathews, 2001. "Some thoughts on social and environmental accounting education," Accounting Education, Taylor & Francis Journals, vol. 10(4), pages 335-352.
    10. Choe, Chongwoo & Fraser, Iain, 1998. "The economics of household waste management: a review," Australian Journal of Agricultural and Resource Economics, Australian Agricultural and Resource Economics Society, vol. 42(3), pages 1-34.
    11. Jayaraman, Vaidyanathan & Patterson, Raymond A. & Rolland, Erik, 2003. "The design of reverse distribution networks: Models and solution procedures," European Journal of Operational Research, Elsevier, vol. 150(1), pages 128-149, October.
    12. Conrad, Klaus, 1997. "A Theory of Production with Waste and Recycling," Discussion Papers 550, Institut fuer Volkswirtschaftslehre und Statistik, Abteilung fuer Volkswirtschaftslehre.
    13. Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2016. "Closed-loop supply chains: What reverse logistics factors influence performance?," International Journal of Production Economics, Elsevier, vol. 175(C), pages 35-49.
    14. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    15. Zhang, Rui & Chang, Pei-Chann & Wu, Cheng, 2013. "A hybrid genetic algorithm for the job shop scheduling problem with practical considerations for manufacturing costs: Investigations motivated by vehicle production," International Journal of Production Economics, Elsevier, vol. 145(1), pages 38-52.
    16. D-H Lee & P Xirouchakis, 2004. "A two-stage heuristic for disassembly scheduling with assembly product structure," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(3), pages 287-297, March.
    17. Xiao Wang & Mei Liu & Peisi Zhong & Chao Zhang & Dawei Zhang, 2023. "A Discrete Cooperative Control Method for Production Scheduling Problem of Assembly Manufacturing System," Sustainability, MDPI, vol. 15(18), pages 1-23, September.
    18. Golenko-Ginzburg, Dimitri & Kesler, Shmuel & Landsman, Zinoviy, 1995. "Industrial job-shop scheduling with random operations and different priorities," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 185-195, August.
    19. Prashant Premkumar & P. N. Ram Kumar, 2019. "Literature Review of Locomotive Assignment Problem from Service Operations Perspective: The Case of Indian Railways," IIM Kozhikode Society & Management Review, , vol. 8(1), pages 74-86, January.
    20. Thomas Schmitt & Bruce Faaland, 2004. "Scheduling recurrent construction," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(8), pages 1102-1128, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:48:y:1997:i:2:p:187-204. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.