IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v81-82y2003i1p415-429.html
   My bibliography  Save this article

The detailed coordination problem in a two-level assembly system with stochastic lead times

Author

Listed:
  • Tang, Ou
  • Grubbstrom, Robert W.

Abstract

No abstract is available for this item.

Suggested Citation

  • Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
  • Handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:415-429
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00296-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
    2. Ranga V. Ramasesh & J. Keith Ord & Jack C. Hayya & Andrew Pan, 1991. "Sole Versus Dual Sourcing in Stochastic Lead-Time (s, Q) Inventory Models," Management Science, INFORMS, vol. 37(4), pages 428-443, April.
    3. Ramasesh, Ranga V., 1991. "Procurement under uncertain supply lead times -- A dual- sourcing technique could save costs," Engineering Costs and Production Economics, Elsevier, vol. 21(1), pages 59-68, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. repec:dau:papers:123456789/3720 is not listed on IDEAS
    2. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    3. Chauhan, Satyaveer S. & Dolgui, Alexandre & Proth, Jean-Marie, 2009. "A continuous model for supply planning of assembly systems with stochastic component procurement times," International Journal of Production Economics, Elsevier, vol. 120(2), pages 411-417, August.
    4. Sadok Turki & Stanislav Didukh & Christophe Sauvey & Nidhal Rezg, 2017. "Optimization and Analysis of a Manufacturing–Remanufacturing–Transport–Warehousing System within a Closed-Loop Supply Chain," Sustainability, MDPI, vol. 9(4), pages 1-20, April.
    5. Tang, Ou & Grubbstrom, Robert W., 2005. "Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns," International Journal of Production Economics, Elsevier, vol. 93(1), pages 285-300, January.
    6. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    7. Carole Camisullis & Vincent Giard & Gisele Mendy-Bilek, 2010. "The causes and determination of safety stocks in upstream supply chains for mass production of customized products," Working Papers hal-00876995, HAL.
    8. Carole Camisullis & Vincent Giard, 2010. "Détermination des stocks de sécurité dans une chaîne logistique-amont dédiée à une production de masse de produits fortement diversifiés," Working Papers hal-00876986, HAL.
    9. Xu Guan & Guo Li & Zhe Yin, 2016. "The implication of time-based payment contract in the decentralized assembly system," Annals of Operations Research, Springer, vol. 240(2), pages 641-659, May.
    10. Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
    11. Louly, Mohamed-Aly & Dolgui, Alexandre, 2012. "A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 140(2), pages 778-781.
    12. Yin, Zhe & Wang, Chen & Yin, Qian, 2018. "Coordinating overseas and local sourcing through a capacitated expediting transportation policy," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 258-271.
    13. Van Nyen, Pieter L. M. & Van Ooijen, Henny P. G. & Bertrand, J.W.M.J. Will M., 2004. "Simulation results on the performance of Albin and Whitt's estimation method for waiting times in integrated production-inventory systems," International Journal of Production Economics, Elsevier, vol. 90(2), pages 237-249, July.
    14. repec:dau:papers:123456789/3718 is not listed on IDEAS
    15. Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Tang, Ou & Grubbstrom, Robert W., 2005. "Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns," International Journal of Production Economics, Elsevier, vol. 93(1), pages 285-300, January.
    2. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
    3. Boulaksil, Youssef, 2016. "Safety stock placement in supply chains with demand forecast updates," Operations Research Perspectives, Elsevier, vol. 3(C), pages 27-31.
    4. Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik, 2003. "A model to evaluate inventory costs in a remanufacturing environment," International Journal of Production Economics, Elsevier, vol. 81(1), pages 597-607, January.
    5. Xin X. He & Susan H. Xu & J. Keith Ord & Jack C. Hayya, 1998. "An Inventory Model with Order Crossover," Operations Research, INFORMS, vol. 46(3-supplem), pages 112-119, June.
    6. Kamran Moinzadeh & Steven Nahmias, 2000. "Adjustment Strategies for a Fixed Delivery Contract," Operations Research, INFORMS, vol. 48(3), pages 408-423, June.
    7. Paul Glasserman & Yashan Wang, 1998. "Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems," Operations Research, INFORMS, vol. 46(6), pages 858-871, December.
    8. Reimann, Marc, 2011. "Speculative production and anticipative reservation of reactive capacity by a multi-product newsvendor," European Journal of Operational Research, Elsevier, vol. 211(1), pages 35-46, May.
    9. Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
    10. Kim, Bowon, 2000. "Coordinating an innovation in supply chain management," European Journal of Operational Research, Elsevier, vol. 123(3), pages 568-584, June.
    11. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    12. Riezebos, Jan & Zhu, Stuart X., 2020. "Inventory control with seasonality of lead times," Omega, Elsevier, vol. 92(C).
    13. Meena, P.L. & Sarmah, S.P., 2013. "Multiple sourcing under supplier failure risk and quantity discount: A genetic algorithm approach," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 50(C), pages 84-97.
    14. Fu, Ke & Xu, Jiayan & Miao, Zhaowei, 2013. "Newsvendor with multiple options of expediting," European Journal of Operational Research, Elsevier, vol. 226(1), pages 94-99.
    15. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    16. Chi Chiang & W. C. Benton, 1994. "Sole sourcing versus dual sourcing under stochastic demands and lead times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(5), pages 609-624, August.
    17. Milne, R. John & Mahapatra, Santosh & Wang, Chi-Tai, 2015. "Optimizing planned lead times for enhancing performance of MRP systems," International Journal of Production Economics, Elsevier, vol. 167(C), pages 220-231.
    18. Kim, Taebok & Glock, Christoph H. & Kwon, Yongjang, 2014. "A closed-loop supply chain for deteriorating products under stochastic container return times," Omega, Elsevier, vol. 43(C), pages 30-40.
    19. Vincent Giard & Mustapha Sali, 2012. "Pilotage d'une chaîne logistique par une approche de type MRP dans un environnement partiellement aléatoire," Working Papers hal-00875497, HAL.
    20. Gérard P. Cachon & Fuqiang Zhang, 2006. "Procuring Fast Delivery: Sole Sourcing with Information Asymmetry," Management Science, INFORMS, vol. 52(6), pages 881-896, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:415-429. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.