IDEAS home Printed from https://ideas.repec.org/a/wly/jnljam/v2014y2014i1n304808.html

Single Machine Predictive Scheduling Using Inserted Idle Times

Author

Listed:
  • Hongli Zhu
  • Hong Zhou

Abstract

A single machine predictive scheduling problem is considered. The primary objective is to minimize the total completion times. The predictability of the schedule is measured by the completion time deviations between the predictive schedule and realized schedule. The surrogate measure of predictability is chosen to evaluate the completion time deviations. Both of the primary objective and predictability are optimized. In order to absorb the effects of disruptions, the predictive schedule is generated by inserting idle times. Right‐shift rescheduling method is used as the rescheduling strategy. Three methods are designed to construct predictive schedules. The computational experiments show that these algorithms provide high predictability with minor sacrifices in shop performance.

Suggested Citation

  • Hongli Zhu & Hong Zhou, 2014. "Single Machine Predictive Scheduling Using Inserted Idle Times," Journal of Applied Mathematics, John Wiley & Sons, vol. 2014(1).
  • Handle: RePEc:wly:jnljam:v:2014:y:2014:i:1:n:304808
    DOI: 10.1155/2014/304808
    as

    Download full text from publisher

    File URL: https://doi.org/10.1155/2014/304808
    Download Restriction: no

    File URL: https://libkey.io/10.1155/2014/304808?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Deyi Mou & Wanlin Zhao, 2013. "An Irregular Flight Scheduling Model and Algorithm under the Uncertainty Theory," Journal of Applied Mathematics, Hindawi, vol. 2013, pages 1-8, September.
    2. Dirk Briskorn & Joseph Leung & Michael Pinedo, 2011. "Robust scheduling on a single machine using time buffers," IISE Transactions, Taylor & Francis Journals, vol. 43(6), pages 383-398.
    3. Deyi Mou & Wanlin Zhao, 2013. "An Irregular Flight Scheduling Model and Algorithm under the Uncertainty Theory," Journal of Applied Mathematics, John Wiley & Sons, vol. 2013(1).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jin Peng & Bo Zhang & Lin Chen & Hui Li, 2024. "A survey on uncertain graph and uncertain network optimization," Fuzzy Optimization and Decision Making, Springer, vol. 23(1), pages 129-153, March.
    2. Sun, Xuting & Chung, Sai-Ho & Choi, Tsan-Ming & Sheu, Jiuh-Biing & Ma, Hoi Lam, 2020. "Combating lead-time uncertainty in global supply chain's shipment-assignment: Is it wise to be risk-averse?," Transportation Research Part B: Methodological, Elsevier, vol. 138(C), pages 406-434.
    3. Alexander Wyrowski & Nils Boysen & Dirk Briskorn & Stefan Schwerdfeger, 2024. "Public transport crowdshipping: moving shipments among parcel lockers located at public transport stations," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 46(3), pages 873-907, September.
    4. Che, Ada & Feng, Jianguang & Chen, Haoxun & Chu, Chengbin, 2015. "Robust optimization for the cyclic hoist scheduling problem," European Journal of Operational Research, Elsevier, vol. 240(3), pages 627-636.
    5. Giorgi Tadumadze & Nils Boysen & Simon Emde, 2020. "Robust spotter scheduling in trailer yards," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(4), pages 995-1021, December.
    6. Yujie Yuan & Yantao Wang & Xiushan Jiang & Chun Sing Lai, 2024. "An Innovative Multi-Objective Rescheduling System for Mitigating Pandemic Spread in Aviation Networks," Clean Technol., MDPI, vol. 6(1), pages 1-16, January.
    7. Derui Wang & Yanfeng Wu & Jian-Qiang Hu & Miaomiao Liu & Peiwen Yu & Cheng Zhang & Yan Wu, 2019. "Flight Schedule Recovery: A Simulation-Based Approach," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 36(06), pages 1-19, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:jnljam:v:2014:y:2014:i:1:n:304808. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://onlinelibrary.wiley.com/journal/4185 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.