IDEAS home Printed from https://ideas.repec.org/a/eee/transe/v118y2018icp258-271.html
   My bibliography  Save this article

Coordinating overseas and local sourcing through a capacitated expediting transportation policy

Author

Listed:
  • Yin, Zhe
  • Wang, Chen
  • Yin, Qian

Abstract

We consider an assembly system that adopts both overseas sourcing and local sourcing for different components. Local sourcing has a short and deterministic lead-time. Overseas sourcing can be divided into two stages and each stage has uncertain transportation duration. A capacitated expediting service could be adopted after first-stage transportation. In this study, we derive an optimal expediting policy for overseas sourcing and an optimal responsive sourcing policy for local sourcing. In addition, we discuss the impacts of lead-time volatility and the decision of safety lead-time, which are relevant in implementing the expediting service.

Suggested Citation

  • Yin, Zhe & Wang, Chen & Yin, Qian, 2018. "Coordinating overseas and local sourcing through a capacitated expediting transportation policy," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 258-271.
  • Handle: RePEc:eee:transe:v:118:y:2018:i:c:p:258-271
    DOI: 10.1016/j.tre.2018.08.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S1366554518300929
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.tre.2018.08.003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Liu, Songsong & Papageorgiou, Lazaros G., 2013. "Multiobjective optimisation of production, distribution and capacity planning of global supply chains in the process industry," Omega, Elsevier, vol. 41(2), pages 369-382.
    2. Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
    3. Aditya Jain & Harry Groenevelt & Nils Rudi, 2010. "Continuous Review Inventory Model with Dynamic Choice of Two Freight Modes with Fixed Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 120-139, August.
    4. Chiwon Kim & Diego Klabjan & David Simchi-Levi, 2015. "Optimal Expediting Policies for a Serial Inventory System with Stochastic Lead Time," Production and Operations Management, Production and Operations Management Society, vol. 24(10), pages 1524-1536, October.
    5. Lucy Gongtao Chen & Ding Ding & Jihong Ou, 2014. "Power Structure and Profitability in Assembly Supply Chains," Production and Operations Management, Production and Operations Management Society, vol. 23(9), pages 1599-1616, September.
    6. Lichun Chen & Elise Miller-Hooks, 2012. "Resilience: An Indicator of Recovery Capability in Intermodal Freight Transport," Transportation Science, INFORMS, vol. 46(1), pages 109-123, February.
    7. Cui, Jianxun & Zhao, Meng & Li, Xiaopeng & Parsafard, Mohsen & An, Shi, 2016. "Reliable design of an integrated supply chain with expedited shipments under disruption risks," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 95(C), pages 143-163.
    8. Fu, Ke & Xu, Jiayan & Miao, Zhaowei, 2013. "Newsvendor with multiple options of expediting," European Journal of Operational Research, Elsevier, vol. 226(1), pages 94-99.
    9. John Foreman & Jérémie Gallien & Julie Alspaugh & Fernando Lopez & Rohit Bhatnagar & Chee Chong Teo & Charles Dubois, 2010. "Implementing Supply-Routing Optimization in a Make-to-Order Manufacturing Network," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 547-568, August.
    10. Ke Fu & Vernon N. Hsu & Chung-Yee Lee, 2009. "Note--Optimal Component Acquisition for a Single-Product, Single-Demand Assemble-to-Order Problem with Expediting," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 229-236, December.
    11. Wenting Pan & Kut C. So, 2010. "TECHNICAL NOTE---Optimal Product Pricing and Component Production Quantities for an Assembly System Under Supply Uncertainty," Operations Research, INFORMS, vol. 58(6), pages 1792-1797, December.
    12. Chengbin Chu & Jean‐Marie Proth & Xiaolan Xie, 1993. "Supply management in assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(7), pages 933-949, December.
    13. Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
    14. Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
    15. Fei Lv & Shihua Ma & Xu Guan, 2015. "The implication of capacity reservation contracts in assembly system with asymmetric demand information," International Journal of Production Research, Taylor & Francis Journals, vol. 53(18), pages 5564-5591, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Maheswar Singh Mahapatra & Pravash Chandra Pradhan & J. K. Jha, 2022. "Sourcing decisions with order allocation under supply disruption risk considering quantitative and qualitative criteria," Operational Research, Springer, vol. 22(4), pages 3291-3333, September.
    2. Lv, Fei & Xiao, Lei & Xu, Minghui & Guan, Xu, 2019. "Quantity-payment versus two-part tariff contracts in an assembly system with asymmetric cost information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 129(C), pages 60-80.
    3. Li, Ying & Shou, Yongyi & Ding, Ronggui & Sun, Tao & Zhou, Qing, 2019. "Governing local sourcing practices of overseas projects for the Belt and Road Initiative: A framework and evaluation," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 126(C), pages 212-226.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
    2. Guo Li & Lin Li & Mengqi Liu & Suresh P. Sethi, 2020. "Impact of power structures in a subcontracting assembly system," Annals of Operations Research, Springer, vol. 291(1), pages 475-498, August.
    3. Guo Li & Hui Mao & Lei Xiao, 2017. "Impacts of Leader–Follower Structure on Pricing and Production Strategies in a Decentralized Assembly System," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(01), pages 1-24, February.
    4. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    5. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    6. Höller, Simon J. & Özsen, Raik & Thonemann, Ulrich W., 2020. "Determining optimal parameters for expediting policies under service level constraints," European Journal of Operational Research, Elsevier, vol. 281(2), pages 274-285.
    7. Li, Yanhai & Ou, Jinwen, 2020. "Optimal ordering policy for complementary components with partial backordering and emergency replenishment under spectral risk measure," European Journal of Operational Research, Elsevier, vol. 284(2), pages 538-549.
    8. Lv, Fei & Xiao, Lei & Xu, Minghui & Guan, Xu, 2019. "Quantity-payment versus two-part tariff contracts in an assembly system with asymmetric cost information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 129(C), pages 60-80.
    9. Jabbarzadeh, Armin & Azad, Nader & Verma, Manish, 2020. "An optimization approach to planning rail hazmat shipments in the presence of random disruptions," Omega, Elsevier, vol. 96(C).
    10. Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
    11. Zahraei, Seyed Mehdi & Teo, Chee-Chong, 2017. "Optimizing a supply network with production smoothing, freight expediting and safety stocks: An analysis of tactical trade-offs," European Journal of Operational Research, Elsevier, vol. 262(1), pages 75-88.
    12. Liao, Yi & Shen, Wenjing & Hu, Xinxin & Yang, Shilei, 2014. "Optimal responses to stockouts: Lateral transshipment versus emergency order policies," Omega, Elsevier, vol. 49(C), pages 79-92.
    13. El Mehdi, Er Raqabi & Ilyas, Himmich & Nizar, El Hachemi & Issmaïl, El Hallaoui & François, Soumis, 2023. "Incremental LNS framework for integrated production, inventory, and vessel scheduling: Application to a global supply chain," Omega, Elsevier, vol. 116(C).
    14. Yang, Hui & Chen, Jing & Chen, Xu & Chen, Bintong, 2017. "The impact of customer returns in a supply chain with a common retailer," European Journal of Operational Research, Elsevier, vol. 256(1), pages 139-150.
    15. Ho-Yin Mak & Zuo-Jun Max Shen, 2014. "Pooling and Dependence of Demand and Yield in Multiple-Location Inventory Systems," Manufacturing & Service Operations Management, INFORMS, vol. 16(2), pages 263-269, May.
    16. Trucco, Paolo & Petrenj, Boris, 2023. "Characterisation of resilience metrics in full-scale applications to interdependent infrastructure systems," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
    17. Borodin, Valeria & Dolgui, Alexandre & Hnaien, Faicel & Labadie, Nacima, 2016. "Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 79-86.
    18. Carole Camisullis & Vincent Giard, 2010. "Détermination des stocks de sécurité dans une chaîne logistique-amont dédiée à une production de masse de produits fortement diversifiés," Working Papers hal-00876986, HAL.
    19. Fan, Jianchang & Ni, Debing & Fang, Xiang, 2020. "Liability cost sharing, product quality choice, and coordination in two-echelon supply chains," European Journal of Operational Research, Elsevier, vol. 284(2), pages 514-537.
    20. Maiyar, Lohithaksha M. & Thakkar, Jitesh J., 2019. "Modelling and analysis of intermodal food grain transportation under hub disruption towards sustainability," International Journal of Production Economics, Elsevier, vol. 217(C), pages 281-297.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transe:v:118:y:2018:i:c:p:258-271. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/600244/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.