IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v123y2010i1p31-41.html
   My bibliography  Save this article

Integrated component scheduling models for chip shooter machines

Author

Listed:
  • Ho, William
  • Ji, Ping

Abstract

This paper focuses on minimizing printed circuit board (PCB) assembly time for a chip shooter machine, which has a movable feeder carrier holding components, a movable X-Y table carrying a PCB, and a rotary turret with multiple assembly heads. The assembly time of the machine depends on two inter-related optimization problems: the component sequencing problem and the feeder arrangement problem. Nevertheless, they were often regarded as two individual problems and solved separately. This paper proposes two complete mathematical models for the integrated problem of the machine. The models are verified by two commercial packages. Finally, a hybrid genetic algorithm previously developed by the authors is presented to solve the model. The algorithm not only generates the optimal solutions quickly for small-sized problems, but also outperforms the genetic algorithms developed by other researchers in terms of total assembly time.

Suggested Citation

  • Ho, William & Ji, Ping, 2010. "Integrated component scheduling models for chip shooter machines," International Journal of Production Economics, Elsevier, vol. 123(1), pages 31-41, January.
  • Handle: RePEc:eee:proeco:v:123:y:2010:i:1:p:31-41
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00246-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lova, Antonio & Tormos, Pilar & Cervantes, Mariamar & Barber, Federico, 2009. "An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes," International Journal of Production Economics, Elsevier, vol. 117(2), pages 302-316, February.
    2. Klomp, Cornelis & van de Klundert, Joris & Spieksma, Frits C. R. & Voogt, Siem, 2000. "The feeder rack assignment problem in PCB assembly: A case study," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 399-407, March.
    3. Aristides Dikos & Peter Nelson & Thomas Tirpak & Weihsin Wang, 1997. "Optimization of high-mix printed circuit card assembly using genetic algorithms," Annals of Operations Research, Springer, vol. 75(0), pages 303-324, January.
    4. Crama, Yves & Flippo, Olaf E. & van de Klundert, Joris & Spieksma, Frits C. R., 1997. "The assembly of printed circuit boards: A case with multiple machines and multiple board types," European Journal of Operational Research, Elsevier, vol. 98(3), pages 457-472, May.
    5. Altinkemer, Kemal & Kazaz, Burak & Koksalan, Murat & Moskowitz, Herbert, 2000. "Optimization of printed circuit board manufacturing: Integrated modeling and algorithms," European Journal of Operational Research, Elsevier, vol. 124(2), pages 409-421, July.
    6. Huang, Xiaoxia, 2007. "Optimal project selection with random fuzzy parameters," International Journal of Production Economics, Elsevier, vol. 106(2), pages 513-522, April.
    7. ElMekkawy, T.Y. & Liu, S., 2009. "A new memetic algorithm for optimizing the partitioning problem of tandem AGV systems," International Journal of Production Economics, Elsevier, vol. 118(2), pages 508-520, April.
    8. Farahani, Reza Zanjirani & Elahipanah, Mahsa, 2008. "A genetic algorithm to optimize the total cost and service level for just-in-time distribution in a supply chain," International Journal of Production Economics, Elsevier, vol. 111(2), pages 229-243, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jihee Han & Yoonho Seo, 2017. "Mechanism to minimise the assembly time with feeder assignment for a multi-headed gantry and high-speed SMT machine," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2930-2949, May.
    2. Battaïa, Olga & Dolgui, Alexandre & Guschinsky, Nikolai, 2023. "MIP-based heuristics for combinatorial design of reconfigurable rotary transfer machines for production of multiple parts," International Journal of Production Economics, Elsevier, vol. 262(C).
    3. Ma, N., 2014. "Optimal scope of supply chain network & operations design," Other publications TiSEM e6187708-b664-44bf-aef8-f, Tilburg University, School of Economics and Management.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sun, Dong-Seok & Lee, Tae-Eog & Kim, Kyung-Hoon, 2005. "Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool," International Journal of Production Economics, Elsevier, vol. 95(2), pages 245-264, February.
    2. Ayob, Masri & Kendall, Graham, 2008. "A survey of surface mount device placement machine optimisation: Machine classification," European Journal of Operational Research, Elsevier, vol. 186(3), pages 893-914, May.
    3. Kazaz, Burak & Altinkemer, Kemal, 2003. "Optimization of multi-feeder (depot) printed circuit board manufacturing with error guarantees," European Journal of Operational Research, Elsevier, vol. 150(2), pages 370-394, October.
    4. Ilkyeong Moon & Sanghyup Lee & Moonsoo Shin & Kwangyeol Ryu, 2016. "Evolutionary resource assignment for workload-based production scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(2), pages 375-388, April.
    5. Luis F. Machado-Domínguez & Carlos D. Paternina-Arboleda & Jorge I. Vélez & Agustin Barrios-Sarmiento, 2021. "A memetic algorithm to address the multi-node resource-constrained project scheduling problem," Journal of Scheduling, Springer, vol. 24(4), pages 413-429, August.
    6. Len Vandenheede & Mario Vanhoucke & Broos Maenhout, 2016. "A scatter search for the extended resource renting problem," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4723-4743, August.
    7. Kadri, Roubila Lilia & Boctor, Fayez F., 2018. "An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case," European Journal of Operational Research, Elsevier, vol. 265(2), pages 454-462.
    8. Ateme-Nguema, Barthélemy & Dao, Thiên-My, 2009. "Quantized Hopfield networks and tabu search for manufacturing cell formation problems," International Journal of Production Economics, Elsevier, vol. 121(1), pages 88-98, September.
    9. Cédric Verbeeck & Vincent Peteghem & Mario Vanhoucke & Pieter Vansteenwegen & El-Houssaine Aghezzaf, 2017. "A metaheuristic solution approach for the time-constrained project scheduling problem," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 353-371, March.
    10. F. Perez & T. Gomez, 2016. "Multiobjective project portfolio selection with fuzzy constraints," Annals of Operations Research, Springer, vol. 245(1), pages 7-29, October.
    11. Gopalakrishnan, Kavitha & Yusuf, Yahaya Y. & Musa, Ahmed & Abubakar, Tijjani & Ambursa, Hafsat M., 2012. "Sustainable supply chain management: A case study of British Aerospace (BAe) Systems," International Journal of Production Economics, Elsevier, vol. 140(1), pages 193-203.
    12. Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
    13. Choudhury, Nilanjan D. & Wilhelm, Wilbert E. & Rao, Brijesh & Gott, Jonathan & Khotekar, Nikhilesh, 2007. "Process planning for circuit card assembly on a series of dual head placement machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 626-639, October.
    14. Van Peteghem, Vincent & Vanhoucke, Mario, 2014. "An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances," European Journal of Operational Research, Elsevier, vol. 235(1), pages 62-72.
    15. Charles, Vincent & Kumar, Mukesh & Irene Kavitha, S., 2012. "Measuring the efficiency of assembled printed circuit boards with undesirable outputs using data envelopment analysis," International Journal of Production Economics, Elsevier, vol. 136(1), pages 194-206.
    16. Roychaudhuri, Pritam Sankar & Kazantzi, Vasiliki & Foo, Dominic C.Y. & Tan, Raymond R. & Bandyopadhyay, Santanu, 2017. "Selection of energy conservation projects through Financial Pinch Analysis," Energy, Elsevier, vol. 138(C), pages 602-615.
    17. Alfredo S. Ramos & Pablo A. Miranda-Gonzalez & Samuel Nucamendi-Guillén & Elias Olivares-Benitez, 2023. "A Formulation for the Stochastic Multi-Mode Resource-Constrained Project Scheduling Problem Solved with a Multi-Start Iterated Local Search Metaheuristic," Mathematics, MDPI, vol. 11(2), pages 1-25, January.
    18. Julia Chuzhoy & Rafail Ostrovsky & Yuval Rabani, 2006. "Approximation Algorithms for the Job Interval Selection Problem and Related Scheduling Problems," Mathematics of Operations Research, INFORMS, vol. 31(4), pages 730-738, November.
    19. Tamás Bányai & Béla Illés & Miklós Gubán & Ákos Gubán & Fabian Schenk & Ágota Bányai, 2019. "Optimization of Just-In-Sequence Supply: A Flower Pollination Algorithm-Based Approach," Sustainability, MDPI, vol. 11(14), pages 1-26, July.
    20. V. Van Peteghem & M. Vanhoucke, 2009. "Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 09/595, Ghent University, Faculty of Economics and Business Administration.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:123:y:2010:i:1:p:31-41. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.