IDEAS home Printed from https://ideas.repec.org/r/ems/eureri/1786.html

Simple heuristics for push and pull remanufacturing policies

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. is not listed on IDEAS
  2. Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
  3. Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
  4. Zolfagharinia, Hossein & Hafezi, Maryam & Farahani, Reza Zanjirani & Fahimnia, Behnam, 2014. "A hybrid two-stock inventory control model for a reverse supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 67(C), pages 141-161.
  5. Hamza Boudhar & Mohammed Dahane & Nidhal Rezg, 2017. "New dynamic heuristic for the optimization of opportunities to use new and remanufactured spare part in stochastic degradation context," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 437-454, February.
  6. Huynh, Candice H. & So, Kut C. & Gurnani, Haresh, 2016. "Managing a closed-loop supply system with random returns and a cyclic delivery schedule," European Journal of Operational Research, Elsevier, vol. 255(3), pages 787-796.
  7. Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
  8. Feng, Yan & Viswanathan, S., 2014. "Heuristics with guaranteed performance bounds for a manufacturing system with product recovery," European Journal of Operational Research, Elsevier, vol. 232(2), pages 322-329.
  9. Hsueh, Che-Fu, 2011. "An inventory control model with consideration of remanufacturing and product life cycle," International Journal of Production Economics, Elsevier, vol. 133(2), pages 645-652, October.
  10. Ramani, Vinay & De Giovanni, Pietro, 2017. "A two-period model of product cannibalization in an atypical Closed-loop Supply Chain with endogenous returns: The case of DellReconnect," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1009-1027.
  11. Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
  12. Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
  13. Lin, Junyi & Zhou, Li & Spiegler, Virginia L.M. & Naim, Mohamed M. & Syntetos, Aris, 2022. "Push or Pull? The impact of ordering policy choice on the dynamics of a hybrid closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 300(1), pages 282-295.
  14. Kaya, Onur, 2010. "Incentive and production decisions for remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 201(2), pages 442-453, March.
  15. Mathijn Retel Helmrich & Raf Jans & Wilco van den Heuvel & Albert Wagelmans, 2014. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," IISE Transactions, Taylor & Francis Journals, vol. 46(1), pages 67-86.
  16. Emre Nadar & Mustafa Akan & Laurens Debo & Alan Scheller-Wolf, 2023. "Technical Note—Optimal Procurement in Remanufacturing Systems with Uncertain Used-Item Condition," Operations Research, INFORMS, vol. 71(5), pages 1441-1453, September.
  17. Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
  18. Babai, M. Zied & Syntetos, Aris A. & Teunter, Ruud H., 2026. "Fifty years of inventory research from a forecasting perspective," European Journal of Operational Research, Elsevier, vol. 331(1), pages 1-20.
  19. Vercraene, Samuel & Gayon, Jean-Philippe & Flapper, Simme Douwe, 2014. "Coordination of manufacturing, remanufacturing and returns acceptance in hybrid manufacturing/remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 148(C), pages 62-70.
  20. Fei Zhang & Zailin Guan & Li Zhang & Yanyan Cui & Pengxing Yi & Saif Ullah, 2019. "Inventory management for a remanufacture-to-order production with multi-components (parts)," Journal of Intelligent Manufacturing, Springer, vol. 30(1), pages 59-78, January.
  21. Poles, Roberto, 2013. "System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies," International Journal of Production Economics, Elsevier, vol. 144(1), pages 189-199.
  22. Haolan Liao & Qianwang Deng & Yuanrui Wang, 2017. "Optimal Acquisition and Production Policy for End-of-Life Engineering Machinery Recovering in a Joint Manufacturing/Remanufacturing System under Uncertainties in Procurement and Demand," Sustainability, MDPI, vol. 9(3), pages 1-19, February.
  23. Mabel C. Chou & Chee-Khian Sim & Xue-Ming Yuan, 2020. "Policies for inventory models with product returns forecast from past demands and past sales," Annals of Operations Research, Springer, vol. 288(1), pages 137-180, May.
  24. Dev, Navin K. & Shankar, Ravi & Choudhary, Alok, 2017. "Strategic design for inventory and production planning in closed-loop hybrid systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 345-353.
  25. Mohammed Dahane & M’hammed Sahnoun & Belgacem Bettayeb & David Baudry & Hamza Boudhar, 2017. "Impact of spare parts remanufacturing on the operation and maintenance performance of offshore wind turbines: a multi-agent approach," Journal of Intelligent Manufacturing, Springer, vol. 28(7), pages 1531-1549, October.
  26. Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.