IDEAS home Printed from https://ideas.repec.org/a/vrs/otamic/v16y2024i1p81-92n1007.html
   My bibliography  Save this article

ISM model for assessing critical productivity factors in the Jordanian construction industry post-COVID-19 pandemic

Author

Listed:
  • Alshdiefat Ala’a Saleh

    (Department of Civil Engineering, Faculty of Engineering and Technology, Philadelphia University, Amman, Jordan)

Abstract

The construction industry is a human-intensive industry despite the massive development in technologies. Nowadays, after crossing COVID-19 pandemic, the construction industry is an important sector for saving the national economy. The COVID-19 pandemic has created new ways of thinking due to massive and unpredictable socioeconomic consequences. Thus, understanding the critical productivity factors after the COVID-19 pandemic will enhance the construction industry by improving the understanding of the professionals who are involved at an early stage of the project lifecycle. This study aims to determine the critical productivity factors after the COVID-19 pandemic for enhancing the construction industry in developing countries such as Jordan. A review of available literature similar to the related topics before the COVID-19 pandemic was explored, and then a questionnaire was distributed across the Jordanian construction industry to determine the main productivity factors post-COVID-19 pandemic. A focus group was used to determine the interrelationship among the factors with the Interpretive Structural Modelling (ISM) approach. The obtained results indicated that 22 main productivity factors affected the Jordanian construction industry. The hierarchy of these factors is categorised into six levels of ISM whereas the sixth level has the greatest factors that influence productivity in the construction industry. Thus, enhancing productivity in construction projects requires solving problems related to factors in level 1, which will help to solve problems at the next level and so on.

Suggested Citation

  • Alshdiefat Ala’a Saleh, 2024. "ISM model for assessing critical productivity factors in the Jordanian construction industry post-COVID-19 pandemic," Organization, Technology and Management in Construction, Sciendo, vol. 16(1), pages 81-92.
  • Handle: RePEc:vrs:otamic:v:16:y:2024:i:1:p:81-92:n:1007
    DOI: 10.2478/otmcj-2024-0006
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2024-0006
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2024-0006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Seoyoung Jung & Seulki Lee & Jungho Yu, 2021. "Identification and Prioritization of Critical Success Factors for Off-Site Construction Using ISM and MICMAC Analysis," Sustainability, MDPI, vol. 13(16), pages 1-21, August.
    2. Marina Marinelli & Ashwini Konanahalli & Rupesh Dwarapudi & Mukund Janardhanan, 2022. "Assessment of Barriers and Strategies for the Enhancement of Off-Site Construction in India: An ISM Approach," Sustainability, MDPI, vol. 14(11), pages 1-20, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Alisha Lakra & Shubhkirti Gupta & Ravi Ranjan & Sushanta Tripathy & Deepak Singhal, 2022. "The Significance of Machine Learning in the Manufacturing Sector: An ISM Approach," Logistics, MDPI, vol. 6(4), pages 1-15, October.
    2. Nitad Jaisue & Nipon Ketjoy & Malinee Kaewpanha & Prapita Thanarak, 2023. "The Barriers Analysis for Waste-to-Energy Project Development in Thailand: Using an Interpretive Structural Modeling Approach," Energies, MDPI, vol. 16(4), pages 1-19, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:16:y:2024:i:1:p:81-92:n:1007. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.