IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v194y2009i3p728-742.html
   My bibliography  Save this item

An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2012. "Approximate evaluation of multi-location inventory models with lateral transshipments and hold back levels," European Journal of Operational Research, Elsevier, vol. 218(3), pages 624-635.
  2. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
  3. Guangyuan Yang & Rommert Dekker, 2010. "Service Parts Inventory Control with Lateral Transshipment that takes Time," Tinbergen Institute Discussion Papers 10-025/4, Tinbergen Institute, revised 10 Mar 2010.
  4. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
  5. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
  6. Yang, Guangyuan & Dekker, Rommert & Gabor, Adriana F. & Axsäter, Sven, 2013. "Service parts inventory control with lateral transshipment and pipeline stockflexibility," International Journal of Production Economics, Elsevier, vol. 142(2), pages 278-289.
  7. van Wingerden, E. & Tan, T. & Van Houtum, G.J., 2019. "The impact of an emergency warehouse in a two-echelon spare parts network," European Journal of Operational Research, Elsevier, vol. 276(3), pages 983-997.
  8. Abazari, Seyed Reza & Aghsami, Amir & Rabbani, Masoud, 2021. "Prepositioning and distributing relief items in humanitarian logistics with uncertain parameters," Socio-Economic Planning Sciences, Elsevier, vol. 74(C).
  9. Iyoob, Ilyas Mohamed & Kutanoglu, Erhan, 2013. "Inventory sharing in integrated network design and inventory optimization with low-demand parts," European Journal of Operational Research, Elsevier, vol. 224(3), pages 497-506.
  10. Yan, Xinghao & Zhao, Hui, 2015. "Inventory sharing and coordination among n independent retailers," European Journal of Operational Research, Elsevier, vol. 243(2), pages 576-587.
  11. Moghaddam, Mohsen & Nof, Shimon Y., 2014. "Combined demand and capacity sharing with best matching decisions in enterprise collaboration," International Journal of Production Economics, Elsevier, vol. 148(C), pages 93-109.
  12. M N Jalil & R A Zuidwijk & M Fleischmann & Jo A E E van Nunen, 2011. "Spare parts logistics and installed base information," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 442-457, March.
  13. Fouad Ben Abdelaziz & Sameh Mejri, 2018. "Multiobjective bi-level programming for shared inventory with emergency and backorders," Annals of Operations Research, Springer, vol. 267(1), pages 47-63, August.
  14. Somarin, Aghil Rezaei & Sharma, Pankaj & Tiwari, Sunil & Chen, Songlin, 2023. "Stock reallocation policy for repairable service parts in case of supply disruptions due to extreme weather events," International Journal of Production Economics, Elsevier, vol. 256(C).
  15. Simon Emde & Shohre Zehtabian & Yann Disser, 2023. "Point-to-point and milk run delivery scheduling: models, complexity results, and algorithms based on Benders decomposition," Annals of Operations Research, Springer, vol. 322(1), pages 467-496, March.
  16. Sahba, Pedram & BalcIog[small tilde]lu, BarIs, 2011. "The impact of transportation delays on repairshop capacity pooling and spare part inventories," European Journal of Operational Research, Elsevier, vol. 214(3), pages 674-682, November.
  17. Rohit Kapoor & Bhavin J. Shah, 2016. "Simulation model for closed loop repairable parts inventory system with service level performance measures," International Journal of Services and Operations Management, Inderscience Enterprises Ltd, vol. 23(1), pages 18-42.
  18. Baskaya, Serhat & Ertem, Mustafa Alp & Duran, Serhan, 2017. "Pre-positioning of relief items in humanitarian logistics considering lateral transhipment opportunities," Socio-Economic Planning Sciences, Elsevier, vol. 57(C), pages 50-60.
  19. Fredrik Olsson, 2019. "Simple modeling techniques for base-stock inventory systems with state dependent demand rates," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 90(1), pages 61-76, August.
  20. F R Johnston & E A Shale & S Kapoor & R True & A Sheth, 2011. "Breadth of range and depth of stock: forecasting and inventory management at Euro Car Parts Ltd," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 433-441, March.
  21. Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
  22. Moghaddam, Mohsen & Nof, Shimon Y., 2016. "Real-time optimization and control mechanisms for collaborative demand and capacity sharing," International Journal of Production Economics, Elsevier, vol. 171(P4), pages 495-506.
  23. Shuangyan Li & Xialian Li & Dezhi Zhang & Lingyun Zhou, 2017. "Joint Optimization of Distribution Network Design and Two-Echelon Inventory Control with Stochastic Demand and CO2 Emission Tax Charges," PLOS ONE, Public Library of Science, vol. 12(1), pages 1-22, January.
  24. Regattieri, A. & Giazzi, A. & Gamberi, M. & Gamberini, R., 2015. "An innovative method to optimize the maintenance policies in an aircraft: General framework and case study," Journal of Air Transport Management, Elsevier, vol. 44, pages 8-20.
  25. Zhang, Jiaqi & Archibald, Thomas W., 2011. "A semi-Markov model with holdout transshipment policy and phase-type exponential lead time," European Journal of Operational Research, Elsevier, vol. 211(3), pages 650-657, June.
  26. Seidscher, Arkadi & Minner, Stefan, 2013. "A Semi-Markov decision problem for proactive and reactive transshipments between multiple warehouses," European Journal of Operational Research, Elsevier, vol. 230(1), pages 42-52.
  27. Gerrits, B. & Topan, E. & van der Heijden, M.C., 2022. "Operational planning in service control towers – heuristics and case study," European Journal of Operational Research, Elsevier, vol. 302(3), pages 983-998.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.