IDEAS home Printed from https://ideas.repec.org/a/ids/ijmore/v1y2009i3p303-325.html
   My bibliography  Save this article

Scheduling of multiple projects with resource transfers

Author

Listed:
  • M.L. Mittal
  • Arun Kanda

Abstract

In organisations, dealing with projects, multiple projects are run simultaneously sharing a common pool of resources. The resources in such a multi-project environment are generally transferred between the projects, consuming significant amounts of both time and cost. In most of the existing models for multi-project planning and scheduling, however, these transfers are implicitly assumed to occur instantaneously with no extra cost. This assumption of instantaneous resource transfers, in most of the practical situations, is not valid and thus may lead to unrealistic schedules. This article is aimed at modelling of these transfers of resources in multi-project scheduling. A generalised model for inter-project resource transfers is presented and an integer linear program is proposed for minimising the penalty/reward for tardy/early projects, and the cost of idleness and transfer of the resources. A heuristic procedure is also developed and computational results are reported.

Suggested Citation

  • M.L. Mittal & Arun Kanda, 2009. "Scheduling of multiple projects with resource transfers," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 1(3), pages 303-325.
  • Handle: RePEc:ids:ijmore:v:1:y:2009:i:3:p:303-325
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=24288
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liu, Ying & Zhou, Jing & Lim, Andrew & Hu, Qian, 2023. "A tree search heuristic for the resource constrained project scheduling problem with transfer times," European Journal of Operational Research, Elsevier, vol. 304(3), pages 939-951.
    2. Adhau, Sunil & Mittal, M.L. & Mittal, Abhinav, 2013. "A multi-agent system for decentralized multi-project scheduling with resource transfers," International Journal of Production Economics, Elsevier, vol. 146(2), pages 646-661.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijmore:v:1:y:2009:i:3:p:303-325. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=320 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.