This article considers the use of fuzzy logic to support the evaluation of project status. A brief description of fuzzy set theory, fuzzy logic and the process of calculation is given. The major goal of this paper is to present an expert decision-making fuzzy model for evaluating project status. The model results from the application of the Fuzzy Logic Toolbox. This fuzzy model is based on two basic indices, schedule performance index (SPI) and cost performance index (CPI), of earned value management (EVM). The ad- vantage of the fuzzy model is the ability to transform the input indices SPI and CPI into linguistic variables, as well as linguistic evaluation of over- all project status (output). With this approach it is possible to simulate the risk and uncertainty that are always associated with real projects. The scheme of the model, rule block, attributes and their membership functions are mentioned in a case study. The case study contains real data on the development of values of indices SPI and CPI for one project in the field of IT (data file). The analysed project ran from March 2012 to July 2012. The indices SPI and CPI were obtained from control project milestones. There are 5 control milestones in total. The parameters of the model are adjusted on the basis of the data file for each of the variables. The use of fuzzy logic is a particular advantage in decision-making processes where description by algorithms is extremely difficult and criteria are multiplied. || El artículo trata sobre el uso de la lógica difusa como soporte para la evaluación del estado de un proyecto. Se describe brevemente la teoría de conjuntos difusos, la lógica difusa y el proceso de cálculo. El objetivo principal de este trabajo es presentar un modelo difuso para la toma de decisiones por parte de expertos para la evaluación del estado de un proyecto. El modelo es resultado de aplicar la librería de lógica difusa de MATLAB. Este modelo difuso se basa en dos índices básicos, el índice de desempeño de programación (IDP) y el índice de desempeño de costos (IDC), de la gestión del valor ganado (GVG). La ventaja del modelo difuso reside en su capacidad de traducir los índices de entrada IDP e IDC en variables lingüísticas, así como en proporcionar una evaluación lingüística del estado general del proyecto (output). Con este enfoque es posible simular el riesgo y la incertidumbre que siempre está asociado con los proyectos reales. El esquema del modelo, su bloque de reglas, sus atributos y sus funciones de pertenencia, son mencionados en un estudio de caso, el cual contiene datos reales sobre el desarrollo de los valores de los índices IDP e IDC para un proyecto en el ámbito de las TI (archivo de datos). El proyecto analizado duró desde marzo de 2012 hasta julio de 2012. Los índices IDP e IDC se obtuvieron de los hitos del proyecto de control. En total, hay 5 hitos de control. Los parámetros del modelo se ajustan basándose en el archivo de datos para cada una de las variables. El uso de la lógica difusa es una ventaja, especialmente en los procesos de toma de decisiones ya que, en éstos, resulta muy difícil una descripción mediante algoritmos y se multiplican los criterios.
Suggested Citation
Download full text from publisher
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.
More about this item
Keywords
;
;
;
;
;
;
;
;
;
JEL classification:
- C44 - Mathematical and Quantitative Methods - - Econometric and Statistical Methods: Special Topics - - - Operations Research; Statistical Decision Theory
- M19 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Administration - - - Other
- M21 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Economics - - - Business Economics
Statistics
Access and download statistics
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pab:rmcpee:v:19:y:2015:i:1:p:5-23. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Publicación Digital - UPO (email available below). General contact details of provider: https://edirc.repec.org/data/dmupoes.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.