IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v12y2024i3p436-d1329090.html
   My bibliography  Save this article

Optimal Different Due-Date Assignment Scheduling with Group Technology and Resource Allocation

Author

Listed:
  • Xuyin Wang

    (Business School, Northwest Normal University, Lanzhou 730070, China)

  • Weiguo Liu

    (Business School, Northwest Normal University, Lanzhou 730070, China)

Abstract

In this paper, we consider different due-date assignment scheduling with group technology and resource allocation on a single machine, where the due date of each job may be different. Under constant processing times, the objective function is to minimize the scheduling cost (i.e., the weighted sum of earliness, tardiness, and due-date assignment cost, where the weights are position dependent). Under some optimal properties, we prove that this problem can be solved in O ( ζ log ζ ) time, where ζ is the number of jobs. The problem is also extended to cases which include linear and convex functions of the quantity of resource allocation. The objective function is minimizing the sum of the scheduling cost and the resource-consumption cost. For the special case of linear and convex functions, we show that the problem is polynomially solvable in O ( ζ 3 ) time.

Suggested Citation

  • Xuyin Wang & Weiguo Liu, 2024. "Optimal Different Due-Date Assignment Scheduling with Group Technology and Resource Allocation," Mathematics, MDPI, vol. 12(3), pages 1-17, January.
  • Handle: RePEc:gam:jmathe:v:12:y:2024:i:3:p:436-:d:1329090
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/12/3/436/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/12/3/436/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ying Chen & Xiaole Ma & Guiqing Zhang & Yongxi Cheng, 2023. "On optimal due date assignment without restriction and resource allocation in group technology scheduling," Journal of Combinatorial Optimization, Springer, vol. 45(2), pages 1-19, March.
    2. Phosavanh, Johnson & Oron, Daniel, 2024. "Two-agent single-machine scheduling with a rate-modifying activity," European Journal of Operational Research, Elsevier, vol. 312(3), pages 866-876.
    3. Yi-Chun Wang & Ji-Bo Wang, 2023. "Study on Convex Resource Allocation Scheduling with a Time-Dependent Learning Effect," Mathematics, MDPI, vol. 11(14), pages 1-20, July.
    4. Vitaly A. Strusevich & Kabir Rustogi, 2017. "Scheduling with Time-Changing Effects and Rate-Modifying Activities," International Series in Operations Research and Management Science, Springer, number 978-3-319-39574-6, September.
    5. Clyde L. Monma & Alexander Schrijver & Michael J. Todd & Victor K. Wei, 1990. "Convex Resource Allocation Problems on Directed Acyclic Graphs: Duality, Complexity, Special Cases, and Extensions," Mathematics of Operations Research, INFORMS, vol. 15(4), pages 736-748, November.
    6. Lei Pan & Xinyu Sun & Ji-Bo Wang & Li-Han Zhang & Dan-Yang Lv, 2023. "Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs," Journal of Combinatorial Optimization, Springer, vol. 45(4), pages 1-16, May.
    7. Yedidsion, Liron & Shabtay, Dvir, 2017. "The resource dependent assignment problem with a convex agent cost function," European Journal of Operational Research, Elsevier, vol. 261(2), pages 486-502.
    8. Scott Webster & Kenneth R. Baker, 1995. "Scheduling Groups of Jobs on a Single Machine," Operations Research, INFORMS, vol. 43(4), pages 692-703, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ming-Hui Li & Dan-Yang Lv & Yuan-Yuan Lu & Ji-Bo Wang, 2024. "Scheduling with Group Technology, Resource Allocation, and Learning Effect Simultaneously," Mathematics, MDPI, vol. 12(7), pages 1-21, March.
    2. Zong-Jun Wei & Li-Yan Wang & Lei Zhang & Ji-Bo Wang & Ershen Wang, 2023. "Single-Machine Maintenance Activity Scheduling with Convex Resource Constraints and Learning Effects," Mathematics, MDPI, vol. 11(16), pages 1-21, August.
    3. Hongyu He & Yanzhi Zhao & Xiaojun Ma & Zheng-Guo Lv & Ji-Bo Wang, 2023. "Branch-and-Bound and Heuristic Algorithms for Group Scheduling with Due-Date Assignment and Resource Allocation," Mathematics, MDPI, vol. 11(23), pages 1-14, November.
    4. Bozorgirad, Mir Abbas & Logendran, Rasaratnam, 2013. "Bi-criteria group scheduling in hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 145(2), pages 599-612.
    5. Lei Pan & Xinyu Sun & Ji-Bo Wang & Li-Han Zhang & Dan-Yang Lv, 2023. "Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs," Journal of Combinatorial Optimization, Springer, vol. 45(4), pages 1-16, May.
    6. Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
    7. Shisheng Li & T.C.E. Cheng & C.T. Ng & Jinjiang Yuan, 2017. "Two‐agent scheduling on a single sequential and compatible batching machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 64(8), pages 628-641, December.
    8. Cheng, T. C. Edwin & Janiak, Adam & Kovalyov, Mikhail Y., 2001. "Single machine batch scheduling with resource dependent setup and processing times," European Journal of Operational Research, Elsevier, vol. 135(1), pages 177-183, November.
    9. Yunqiang Yin & Doudou Li & Dujuan Wang & T. C. E. Cheng, 2021. "Single-machine serial-batch delivery scheduling with two competing agents and due date assignment," Annals of Operations Research, Springer, vol. 298(1), pages 497-523, March.
    10. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    11. Shahvari, Omid & Logendran, Rasaratnam, 2016. "Hybrid flow shop batching and scheduling with a bi-criteria objective," International Journal of Production Economics, Elsevier, vol. 179(C), pages 239-258.
    12. Ciftci, B.B., 2009. "A cooperative approach to sequencing and connection problems," Other publications TiSEM b0f08a17-4734-4d57-ad66-f, Tilburg University, School of Economics and Management.
    13. Li, Shisheng & Ng, C.T. & Cheng, T.C.E. & Yuan, Jinjiang, 2011. "Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 210(3), pages 482-488, May.
    14. Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
    15. Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
    16. Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
    17. Rubing Chen & Jinjiang Yuan, 2020. "Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices," 4OR, Springer, vol. 18(2), pages 177-196, June.
    18. T.C.E. Cheng & B.M.T. Lin & A. Toker, 2000. "Makespan minimization in the two‐machine flowshop batch scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(2), pages 128-144, March.
    19. Wang, Guoqing & Cheng, T. C. Edwin, 2000. "Parallel machine scheduling with batch delivery costs," International Journal of Production Economics, Elsevier, vol. 68(2), pages 177-183, November.
    20. Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:12:y:2024:i:3:p:436-:d:1329090. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.