IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v24y2006i4p339-348.html
   My bibliography  Save this article

Six-sigma as a strategy for process improvement on construction projects: a case study

Author

Listed:
  • Rodney Stewart
  • Clinton Spencer

Abstract

Significant expenditures of time, money and resources, both human and material, are wasted each year as a result of inefficient or non-existent quality management procedures. In an attempt to improve their market competitiveness, by limiting the extent of non-value-adding activities, some organizations are beginning to monitor the performance of internal and external engineering and construction processes. To achieve these bold aims, these organizations are looking to other industries such as manufacturing to examine the effectiveness of measuring and monitoring tools such as six-sigma. Only in recent years has the six-sigma method been utilized by some of the major players in the construction sector. To familiarize both researchers and practitioners on how to implement the six-sigma method and its potential benefits, the paper describes the outcomes of a six-sigma process improvement project (PIP) conducted for the construction of concrete longitudinal beams on the St Pancras raised railway station in London, UK. The outcome of the six-sigma PIP was the improved productivity of beam construction, enhanced interaction between project teams and reduced project delays. Moreover, interviews with key project participants were conducted to determine the success factors, barriers, suitability and advantages of the six-sigma approach compared with other TQM techniqes. In summary, the six-sigma approach provided the PIP team with a structured process improvement strategy to reduce waste and other non-value adding activities from the construction process.

Suggested Citation

  • Rodney Stewart & Clinton Spencer, 2006. "Six-sigma as a strategy for process improvement on construction projects: a case study," Construction Management and Economics, Taylor & Francis Journals, vol. 24(4), pages 339-348.
  • Handle: RePEc:taf:conmgt:v:24:y:2006:i:4:p:339-348
    DOI: 10.1080/01446190500521082
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190500521082
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190500521082?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Raymond Aoieong & S. L. Tang & Syed Ahmed, 2002. "A process approach in measuring quality costs of construction projects: model development," Construction Management and Economics, Taylor & Francis Journals, vol. 20(2), pages 179-192.
    2. Mazin Shammas-Toma & David Seymour & Leslie Clark, 1998. "Obstacles to implementing total quality management in the UK construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 16(2), pages 177-192.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ivars LINDE & Dmitry PHILIPPOV, 2020. "Applying Lean Six Sigma in construction. World practice experience," Access Journal, Access Press Publishing House, vol. 1(2), pages 103-111, September.
    2. Mehmet Tolga Taner, 2013. "Critical Success Factors for Six Sigma Implementation in Large-scale Turkish Construction Companies," International Review of Management and Marketing, Econjournals, vol. 3(4), pages 212-225.
    3. Angels Niñerola & Ramon Ferrer-Rullan & Antoni Vidal-Suñé, 2020. "Climate Change Mitigation: Application of Management Production Philosophies for Energy Saving in Industrial Processes," Sustainability, MDPI, vol. 12(2), pages 1-19, January.
    4. Abdul-Aziz Banawi & Alia Besné & David Fonseca & Jose Ferrandiz, 2020. "A Three Methods Proactive Improvement Model for Buildings Construction Processes," Sustainability, MDPI, vol. 12(10), pages 1-14, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ahmet DEMIR & Mustafa MUKHLIS, 2017. "An Evaluation Of Gated Communities As A Product: An Empirical Study In Sulaimaniyah, Iraq," Theoretical and Empirical Researches in Urban Management, Research Centre in Public Administration and Public Services, Bucharest, Romania, vol. 12(3), pages 63-84, April.
    2. Yehiel Rosenfeld, 2009. "Cost of quality versus cost of non-quality in construction: the crucial balance," Construction Management and Economics, Taylor & Francis Journals, vol. 27(2), pages 107-117.
    3. Markus Hoppe & Avner Engel & Shalom Shachar, 2007. "SysTest: Improving the verification, validation, and testing process— Assessing six industrial pilot projects," Systems Engineering, John Wiley & Sons, vol. 10(4), pages 323-347, December.
    4. Anna Dubois & Lars-Erik Gadde, 2002. "The construction industry as a loosely coupled system: implications for productivity and innovation," Construction Management and Economics, Taylor & Francis Journals, vol. 20(7), pages 621-631.
    5. Shahid Hussain & Zhu Fangwei & Ahmed Faisal Siddiqi & Zaigham Ali & Muhammad Salman Shabbir, 2018. "Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects," Sustainability, MDPI, vol. 10(5), pages 1-25, May.
    6. Lars Huemer & Katarina Östergren, 2000. "Strategic change and organizational learning in two 'Swedish' construction firms," Construction Management and Economics, Taylor & Francis Journals, vol. 18(6), pages 635-642, December.
    7. Mehmet Tolga Taner, 2013. "Critical Success Factors for Six Sigma Implementation in Large-scale Turkish Construction Companies," International Review of Management and Marketing, Econjournals, vol. 3(4), pages 212-225.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:24:y:2006:i:4:p:339-348. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.