IDEAS home Printed from https://ideas.repec.org/a/zbw/kdijep/227659.html
   My bibliography  Save this article

Robust Contract Conditions Under the Newly Introduced BTO-rs Scheme: Application to an Urban Railway Project

Author

Listed:
  • Kim, Kangsoo

Abstract

Few studies have specifically focused on the uncertainty of demand forecasting despite the fact that uncertainty is the one of greatest risks for governments and private partners in PPP projects. This study presents a methodology for finding robust contract conditions considering uncertainty in travel demand forecasting in a PPP project. Through a case study of an urban railway PPP project in Korea, this study uncovered the risk of excessive government payments to private partners due to the uncertainty in contracted forecast ridership levels. The results allow the suggestion that robust contract conditions could reduce the expected total level of government payments and lower user fees while maintaining profitability of the project. This study offers a framework that assists contract negotiators and gives them more information regarding financial risks and vulnerabilities and helps them to quantify the likelihood of these vulnerabilities coming into play during PPP projects.

Suggested Citation

  • Kim, Kangsoo, 2020. "Robust Contract Conditions Under the Newly Introduced BTO-rs Scheme: Application to an Urban Railway Project," KDI Journal of Economic Policy, Korea Development Institute (KDI), vol. 42(4), pages 117-138.
  • Handle: RePEc:zbw:kdijep:227659
    DOI: 10.23895/kdijep.2020.42.4.117
    as

    Download full text from publisher

    File URL: https://www.econstor.eu/bitstream/10419/227659/1/jep-42-4-5.pdf
    Download Restriction: no

    File URL: https://libkey.io/10.23895/kdijep.2020.42.4.117?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Bowe, Michael & Lee, Ding Lun, 2004. "Project evaluation in the presence of multiple embedded real options: evidence from the Taiwan High-Speed Rail Project," Journal of Asian Economics, Elsevier, vol. 15(1), pages 71-98, February.
    2. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    3. Yang, Hai & Meng, Qiang, 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 207-222, April.
    4. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    5. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying & Zhang, Shuai-Jun, 2016. "Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 466-491.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    2. Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
    3. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    4. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    5. Lu, Zhaoyang & Meng, Qiang, 2023. "Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts," Transportation Research Part B: Methodological, Elsevier, vol. 172(C), pages 71-92.
    6. Zhao, Yunpeng & Song, Jinbo & Feng, Zhuo & Jin, Lulu, 2023. "Incentive contracts with demand guarantee in BOT toll road projects," Research in Transportation Economics, Elsevier, vol. 98(C).
    7. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    8. Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
    9. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
    10. Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
    11. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    12. Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
    13. Tan, Zhijia & Yang, Hai & Tan, Wei & Li, Zhichun, 2016. "Pareto-improving transportation network design and ownership regimes," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 292-309.
    14. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    15. Meng Xu & Guangmin Wang & Susan Grant-Muller & Ziyou Gao, 2017. "Joint road toll pricing and capacity development in discrete transport network design problem," Transportation, Springer, vol. 44(4), pages 731-752, July.
    16. Kang, Chao-Chung & Lee, Tsun-Siou & Huang, Szu-Chi, 2013. "Royalty bargaining in Public–Private Partnership projects: Insights from a theoretic three-stage game auction model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 59(C), pages 1-14.
    17. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying & Zhang, Shuai-Jun, 2016. "Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 466-491.
    18. Sang, Jinyan & Li, Zhi-Chun & Lam, William H.K. & Wong, S.C., 2019. "Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population," Transportation Research Part B: Methodological, Elsevier, vol. 130(C), pages 36-66.
    19. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    20. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.

    More about this item

    Keywords

    PPP; BTO-rs; Contract Conditions; Robustness; Uncertainty; Forecast; Ridership;
    All these keywords.

    JEL classification:

    • R42 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Transportation Economics - - - Government and Private Investment Analysis; Road Maintenance; Transportation Planning
    • R40 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Transportation Economics - - - General

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:zbw:kdijep:227659. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ZBW - Leibniz Information Centre for Economics (email available below). General contact details of provider: https://edirc.repec.org/data/kdiiikr.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.