IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v54y2016i4p1061-1075.html
   My bibliography  Save this article

Job sequencing and selection within workload control order release: an assessment by simulation

Author

Listed:
  • Matthias Thürer
  • Mark Stevenson
  • Ting Qu

Abstract

Recent research has highlighted the potential impact of pool sequencing on order release performance but it suffered from two shortcomings. First, arguably the best release solution for workload control in practice combines periodic with continuous release. Although the two types of releases serve different functions, recent work assumed the same sequencing rule should be used for both. Here, the use of different sequencing rules for periodic and continuous releases is evaluated. Using a job-shop simulation, we demonstrate that the rule applied during continuous releases has only a negligible impact on performance. Therefore, jobs can be pulled intermediately from the pool by workers using a more straightforward sequencing rule than the one applied for periodic release. Second, it was assumed that all jobs in the pool are sequenced and then a subset is selected for release. But for some load-oriented sequencing rules, the priority value used for sequencing jobs should be updated after each job selection from the pool. Our simulation results show that although this may improve load balancing at release, it does not in fact improve overall shop performance. Therefore, the greedy heuristic of first sequencing and then selecting jobs can be maintained, which allows the release decision-making process to retain its simplicity. The work has important implications for the use of sequencing rules in practice.

Suggested Citation

  • Matthias Thürer & Mark Stevenson & Ting Qu, 2016. "Job sequencing and selection within workload control order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1061-1075, February.
  • Handle: RePEc:taf:tprsxx:v:54:y:2016:i:4:p:1061-1075
    DOI: 10.1080/00207543.2015.1047978
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2015.1047978
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2015.1047978?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
    2. van Ooijen, H. P. G., 1998. "Delivery performance improvement by controlled work-order release and work-center load balancing," International Journal of Production Economics, Elsevier, vol. 56(1), pages 661-675, September.
    3. Sabuncuoglu, I. & Karapinar, H. Y., 1999. "Analysis of order review/release problems in production systems," International Journal of Production Economics, Elsevier, vol. 62(3), pages 259-279, September.
    4. Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
    5. Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
    6. Fredendall, Lawrence D. & Ojha, Divesh & Wayne Patterson, J., 2010. "Concerning the theory of workload control," European Journal of Operational Research, Elsevier, vol. 201(1), pages 99-111, February.
    7. Zapfel, Gunther & Missbauer, Hubert, 1993. "New concepts for production planning and control," European Journal of Operational Research, Elsevier, vol. 67(3), pages 297-320, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
    2. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    2. Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
    3. Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
    4. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
    5. Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
    6. Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
    7. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
    8. Thürer, Matthias & Land, Martin J. & Stevenson, Mark, 2014. "Card-based workload control for job shops: Improving COBACABANA," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 180-188.
    9. Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
    10. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    11. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    12. Fernandes, Nuno O. & Carmo-Silva, S., 2011. "Workload control under continuous order release," International Journal of Production Economics, Elsevier, vol. 131(1), pages 257-262, May.
    13. Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
    14. Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
    15. Yarong Chen & Hongming Zhou & Peiyu Huang & FuhDer Chou & Shenquan Huang, 2022. "A refined order release method for achieving robustness of non-repetitive dynamic manufacturing system performance," Annals of Operations Research, Springer, vol. 311(1), pages 65-79, April.
    16. Matthias Thürer & Mark Stevenson, 2021. "Material handling and order release control in high-variety make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 14(3), pages 494-506, December.
    17. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
    18. Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
    19. Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
    20. Matthias Thürer & Mark Stevenson, 2016. "Card-based delivery date promising in pure flow shops with order release control," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6798-6811, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:54:y:2016:i:4:p:1061-1075. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.