IDEAS home Printed from https://ideas.repec.org/a/eee/transb/v152y2021icp65-86.html
   My bibliography  Save this article

Optimal build-operate-transfer road contracts under information asymmetry and uncertainty

Author

Listed:
  • Shi, Shasha
  • Yin, Yafeng
  • An, Qingxian
  • Chen, Ke

Abstract

This study investigates optimal build-operate-transfer (BOT) contracts for toll roads under asymmetric and uncertain information concerning the construction cost of a private firm. In such a contract, the choice of toll, capacity and subsidy is made as a function of the marginal construction cost, reported by the firm, to maximize the expected social welfare, while ensuring that the firm has incentive to participate and no incentive to misreport the cost. By investigating the properties of the optimal contract, we find that enticing the firm to report its information truthfully will increase the optimal volume/capacity ratio of the BOT road. It also causes a loss in social welfare. However, a higher extent of information asymmetry will not necessarily yield greater loss in social welfare, and the effect of the extent of information asymmetry on welfare loss differs when it follows different probability distributions. We also show that the effects of information asymmetry and uncertainty on the BOT contract are amplified by each other. Nevertheless, the welfare loss is not necessarily amplified.

Suggested Citation

  • Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
  • Handle: RePEc:eee:transb:v:152:y:2021:i:c:p:65-86
    DOI: 10.1016/j.trb.2021.08.005
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0191261521001491
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.trb.2021.08.005?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Tan, Zhijia & Yang, Hai & Guo, Xiaolei, 2010. "Properties of Pareto-efficient contracts and regulations for road franchising," Transportation Research Part B: Methodological, Elsevier, vol. 44(4), pages 415-433, May.
    2. Li, Shuai & Cai, Hubo, 2017. "Government incentive impacts on private investment behaviors under demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 115-129.
    3. Ginés de Rus & Manuel Romero, 2004. "Private financing of roads and optimal pricing: Is it possible to get both?," The Annals of Regional Science, Springer;Western Regional Science Association, vol. 38(3), pages 485-497, September.
    4. Myerson, Roger B, 1979. "Incentive Compatibility and the Bargaining Problem," Econometrica, Econometric Society, vol. 47(1), pages 61-73, January.
    5. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    6. Wang, Shuaian & Meng, Qiang & Liu, Zhiyuan, 2013. "Fundamental properties of volume–capacity ratio of a private toll road in general networks," Transportation Research Part B: Methodological, Elsevier, vol. 47(C), pages 77-86.
    7. Lu, Zhaoyang & Meng, Qiang, 2018. "Impacts of pavement deterioration and maintenance cost on Pareto-efficient contracts for highway franchising," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 113(C), pages 1-21.
    8. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying, 2015. "Modeling the impact of government guarantees on toll charge, road quality and capacity for Build-Operate-Transfer (BOT) road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 78(C), pages 54-67.
    9. Auriol, Emmanuelle & Picard, Pierre M., 2013. "A theory of BOT concession contracts," Journal of Economic Behavior & Organization, Elsevier, vol. 89(C), pages 187-209.
    10. Engel, Eduardo & Fischer, Ronald & Galetovic, Alexander, 2018. "The joy of flying: Efficient airport PPP contracts," Transportation Research Part B: Methodological, Elsevier, vol. 114(C), pages 131-146.
    11. Ouyang, Yanfeng & Madanat, Samer, 2004. "Optimal scheduling of rehabilitation activities for multiple pavement facilities: exact and approximate solutions," Transportation Research Part A: Policy and Practice, Elsevier, vol. 38(5), pages 347-365, June.
    12. Baron, David P & Myerson, Roger B, 1982. "Regulating a Monopolist with Unknown Costs," Econometrica, Econometric Society, vol. 50(4), pages 911-930, July.
    13. Fu, Xinying & van den Berg, Vincent A.C. & Verhoef, Erik T., 2018. "Private road supply in networks with heterogeneous users," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 430-443.
    14. Elisabetta Iossa & David Martimort, 2012. "Risk allocation and the costs and benefits of public--private partnerships," RAND Journal of Economics, RAND Corporation, vol. 43(3), pages 442-474, September.
    15. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
    16. Xu, Guangye & Dan, Bin & Zhang, Xumei & Liu, Can, 2014. "Coordinating a dual-channel supply chain with risk-averse under a two-way revenue sharing contract," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 171-179.
    17. Eduardo M. R. A. Engel & Ronald D. Fischer & Alexander Galetovic, 2001. "Least-Present-Value-of-Revenue Auctions and Highway Franchising," Journal of Political Economy, University of Chicago Press, vol. 109(5), pages 993-1020, October.
    18. Iossa, Elisabetta & Martimort, David, 2016. "Corruption in PPPs, incentives and contract incompleteness," International Journal of Industrial Organization, Elsevier, vol. 44(C), pages 85-100.
    19. Xiao, Feng & Yang, Hai & Han, Deren, 2007. "Competition and efficiency of private toll roads," Transportation Research Part B: Methodological, Elsevier, vol. 41(3), pages 292-308, March.
    20. Lim, Wei Shi, 2000. "A lemons market? An incentive scheme to induce truth-telling in third party logistics providers," European Journal of Operational Research, Elsevier, vol. 125(3), pages 519-525, September.
    21. Engel, Eduardo & Fischer, Ronald & Galetovic, Alexander, 1997. "Highway Franchising: Pitfalls and Opportunities," American Economic Review, American Economic Association, vol. 87(2), pages 68-72, May.
    22. Julian M. Alston & Brian H. Hurd, 1990. "Some Neglected Social Costs of Government Spending in Farm Programs," American Journal of Agricultural Economics, Agricultural and Applied Economics Association, vol. 72(1), pages 149-156.
    23. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    24. Wang, Grace W.Y. & Pallis, Athanasios A., 2014. "Incentive approaches to overcome moral hazard in port concession agreements," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 67(C), pages 162-174.
    25. Fu, Xinying & van den Berg, Vincent A.C. & Verhoef, Erik T., 2018. "Private road networks with uncertain demand," Research in Transportation Economics, Elsevier, vol. 70(C), pages 57-68.
    26. Wu, Di & Yin, Yafeng & Yang, Hai, 2011. "The independence of volume-capacity ratio of private toll roads in general networks," Transportation Research Part B: Methodological, Elsevier, vol. 45(1), pages 96-101, January.
    27. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
    28. Qinghua Li & Bo Li & Ping Chen & Pengwen Hou, 2017. "Dual-channel supply chain decisions under asymmetric information with a risk-averse retailer," Annals of Operations Research, Springer, vol. 257(1), pages 423-447, October.
    29. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    30. Qiu, Larry D. & Wang, Susheng, 2011. "BOT projects: Incentives and efficiency," Journal of Development Economics, Elsevier, vol. 94(1), pages 127-138, January.
    31. Choi, Tsan-Ming & Li, Duan & Yan, Houmin, 2008. "Mean-variance analysis of a single supplier and retailer supply chain under a returns policy," European Journal of Operational Research, Elsevier, vol. 184(1), pages 356-376, January.
    32. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    33. Chen, Anthony & Subprasom, Kitti, 2007. "Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty," Transportation Research Part A: Policy and Practice, Elsevier, vol. 41(6), pages 537-558, July.
    34. repec:bri:cmpowp:13/325 is not listed on IDEAS
    35. Wang, Yinglin & Gao, Huaizhu Oliver & Liu, Jicai, 2019. "Incentive game of investor speculation in PPP highway projects based on the government minimum revenue guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 125(C), pages 20-34.
    36. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    37. Jan A. Van Mieghem, 2003. "Commissioned Paper: Capacity Management, Investment, and Hedging: Review and Recent Developments," Manufacturing & Service Operations Management, INFORMS, vol. 5(4), pages 269-302, July.
    38. Levy, H & Markowtiz, H M, 1979. "Approximating Expected Utility by a Function of Mean and Variance," American Economic Review, American Economic Association, vol. 69(3), pages 308-317, June.
    39. Ballard, Charles L & Shoven, John B & Whalley, John, 1985. "General Equilibrium Computations of the Marginal Welfare Costs of Taxes in the United States," American Economic Review, American Economic Association, vol. 75(1), pages 128-138, March.
    40. Choi, Tsan-Ming & Wen, Xin & Sun, Xuting & Chung, Sai-Ho, 2019. "The mean-variance approach for global supply chain risk analysis with air logistics in the blockchain technology era," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 127(C), pages 178-191.
    41. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    2. Ivona Ivić & Anita Cerić, 2023. "Risks Caused by Information Asymmetry in Construction Projects: A Systematic Literature Review," Sustainability, MDPI, vol. 15(13), pages 1-25, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
    2. Lu, Zhaoyang & Meng, Qiang, 2023. "Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts," Transportation Research Part B: Methodological, Elsevier, vol. 172(C), pages 71-92.
    3. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    4. Zhao, Yunpeng & Song, Jinbo & Feng, Zhuo & Jin, Lulu, 2023. "Incentive contracts with demand guarantee in BOT toll road projects," Research in Transportation Economics, Elsevier, vol. 98(C).
    5. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    6. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    7. Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
    8. Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
    9. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    10. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    11. Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
    12. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    13. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    14. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying & Zhang, Shuai-Jun, 2016. "Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 466-491.
    15. Li, Shuai & Cai, Hubo, 2017. "Government incentive impacts on private investment behaviors under demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 115-129.
    16. Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
    17. Yin, Yafeng & Guo, Xiaolei, 2016. "Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost informationAuthor-Name: Shi, Shasha," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 56-69.
    18. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    19. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
    20. Chen, Zhiyuan & Sun, Shaobo & Li, Jianbin & Zhang, Langlang & Fan, Hao, 2022. "Optimal BOT contracts in a two-road transportation network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transb:v:152:y:2021:i:c:p:65-86. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/548/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.