Optimization of Load Distribution Method for Hydropower Units Based on Output Fluctuation Constraint and Double-Layer Nested Model
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Han, Shuo & Yuan, Yifan & He, Mengjiao & Zhao, Ziwen & Xu, Beibei & Chen, Diyi & Jurasz, Jakub, 2024. "A novel day-ahead scheduling model to unlock hydropower flexibility limited by vibration zones in hydropower-variable renewable energy hybrid system," Applied Energy, Elsevier, vol. 356(C).
- Xianxun Wang & Yadong Mei & Hao Cai & Xiangyu Cong, 2016. "A New Fluctuation Index: Characteristics and Application to Hydro-Wind Systems," Energies, MDPI, vol. 9(2), pages 1-17, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Cheng, Fangjuan & Wang, Pei & Gu, Yifeng & Guo, Jiang & Zhang, Fangqing & Yuan, Fang & Hu, Chunsheng, 2025. "Coordinated scheduling of hydropower units: Risk-aware day-ahead planning and performance-driven intra-day regulation allocation," Energy, Elsevier, vol. 340(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wang, Jin & Zhao, Zhipeng & Zhou, Jinglin & Cheng, Chuntian & Su, Huaying, 2024. "Co-optimization for day-ahead scheduling and flexibility response mode of a hydro–wind–solar hybrid system considering forecast uncertainty of variable renewable energy," Energy, Elsevier, vol. 311(C).
- Jiehong Kong & Igor Iliev & Hans Ivar Skjelbred, 2024. "Including Lifetime Hydraulic Turbine Cost into Short-Term Hybrid Scheduling of Hydro and Solar," Energies, MDPI, vol. 17(21), pages 1-17, October.
- Lai, Chunyang & Kazemtabrizi, Behzad, 2025. "A novel two-stage framework to improve the flexibility of grid connected wind-hydro power system in real-time operation," Applied Energy, Elsevier, vol. 396(C).
- Zida Song & Quan Liu & Zhigen Hu & Chunsheng Zhang & Jinming Ren & Zhexin Wang & Jianhai Tian, 2020. "Construction Diversion Risk Assessment for Hydropower Development on Sediment-Rich Rivers," Energies, MDPI, vol. 13(4), pages 1-20, February.
- Tesfay, Asfafaw Haileselassie & Lia, Leif & Vereide, Kaspar, 2025. "Composite surge tanks to boost hydropower flexibility," Renewable Energy, Elsevier, vol. 251(C).
- Qiao, Liang & Tan, Qiaofeng & Wen, Xin & Wang, Zhenni, 2026. "Complementary scheduling of hydro-wind-PV-storage systems: Addressing flexibility demand for high-penetration variable renewable energy integration," Renewable Energy, Elsevier, vol. 257(C).
- Lin, Fanqi & Zhou, Yanlai & Ning, Zhihao & Liu, Pan & Chang, Fi-John & Xu, Chong-Yu, 2025. "Unlocking hydropower synergies: Multi-objective optimization drawdown operation of cascade reservoirs," Renewable Energy, Elsevier, vol. 247(C).
- Luo, Xiaolin & Huang, Li & Sui, Xin, 2025. "Capacity optimization of existing reservoir hydropower expansion and its impact on power system flexibility," Applied Energy, Elsevier, vol. 377(PD).
- Yan, Min & Huang, Xianfeng & Fang, Guohua & Ding, Ziyu & Li, Xin, 2026. "Assessing the adjustment flexibility of hydropower plant precisely and optimizing its load distribution considering the constraint of flexible margin," Renewable Energy, Elsevier, vol. 256(PD).
- Liu, Suijie & Cao, Sunliang, 2025. "Development of integrated energy sharing systems between neighboring zero-energy buildings via micro-grid and local electric vehicles with energy trading business models," Applied Energy, Elsevier, vol. 380(C).
- Bian, Yifan & Xie, Lirong & Ye, Jiahao & Ma, Lan, 2024. "A new shared energy storage business model for data center clusters considering energy storage degradation," Renewable Energy, Elsevier, vol. 225(C).
- Xiong, Hualin & Egusquiza, Mònica & Alberg Østergaard, Poul & Pérez-Díaz, Juan I. & Sun, Guoxiu & Egusquiza, Eduard & Patelli, Edoardo & Xu, Beibei & Duan, Hongjiang & Chen, Diyi & Luo, Xingqi, 2021. "Multi-objective optimization of a hydro-wind-photovoltaic power complementary plant with a vibration avoidance strategy," Applied Energy, Elsevier, vol. 301(C).
- Wang, Xianxun & Virguez, Edgar & Xiao, Weihua & Mei, Yadong & Patiño-Echeverri, Dalia & Wang, Hao, 2019. "Clustering and dispatching hydro, wind, and photovoltaic power resources with multiobjective optimization of power generation fluctuations: A case study in southwestern China," Energy, Elsevier, vol. 189(C).
- Xinshuo Zhang & Guangwen Ma & Weibin Huang & Shijun Chen & Shuai Zhang, 2018. "Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China," Energies, MDPI, vol. 11(4), pages 1-19, April.
- Amini, Ali & Rey-Mermet, Samuel & Crettenand, Steve & Münch-Alligné, Cécile, 2025. "A hybrid methodology for assessing hydropower plants under flexible operations: Leveraging experimental data and machine learning techniques," Applied Energy, Elsevier, vol. 383(C).
- Wang, He & Tan, Xiaoqiang & Lu, Xueding & Zhu, Zhiwei & Xu, Rongli & Liu, Xiaobing & Wang, Zhengwei & Li, Chaoshun, 2024. "Quantitative evaluation and optimization of synergistic regulation performance considering wear in short-term response of hybrid pumped storage systems," Renewable Energy, Elsevier, vol. 237(PA).
- Cagatay Cebeci & Max Parker & Luis Recalde-Camacho & David Campos-Gaona & Olimpo Anaya-Lara, 2025. "Variable-Speed Hydropower Control and Ancillary Services: A Remedy for Enhancing Grid Stability and Flexibility," Energies, MDPI, vol. 18(3), pages 1-35, January.
- Zhou, Manguo & Zhang, Kaiming & Liu, Xiangwan & Ma, Fan, 2025. "Data-assisted coordinated robust optimization method for urban water-power systems," Applied Energy, Elsevier, vol. 388(C).
- Wang, Xianxun & Mei, Yadong & Kong, Yanjun & Lin, Yuru & Wang, Hao, 2017. "Improved multi-objective model and analysis of the coordinated operation of a hydro-wind-photovoltaic system," Energy, Elsevier, vol. 134(C), pages 813-839.
- Jiang, Jianhua & Ming, Bo & Yu, Ting & Huang, Qiang & Jurasz, Jakub & Liu, Pan & Yu, Miao & Cheng, Long, 2025. "A two-stage framework for sizing renewable capacity in a hydro–photovoltaic–wind–pumped storage hybrid system," Energy, Elsevier, vol. 334(C).
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:12:y:2024:i:5:p:662-:d:1345080. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager The email address of this maintainer does not seem to be valid anymore. Please ask MDPI Indexing Manager to update the entry or send us the correct address (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.
Printed from https://ideas.repec.org/a/gam/jmathe/v12y2024i5p662-d1345080.html