Author
Listed:
- Zhang, Bojian
- Zhao, Jun
- D’Ariano, Andrea
- Zhang, Yongxiang
- Feng, Tao
- Peng, Qiyuan
Abstract
In a railway shunting yard, the transformation of inbound trains into properly composed outbound trains is a complex task because it involves decisions of multiple operations processes. This study addresses the integrated optimization of hump sequencing, train makeup, and classification track assignment problem in a railway shunting yard. Several key practical yard operation constraints are considered, including train formulation constraints, hump sequencing constraints, and limitations of the maximum number and capacity of classification tracks. By introducing a new representation of block flow, the integrated problem, which adopts the extended single-stage strategy and the train-to-track policy, is formulated as a unified 0-1 integer linear programming model. The objective of the proposed model is to minimize the weighted-sum of the total dwell time of all railcars and the formulation deviation penalties of all outbound trains. Then, an iterative two-phase decomposition approach is developed to reduce the complexity of solving the integrated problem. The first phase aims to explore all feasible humping sequences using a Branch-and-Bound (B&B) algorithm. Each time a new humping sequence is generated in the first phase, the second phase containing a Branch-and-Price (B&P) algorithm is applied to solve the integrated train makeup and classification track assignment problem with the known humping sequence found in the first phase. In addition, greedy heuristics and lower bounding techniques are designed in both phases to improve computational efficiency. Comprehensive experiments are investigated based on a set of real-life instances. The results show that exact approaches provide optimal solutions, whereas heuristic approaches yield satisfactory solutions within a shorter computation time. Moreover, sensitivity analyses on the number of classification tracks and the effects of different deviation penalties are also performed to gain more managerial insights.
Suggested Citation
Zhang, Bojian & Zhao, Jun & D’Ariano, Andrea & Zhang, Yongxiang & Feng, Tao & Peng, Qiyuan, 2024.
"An iterative method for integrated hump sequencing, train makeup, and classification track assignment in railway shunting yard,"
Transportation Research Part B: Methodological, Elsevier, vol. 190(C).
Handle:
RePEc:eee:transb:v:190:y:2024:i:c:s019126152400211x
DOI: 10.1016/j.trb.2024.103087
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transb:v:190:y:2024:i:c:s019126152400211x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/548/description#description .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.