IDEAS home Printed from https://ideas.repec.org/h/spr/ihichp/978-3-319-05915-0_23.html
   My bibliography  Save this book chapter

Scheduling of Production with Alternative Process Plans

In: Handbook on Project Management and Scheduling Vol. 2

Author

Listed:
  • Roman Čapek

    (Czech Technical University)

  • Přemysl Šůcha

    (Czech Technical University)

  • Zdeněk Hanzálek

    (Czech Technical University)

Abstract

This chapter deals with a scheduling problem with alternative process plans that was motivated by a production of wire harnesses where certain parts can be processed manually or automatically by different types of machines. Only a subset of all the given activities will form the solution, so the decision whether the activity will appear in the final schedule has to be made during the scheduling process. The problem considered is an extension of the resource constrained project scheduling problem with positive and negative time-lags and sequence dependent setup times. We extend the classic RCPSP problem by a definition of alternative branchings and for this representation of the problem, an mixed integer linear programming model is formulated. Furthermore, a heuristic algorithm based on priority schedule construction with an unscheduling step is proposed for the considered problem and it is used to solve the large instances of the considered problem.

Suggested Citation

  • Roman Čapek & Přemysl Šůcha & Zdeněk Hanzálek, 2015. "Scheduling of Production with Alternative Process Plans," International Handbooks on Information Systems, in: Christoph Schwindt & Jürgen Zimmermann (ed.), Handbook on Project Management and Scheduling Vol. 2, edition 127, chapter 0, pages 1187-1204, Springer.
  • Handle: RePEc:spr:ihichp:978-3-319-05915-0_23
    DOI: 10.1007/978-3-319-05915-0_23
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hartmann, Sönke & Briskorn, Dirk, 2022. "An updated survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 297(1), pages 1-14.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ihichp:978-3-319-05915-0_23. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.