IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v18y2025i15p3983-d1710133.html
   My bibliography  Save this article

Research on Long-Term Scheduling Optimization of Water–Wind–Solar Multi-Energy Complementary System Based on DDPG

Author

Listed:
  • Zixing Wan

    (Hubei Technology Innovation Center for Smart Hydropower, Wuhan 430000, China
    School of Electrical Engineering and New Energy, China Three Gorges University, Yichang 443002, China)

  • Wenwu Li

    (Hubei Technology Innovation Center for Smart Hydropower, Wuhan 430000, China
    School of Electrical Engineering and New Energy, China Three Gorges University, Yichang 443002, China)

  • Mu He

    (School of Electrical Engineering and New Energy, China Three Gorges University, Yichang 443002, China)

  • Taotao Zhang

    (Hubei Technology Innovation Center for Smart Hydropower, Wuhan 430000, China
    China Yangtze Power Co., Ltd., Yichang 443000, China)

  • Shengzhe Chen

    (Science and Technology Research Institute, China Three Gorges Corporation, Beijing 101117, China)

  • Weiwei Guan

    (China Yangtze Power Co., Ltd., Yichang 443000, China)

  • Xiaojun Hua

    (China Yangtze Power Co., Ltd., Yichang 443000, China)

  • Shang Zheng

    (Three Gorges Renewables Offshore Wind Power Operation and Maintenance Jiangsu Co., Ltd., Yancheng 224000, China)

Abstract

To address the challenges of high complexity in modeling the correlation of multi-dimensional stochastic variables and the difficulty of solving long-term scheduling models in continuous action spaces in multi-energy complementary systems, this paper proposes a long-term optimization scheduling method based on Deep Deterministic Policy Gradient (DDPG). First, an improved C-Vine Copula model is used to construct the multi-dimensional joint probability distribution of water, wind, and solar energy, and Latin Hypercube Sampling (LHS) is employed to generate a large number of water–wind–solar coupling scenarios, effectively reducing the model’s complexity. Then, a long-term optimization scheduling model is established with the goal of maximizing the absorption of clean energy, and it is converted into a Markov Decision Process (MDP). Next, the DDPG algorithm is employed with a noise dynamic adjustment mechanism to optimize the policy in continuous action spaces, yielding the optimal long-term scheduling strategy for the water–wind–solar multi-energy complementary system. Finally, using a water–wind–solar integrated energy base as a case study, comparative analysis demonstrates that the proposed method can improve the renewable energy absorption capacity and the system’s power generation efficiency by accurately quantifying the uncertainties of water, wind, and solar energy and precisely controlling the continuous action space during the scheduling process.

Suggested Citation

  • Zixing Wan & Wenwu Li & Mu He & Taotao Zhang & Shengzhe Chen & Weiwei Guan & Xiaojun Hua & Shang Zheng, 2025. "Research on Long-Term Scheduling Optimization of Water–Wind–Solar Multi-Energy Complementary System Based on DDPG," Energies, MDPI, vol. 18(15), pages 1-20, July.
  • Handle: RePEc:gam:jeners:v:18:y:2025:i:15:p:3983-:d:1710133
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/18/15/3983/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/18/15/3983/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Li, He & Liu, Pan & Guo, Shenglian & Cheng, Lei & Huang, Kangdi & Feng, Maoyuan & He, Shaokun & Ming, Bo, 2021. "Deriving adaptive long-term complementary operating rules for a large-scale hydro-photovoltaic hybrid power plant using ensemble Kalman filter," Applied Energy, Elsevier, vol. 301(C).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Jin & Zhao, Zhipeng & Zhou, Jinglin & Cheng, Chuntian & Su, Huaying, 2024. "Developing operating rules for a hydro–wind–solar hybrid system considering peak-shaving demands," Applied Energy, Elsevier, vol. 360(C).
    2. Jiang, Jianhua & Ming, Bo & Liu, Pan & Huang, Qiang & Guo, Yi & Chang, Jianxia & Zhang, Wei, 2023. "Refining long-term operation of large hydro–photovoltaic–wind hybrid systems by nesting response functions," Renewable Energy, Elsevier, vol. 204(C), pages 359-371.
    3. Yang, Zhikai & Liu, Pan & Xia, Qian & Li, He & Cheng, Qian & Cheng, Lei, 2024. "Operating rules for hydro-photovoltaic systems: A variance-based sensitivity analysis," Applied Energy, Elsevier, vol. 372(C).
    4. Jing, Zhiqiang & Wang, Yimin & Chang, Jianxia & Wang, Xuebin & Zhou, Yong & Li, Liang & Tian, Yuyu, 2024. "Benefit compensation of hydropower-wind-photovoltaic complementary operation in the large clean energy base," Applied Energy, Elsevier, vol. 354(PA).
    5. Lu, Na & Wang, Guangyan & Su, Chengguo & Ren, Zaimin & Peng, Xiaoyue & Sui, Quan, 2024. "Medium- and long-term interval optimal scheduling of cascade hydropower-photovoltaic complementary systems considering multiple uncertainties," Applied Energy, Elsevier, vol. 353(PA).
    6. Li, He & Liu, Pan & Guo, Shenglian & Zuo, Qiting & Cheng, Lei & Tao, Jie & Huang, Kangdi & Yang, Zhikai & Han, Dongyang & Ming, Bo, 2022. "Integrating teleconnection factors into long-term complementary operating rules for hybrid power systems: A case study of Longyangxia hydro-photovoltaic plant in China," Renewable Energy, Elsevier, vol. 186(C), pages 517-534.
    7. Ding, Ziyu & Fang, Guohua & Wen, Xin & Tan, Qiaofeng & Mao, Yingchi & Zhang, Yu, 2024. "Long-term operation rules of a hydro–wind–photovoltaic hybrid system considering forecast information," Energy, Elsevier, vol. 288(C).
    8. Barnam Jyoti Saharia & Raman Jee Pandey & Avik Ghosh & Nabin Sarmah, 2025. "Comparative study of metaheuristic algorithms for the optimal sizing of hybrid renewable energy system for a rural hamlet in Nagaland, North East India," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 16(3), pages 949-985, March.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2025:i:15:p:3983-:d:1710133. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.