IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v287y2020i3p1092-1104.html
   My bibliography  Save this article

The effect of risk aversion on the optimal project resource rate

Author

Listed:
  • Palit, Niladri
  • Brint, Andrew

Abstract

Under resourcing a project increases the probability of a time overrun. Consequently, project contracts should be designed to encourage an appropriate allocation of resources to the project. A common way to encourage timely completion is to use contracts with time penalties and incentives linked to the completion time. If there are a number of competing contractors, then the project manager can employ a take it or leave it approach in designing the contract. However, where there are very few possible contractors, then a bargaining approach is more appropriate for the contract's construction. Therefore, this paper investigates how close the resource rate stemming from the Nash bargaining contract is to the optimal rate. Risk neutral and risk averse project managers and contractors are considered. It is found that when the contractor is risk neutral, the chosen resource rate is independent of the project completion time distribution no matter whether the project manager is risk neutral or risk averse, and it coincides with the optimal, i.e. centrally coordinated, rate. When the contractor is risk averse, the resource rate is dependent on the project completion time distribution. However, the results indicate that if the contractor is less risk averse than the project manager, then the resource rate is approximately the optimal one. Hence a time based contract designed using Nash bargaining is particularly suitable when the number of possible contractors is small and they are large enough with regard to the project size to be less risk averse than the project manager.

Suggested Citation

  • Palit, Niladri & Brint, Andrew, 2020. "The effect of risk aversion on the optimal project resource rate," European Journal of Operational Research, Elsevier, vol. 287(3), pages 1092-1104.
  • Handle: RePEc:eee:ejores:v:287:y:2020:i:3:p:1092-1104
    DOI: 10.1016/j.ejor.2020.05.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221720304148
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2020.05.003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Abdelkader, Yousry H., 2004. "Evaluating project completion times when activity times are Weibull distributed," European Journal of Operational Research, Elsevier, vol. 157(3), pages 704-715, September.
    2. Muthoo,Abhinay, 1999. "Bargaining Theory with Applications," Cambridge Books, Cambridge University Press, number 9780521576475.
    3. Gregory Lewis & Patrick Bajari, 2014. "Moral Hazard, Incentive Contracts, and Risk: Evidence from Procurement," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 81(3), pages 1201-1228.
    4. Pérez, José García & Martín, María del Mar López & García, Catalina García & Sánchez Granero, Miguel Ángel, 2016. "Project management under uncertainty beyond beta: The generalized bicubic distribution," Operations Research Perspectives, Elsevier, vol. 3(C), pages 67-76.
    5. Trietsch, Dan & Mazmanyan, Lilit & Gevorgyan, Lilit & Baker, Kenneth R., 2012. "Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation," European Journal of Operational Research, Elsevier, vol. 216(2), pages 386-396.
    6. Sarkar, Sumit, 2019. "Gratitude, conscience, and reciprocity: Models of supplier motivation when quality is non-contractible," European Journal of Operational Research, Elsevier, vol. 277(2), pages 633-642.
    7. Lippman, Steven A. & McCardle, Kevin F. & Tang, Christopher S., 2013. "Using Nash bargaining to design project management contracts under cost uncertainty," International Journal of Production Economics, Elsevier, vol. 145(1), pages 199-207.
    8. Shi Chen & Hau Lee, 2017. "Incentive Alignment and Coordination of Project Supply Chains," Management Science, INFORMS, vol. 63(4), pages 1011-1025, April.
    9. Qingfeng Meng & Jingxian Chen & Kun Qian, 2018. "The Complexity and Simulation of Revenue Sharing Negotiation Based on Construction Stakeholders," Complexity, Hindawi, vol. 2018, pages 1-11, August.
    10. De, Prabuddha & James Dunne, E. & Ghosh, Jay B. & Wells, Charles E., 1995. "The discrete time-cost tradeoff problem revisited," European Journal of Operational Research, Elsevier, vol. 81(2), pages 225-238, March.
    11. Messinger, Paul R., 2016. "The role of fairness in competitive supply chain relationships: An experimental studyAuthor-Name: Choi, Sungchul," European Journal of Operational Research, Elsevier, vol. 251(3), pages 798-813.
    12. Rabin, Matthew, 1993. "Incorporating Fairness into Game Theory and Economics," American Economic Review, American Economic Association, vol. 83(5), pages 1281-1302, December.
    13. Kerkhove, L.P. & Vanhoucke, M., 2016. "Incentive contract design for projects: The owner׳s perspective," Omega, Elsevier, vol. 62(C), pages 93-114.
    14. P E D Love & C-P Sing & X Wang & D J Edwards & H Odeyinka, 2013. "Probability distribution fitting of schedule overruns in construction projects," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 64(8), pages 1231-1247, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qingfeng Meng & Zhen Li & Jianguo Du & Huimin Liu & Xiang Ding, 2019. "Negotiation for Time Optimization in Construction Projects with Competitive and Social Welfare Preferences," Complexity, Hindawi, vol. 2019, pages 1-13, January.
    2. Leonardo M. Giuffrida & Gabriele Rovigatti, 2022. "Supplier selection and contract enforcement: Evidence from performance bonding," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 31(4), pages 980-1019, November.
    3. Sarkar, Sumit & Bhala, Shrey, 2021. "Coordinating a closed loop supply chain with fairness concern by a constant wholesale price contract," European Journal of Operational Research, Elsevier, vol. 295(1), pages 140-156.
    4. Kragl, Jenny & Gogova, Martina, 2013. "Wage Bargaining when Workers Have Fairness Concerns," VfS Annual Conference 2013 (Duesseldorf): Competition Policy and Regulation in a Global Economic Order 79790, Verein für Socialpolitik / German Economic Association.
    5. He, Chusu & Milne, Alistair & Ataullah, Ali, 2023. "What explains delays in public procurement decisions?," Economic Modelling, Elsevier, vol. 121(C).
    6. Ni Du & Qinglan Han, 2018. "Pricing and Service Quality Guarantee Decisions in Logistics Service Supply Chain with Fairness Concern," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 35(05), pages 1-41, October.
    7. Đula, Ivan & Größler, Andreas, 2021. "Inequity aversion in dynamically complex supply chains," European Journal of Operational Research, Elsevier, vol. 291(1), pages 309-322.
    8. Arnaud Zlatko Dragicevic, 2022. "Exchange Networks with Stochastic Matching," Games, MDPI, vol. 14(1), pages 1-18, December.
    9. Yigal Gerchak & Eugene Khmelnitsky, 2019. "Bargaining over shares of uncertain future profits," EURO Journal on Decision Processes, Springer;EURO - The Association of European Operational Research Societies, vol. 7(1), pages 55-68, May.
    10. Kim, Byung-Cheol, 2022. "Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment," European Journal of Operational Research, Elsevier, vol. 296(2), pages 679-695.
    11. Sarkar, Sumit, 2019. "Gratitude, conscience, and reciprocity: Models of supplier motivation when quality is non-contractible," European Journal of Operational Research, Elsevier, vol. 277(2), pages 633-642.
    12. Chai, Junyi, 2021. "A model of ambition, aspiration and happiness," European Journal of Operational Research, Elsevier, vol. 288(2), pages 692-702.
    13. Eve-Angéline Lambert & Jean-Christian Tisserand, 2016. "Does the obligation to bargain make you fit the mould? An experimental analysis," Working Papers of BETA 2016-37, Bureau d'Economie Théorique et Appliquée, UDS, Strasbourg.
    14. Weihua Liu & Shuqing Wang & DongLei Zhu & Di Wang & Xinran Shen, 2018. "Order allocation of logistics service supply chain with fairness concern and demand updating: model analysis and empirical examination," Annals of Operations Research, Springer, vol. 268(1), pages 177-213, September.
    15. Engelhardt, Sebastian v. & Freytag, Andreas, 2013. "Institutions, culture, and open source," Journal of Economic Behavior & Organization, Elsevier, vol. 95(C), pages 90-110.
    16. Ellingsen, Tore & Johannesson, Magnus, 2009. "Time is not money," Journal of Economic Behavior & Organization, Elsevier, vol. 72(1), pages 96-102, October.
    17. Anne Corcos & Yorgos Rizopoulos, 2011. "Is prosocial behavior egocentric? The “invisible hand” of emotions," Post-Print halshs-01968213, HAL.
    18. Thomas Dohmen & Armin Falk & David Huffman & Uwe Sunde, 2009. "Homo Reciprocans: Survey Evidence on Behavioural Outcomes," Economic Journal, Royal Economic Society, vol. 119(536), pages 592-612, March.
    19. Adrian Bruhin & Ernst Fehr & Daniel Schunk, 2019. "The many Faces of Human Sociality: Uncovering the Distribution and Stability of Social Preferences," Journal of the European Economic Association, European Economic Association, vol. 17(4), pages 1025-1069.
    20. Vollmer Uwe, 2004. "Streissler, E.W. (Hrsg.), Studien zur Entwicklung der ökonomischen Theorie XIX," Journal of Economics and Statistics (Jahrbuecher fuer Nationaloekonomie und Statistik), De Gruyter, vol. 224(6), pages 758-759, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:287:y:2020:i:3:p:1092-1104. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.