A Practical and Accurate Alternative to PERT

In: Perspectives in Modern Project Scheduling

Author

Listed:
  • Bajis Dodin

    (University of California)

Abstract

Many real world projects can be represented by stochastic activity network (SAN) models, where the duration of some or all of the project activities are, at best, known in probabilistic sense. These models are known in the literature as PERT networks and they are analyzed using the PERT procedure. It has been known for many years that the Project Evaluation and Review Technique (PERT) provides inaccurate information about the project completion time. Quite often this inaccuracy is large enough to render such estimates as not helpful. As a result of this inaccuracy, many improvements since the introduction of PERT in 1959 have been developed. However, in spite of this inaccuracy and the many improvements, PERT procedure continues to be taught and presented in most text books on Project Management. This is due, perhaps, to its simplicity, and ease of its application. In this paper a new alternative is developed that addresses the issues of accuracy and practicality simultaneously in analyzing SAN models. The new procedure is based on a more accurate representation of the distribution function of the project completion time. We first show that the project completion time can in certain instances be accurately represented by a normal distribution, but in many other instances it can not. In these other instances we show that the project completion time can be more accurately represented by an extreme value distribution. Hence, SAN is first characterized as to when we can use the normal distribution and when we can use extreme value distribution. In the first case, PERT estimates are accurate and will be used; however, in the second case a new procedure is developed that is easy to use, and results in more accurate estimates of the project completion time and its statistics. In this paper examples are also provided that illustrate the above characterization of SANs and the accuracy and practicality of the new procedure.

Suggested Citation

  • Bajis Dodin, 2006. "A Practical and Accurate Alternative to PERT," International Series in Operations Research & Management Science, in: Joanna Józefowska & Jan Weglarz (ed.), Perspectives in Modern Project Scheduling, chapter 0, pages 3-23, Springer.
  • Handle: RePEc:spr:isochp:978-0-387-33768-5_1
    DOI: 10.1007/978-0-387-33768-5_1
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Patoghi, Amirhosein & Mousavi, Seyed Meysam, 2021. "A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty," Technological Forecasting and Social Change, Elsevier, vol. 173(C).
    2. Li, Haitao & Womer, Norman K., 2015. "Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming," European Journal of Operational Research, Elsevier, vol. 246(1), pages 20-33.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:isochp:978-0-387-33768-5_1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.