Scheduling to minimize release‐time resource consumption and tardiness penalties

Author

Listed:
  • Chung‐Lun Li
  • Edward C. Sewell
  • T. C. E. Cheng

Abstract

We consider the problem of scheduling a set of jobs with a common due‐date on a single‐machine where the release time of a job is related to the amount of resource consumed. The objective is to minimize the total resource consumption and the total tardiness. While the problem is strongly NP‐hard in general, we discuss two different special cases for which special properties are identified and used to develop efficient pseudo‐polynomial time algorithms. © 1995 John Wiley & Sons, Inc.

Suggested Citation

  • Chung‐Lun Li & Edward C. Sewell & T. C. E. Cheng, 1995. "Scheduling to minimize release‐time resource consumption and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(6), pages 949-966, September.
  • Handle: RePEc:wly:navres:v:42:y:1995:i:6:p:949-966
    DOI: 10.1002/1520-6750(199509)42:63.0.CO;2-3
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(199509)42:63.0.CO;2-3
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(199509)42:63.0.CO;2-3?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Van Wassenhove, Luk N. & Baker, Kenneth R., 1982. "A bicriterion approach to time/cost trade-offs in sequencing," European Journal of Operational Research, Elsevier, vol. 11(1), pages 48-54, September.
    2. Li, Chung-Lun, 1995. "Scheduling to minimize the total resource consumption with a constraint on the sum of completion times," European Journal of Operational Research, Elsevier, vol. 80(2), pages 381-388, January.
    3. R. G. Vickson, 1980. "Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine," Operations Research, INFORMS, vol. 28(5), pages 1155-1167, October.
    4. Awi Federgruen & Gur Mosheiov, 1993. "Simultaneous optimization of efficiency and performance balance measures in single‐machine scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 951-970, December.
    5. Nicholas G. Hall & Wieslaw Kubiak & Suresh P. Sethi, 1991. "Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 847-856, October.
    6. Janiak, Adam, 1991. "Single machine scheduling problem with a common deadline and resource dependent release dates," European Journal of Operational Research, Elsevier, vol. 53(3), pages 317-325, August.
    7. Kenneth R. Baker & Gary D. Scudder, 1990. "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, INFORMS, vol. 38(1), pages 22-36, February.
    8. Nicholas G. Hall & Marc E. Posner, 1991. "Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 836-846, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yiyo Kuo & Sheng-I Chen & Yen-Hung Yeh, 2020. "Single machine scheduling with sequence-dependent setup times and delayed precedence constraints," Operational Research, Springer, vol. 20(2), pages 927-942, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ventura, Jose A. & Kim, Daecheol & Garriga, Frederic, 2002. "Single machine earliness-tardiness scheduling with resource-dependent release dates," European Journal of Operational Research, Elsevier, vol. 142(1), pages 52-69, October.
    2. Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
    3. X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
    4. Dvir Shabtay & George Steiner, 2008. "The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times," Annals of Operations Research, Springer, vol. 159(1), pages 25-40, March.
    5. Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
    6. Li, Y. & Ip, W. H. & Wang, D. W., 1998. "Genetic algorithm approach to earliness and tardiness production scheduling and planning problem," International Journal of Production Economics, Elsevier, vol. 54(1), pages 65-76, January.
    7. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    8. Ali Kordmostafapour & Javad Rezaeian & Iraj Mahdavi & Mahdi Yar Farjad, 2022. "Scheduling unrelated parallel machine problem with multi-mode processing times and batch delivery cost," OPSEARCH, Springer;Operational Research Society of India, vol. 59(4), pages 1438-1470, December.
    9. Cai, X. & Lum, V. Y. S. & Chan, J. M. T., 1997. "Scheduling about a common due date with kob-dependent asymmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 98(1), pages 154-168, April.
    10. Kerem Bülbül & Safia Kedad-Sidhoum & Halil Şen, 2019. "Single-machine common due date total earliness/tardiness scheduling with machine unavailability," Journal of Scheduling, Springer, vol. 22(5), pages 543-565, October.
    11. Mosheiov, Gur & Shadmon, Michal, 2001. "Minmax earliness-tardiness costs with unit processing time jobs," European Journal of Operational Research, Elsevier, vol. 130(3), pages 638-652, May.
    12. Ramon Alvarez-Valdes & Enric Crespo & Jose Tamarit & Fulgencia Villa, 2012. "Minimizing weighted earliness–tardiness on a single machine with a common due date using quadratic models," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 20(3), pages 754-767, October.
    13. Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
    14. Chen, Zhi-Long, 1996. "Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs," European Journal of Operational Research, Elsevier, vol. 93(1), pages 49-60, August.
    15. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    16. Francis Sourd, 2009. "New Exact Algorithms for One-Machine Earliness-Tardiness Scheduling," INFORMS Journal on Computing, INFORMS, vol. 21(1), pages 167-175, February.
    17. Mosheiov, Gur, 2004. "Simultaneous minimization of total completion time and total deviation of job completion times," European Journal of Operational Research, Elsevier, vol. 157(2), pages 296-306, September.
    18. Hino, Celso M. & Ronconi, Debora P. & Mendes, Andre B., 2005. "Minimizing earliness and tardiness penalties in a single-machine problem with a common due date," European Journal of Operational Research, Elsevier, vol. 160(1), pages 190-201, January.
    19. Lin, Shih-Wei & Chou, Shuo-Yan & Ying, Kuo-Ching, 2007. "A sequential exchange approach for minimizing earliness-tardiness penalties of single-machine scheduling with a common due date," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1294-1301, March.
    20. Carrasco, Rodrigo A. & Iyengar, Garud & Stein, Cliff, 2018. "Resource cost aware scheduling," European Journal of Operational Research, Elsevier, vol. 269(2), pages 621-632.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:42:y:1995:i:6:p:949-966. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.