IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v147y2014ipap30-37.html
   My bibliography  Save this article

Make-to-stock policies for a multistage serial system under a make-to-order production environment

Author

Listed:
  • Morikawa, Katsumi
  • Takahashi, Katsuhiko
  • Hirotani, Daisuke

Abstract

Production control policies for a make-to-order manufacturing system composed of several stages under uncertain demand are considered. Conducting order-specific operations at each stage can produce a variety of final products from the same raw material. The production quantity per period at a stage depends on the workload. To shorten lead times, it is permitted to start production at upstream stages without confirmed orders, hold semi-finished items within the system as make-to-stock, and then match orders to these items under the constraints of specifications and quantities. Eight make-to-stock policies are prepared by combining buffer selection rules, matching acceptance rules, and make-to-stock replenishment rules. Their performance is evaluated via computer simulation. In the case of relatively limited capacity, aggressively matching orders to make-to-stock items are preferable in terms of the average lateness of orders and the average inventory level of the make-to-stock items. A policy that loads carefully to avoid undesirable processing delay by calculating the workload and considers the planned order quantities explicitly obtain better results under increased production capacity.

Suggested Citation

  • Morikawa, Katsumi & Takahashi, Katsuhiko & Hirotani, Daisuke, 2014. "Make-to-stock policies for a multistage serial system under a make-to-order production environment," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 30-37.
  • Handle: RePEc:eee:proeco:v:147:y:2014:i:pa:p:30-37
    DOI: 10.1016/j.ijpe.2013.02.016
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527313000832
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2013.02.016?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hubert Missbauer & Reha Uzsoy, 2011. "Optimization Models of Production Planning Problems," International Series in Operations Research & Management Science, in: Karl G. Kempf & Pınar Keskinocak & Reha Uzsoy (ed.), Planning Production and Inventories in the Extended Enterprise, chapter 0, pages 437-507, Springer.
    2. Brian Denton & Diwakar Gupta & Keith Jawahir, 2003. "Managing Increasing Product Variety at Integrated Steel Mills," Interfaces, INFORMS, vol. 33(2), pages 41-53, April.
    3. Jayant R. Kalagnanam & Milind W. Dawande & Mark Trumbo & Ho Soo Lee, 2000. "The Surplus Inventory Matching Problem in the Process Industry," Operations Research, INFORMS, vol. 48(4), pages 505-516, August.
    4. Milind Dawande & Jayant Kalagnanam & Ho Soo Lee & Chandra Reddy & Stuart Siegel & Mark Trumbo, 2004. "The Slab-Design Problem in the Steel Industry," Interfaces, INFORMS, vol. 34(3), pages 215-225, June.
    5. Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
    6. Stephen C. Graves, 1986. "A Tactical Planning Model for a Job Shop," Operations Research, INFORMS, vol. 34(4), pages 522-533, August.
    7. P A Huegler & J C Hartman, 2007. "Fulfilling orders for steel plates from existing inventory," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(9), pages 1156-1166, September.
    8. Zijm, W. H. M. & Buitenhek, R., 1996. "Capacity planning and lead time management," International Journal of Production Economics, Elsevier, vol. 46(1), pages 165-179, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Latifa Benhamou & Pierre Féniès & Vincent Giard, 2020. "Avantages Potentiels Du Reverse Blending Sur La Chaine Logistique De L'Industrie Des Engrais," Post-Print hal-03005688, HAL.
    2. Ke Ma & Lichuan Wang & Yan Chen, 2017. "A Collaborative Cloud Service Platform for Realizing Sustainable Make-To-Order Apparel Supply Chain," Sustainability, MDPI, vol. 10(1), pages 1-21, December.
    3. Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
    4. Fernandes, Nuno O. & Silva, Cristóvão & Carmo-Silva, S., 2015. "Order release in the hybrid MTO–FTO production," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 513-520.
    5. Katsumi Morikawa & Katsuhiko Takahashi & Daisuke Hirotani, 2018. "Performance evaluation of candidate appointment schedules using clearing functions," Journal of Intelligent Manufacturing, Springer, vol. 29(3), pages 509-518, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Milind Dawande & Jayant Kalagnanam & Ho Soo Lee & Chandra Reddy & Stuart Siegel & Mark Trumbo, 2004. "The Slab-Design Problem in the Steel Industry," Interfaces, INFORMS, vol. 34(3), pages 215-225, June.
    2. Lixin Tang & Gongshu Wang & Zhi-Long Chen, 2014. "Integrated Charge Batching and Casting Width Selection at Baosteel," Operations Research, INFORMS, vol. 62(4), pages 772-787, August.
    3. Wikner, Joakim & Naim, Mohamed M. & Spiegler, Virginia L.M. & Lin, Junyi, 2017. "IOBPCS based models and decoupling thinking," International Journal of Production Economics, Elsevier, vol. 194(C), pages 153-166.
    4. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
    5. Fernandes, Nuno O. & Silva, Cristóvão & Carmo-Silva, S., 2015. "Order release in the hybrid MTO–FTO production," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 513-520.
    6. Ghadimi, Foad & Aouam, Tarik & Haeussler, Stefan & Uzsoy, Reha, 2022. "Integrated and hierarchical systems for coordinating order acceptance and release planning," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1277-1289.
    7. Haeussler, Stefan & Missbauer, Hubert, 2014. "Empirical validation of meta-models of work centres in order release planning," International Journal of Production Economics, Elsevier, vol. 149(C), pages 102-116.
    8. As'ad, Rami & Demirli, Kudret, 2010. "Production scheduling in steel rolling mills with demand substitution: Rolling horizon implementation and approximations," International Journal of Production Economics, Elsevier, vol. 126(2), pages 361-369, August.
    9. Gahm, Christian & Uzunoglu, Aykut & Wahl, Stefan & Ganschinietz, Chantal & Tuma, Axel, 2022. "Applying machine learning for the anticipation of complex nesting solutions in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 296(3), pages 819-836.
    10. Peter J. H. Hulshof & Martijn R. K. Mes & Richard J. Boucherie & Erwin W. Hans, 2016. "Patient admission planning using Approximate Dynamic Programming," Flexible Services and Manufacturing Journal, Springer, vol. 28(1), pages 30-61, June.
    11. Kefeli, Ali & Uzsoy, Reha & Fathi, Yahya & Kay, Michael, 2011. "Using a mathematical programming model to examine the marginal price of capacitated resources," International Journal of Production Economics, Elsevier, vol. 131(1), pages 383-391, May.
    12. Jalali, Hamed & Carmen, Raïsa & Van Nieuwenhuyse, Inneke & Boute, Robert, 2019. "Quality and pricing decisions in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 272(1), pages 195-206.
    13. Delasay, Mohammad & Ingolfsson, Armann & Kolfal, Bora & Schultz, Kenneth, 2019. "Load effect on service times," European Journal of Operational Research, Elsevier, vol. 279(3), pages 673-686.
    14. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    15. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    16. Zhiming Shi & Yisong Li & Gábor Bohács & Qiang Zhou, 2022. "A Study on Optimal Location Selection and Semi-Finished Product Inventory Allocation in the Steel Industry," Sustainability, MDPI, vol. 14(22), pages 1-21, November.
    17. Zanoni, Simone & Zavanella, Lucio, 2005. "Model and analysis of integrated production-inventory system: The case of steel production," International Journal of Production Economics, Elsevier, vol. 93(1), pages 197-205, January.
    18. Laszlo Ladanyi & Jon Lee & Robin Lougee-Heimer, 2005. "Rapid Prototyping of Optimization Algorithms Using COIN-OR: A Case Study Involving the Cutting-Stock Problem," Annals of Operations Research, Springer, vol. 139(1), pages 243-265, October.
    19. Manda, A.B. & Uzsoy, Reha, 2021. "Managing product transitions with learning and congestion effects," International Journal of Production Economics, Elsevier, vol. 239(C).
    20. Bjorn P. Berg & Brian T. Denton, 2017. "Fast Approximation Methods for Online Scheduling of Outpatient Procedure Centers," INFORMS Journal on Computing, INFORMS, vol. 29(4), pages 631-644, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:147:y:2014:i:pa:p:30-37. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.