Identification and Prioritization of Critical Success Factors for Off-Site Construction Using ISM and MICMAC Analysis
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Wei Pan & Alistair Gibb & Andrew Dainty, 2007. "Perspectives of UK housebuilders on the use of offsite modern methods of construction," Construction Management and Economics, Taylor & Francis Journals, vol. 25(2), pages 183-194.
- Long Li & Zhongfu Li & Guangdong Wu & Xiaodan Li, 2018. "Critical Success Factors for Project Planning and Control in Prefabrication Housing Production: A China Study," Sustainability, MDPI, vol. 10(3), pages 1-17, March.
- Alistair Gibb, 2001. "Standardization and pre-assembly- distinguishing myth from reality using case study research," Construction Management and Economics, Taylor & Francis Journals, vol. 19(3), pages 307-315.
- Nick Blismas & Christine Pasquire & Alistair Gibb, 2006. "Benefit evaluation for off-site production in construction," Construction Management and Economics, Taylor & Francis Journals, vol. 24(2), pages 121-130.
- Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2017. "Factors Affecting the Capital Cost of Prefabrication—A Case Study of China," Sustainability, MDPI, vol. 9(9), pages 1-22, August.
- Lu, Weisheng & Yuan, Hongping, 2013. "Investigating waste reduction potential in the upstream processes of offshore prefabrication construction," Renewable and Sustainable Energy Reviews, Elsevier, vol. 28(C), pages 804-811.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Alshdiefat Ala’a Saleh, 2024. "ISM model for assessing critical productivity factors in the Jordanian construction industry post-COVID-19 pandemic," Organization, Technology and Management in Construction, Sciendo, vol. 16(1), pages 81-92.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Pei Dang & Zhanwen Niu & Shang Gao & Lei Hou & Guomin Zhang, 2020. "Critical Factors Influencing the Sustainable Construction Capability in Prefabrication of Chinese Construction Enterprises," Sustainability, MDPI, vol. 12(21), pages 1-21, October.
- Yu, Sisi & Liu, Yanfeng & Wang, Dengjia & Bahaj, AbuBakr S. & Wu, Yue & Liu, Jiaping, 2021. "Review of thermal and environmental performance of prefabricated buildings: Implications to emission reductions in China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 137(C).
- Craig Langston & Weiwei Zhang, 2021. "DfMA: Towards an Integrated Strategy for a More Productive and Sustainable Construction Industry in Australia," Sustainability, MDPI, vol. 13(16), pages 1-21, August.
- Kaicheng Shen & Chen Cheng & Xiaodong Li & Zhihui Zhang, 2019. "Environmental Cost-Benefit Analysis of Prefabricated Public Housing in Beijing," Sustainability, MDPI, vol. 11(1), pages 1-21, January.
- Ravijanya Chippagiri & Ana Bras & Deepak Sharma & Rahul V. Ralegaonkar, 2022. "Technological and Sustainable Perception on the Advancements of Prefabrication in Construction Industry," Energies, MDPI, vol. 15(20), pages 1-19, October.
- Johan Larsson & Per Erik Eriksson & Thomas Olofsson & Peter Simonsson, 2014. "Industrialized construction in the Swedish infrastructure sector: core elements and barriers," Construction Management and Economics, Taylor & Francis Journals, vol. 32(1-2), pages 83-96, February.
- Yongsheng Jiang & Dong Zhao & Dedong Wang & Yudong Xing, 2019. "Sustainable Performance of Buildings through Modular Prefabrication in the Construction Phase: A Comparative Study," Sustainability, MDPI, vol. 11(20), pages 1-15, October.
- Qianqian Shi & Jianbo Zhu & Marcel Hertogh & Zhaohan Sheng, 2018. "Incentive Mechanism of Prefabrication in Mega Projects with Reputational Concerns," Sustainability, MDPI, vol. 10(4), pages 1-16, April.
- Shengxi Zhang & Zhongfu Li & Shengbin Ma & Long Li & Mengqi Yuan, 2022. "Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China," Sustainability, MDPI, vol. 14(9), pages 1-20, April.
- Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2018. "Capital Cost Optimization for Prefabrication: A Factor Analysis Evaluation Model," Sustainability, MDPI, vol. 10(1), pages 1-22, January.
- Jozef Švajlenka & Mária Kozlovská, 2018. "Perception of User Criteria in the Context of Sustainability of Modern Methods of Construction Based on Wood," Sustainability, MDPI, vol. 10(2), pages 1-17, January.
- Ke Zhang & Jiin-Song Tsai, 2021. "Identification of Critical Factors Influencing Prefabricated Construction Quality and Their Mutual Relationship," Sustainability, MDPI, vol. 13(19), pages 1-21, October.
- Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2017. "Factors Affecting the Capital Cost of Prefabrication—A Case Study of China," Sustainability, MDPI, vol. 9(9), pages 1-22, August.
- Weiping Jiang & Lirong Luo & Zezhou Wu & Jianbo Fei & Maxwell Fordjour Antwi-Afari & Tao Yu, 2019. "An Investigation of the Effectiveness of Prefabrication Incentive Policies in China," Sustainability, MDPI, vol. 11(19), pages 1-24, September.
- Jingyuan Shi & Jiaqing Sun, 2023. "Prefabrication Implementation Potential Evaluation in Rural Housing Based on Entropy Weighted TOPSIS Model: A Case Study of Counties in Chongqing, China," Sustainability, MDPI, vol. 15(6), pages 1-18, March.
- Lei Jiang & Zhongfu Li & Long Li & Tiankun Li & Yunli Gao, 2018. "A Framework of Industrialized Building Assessment in China Based on the Structural Equation Model," IJERPH, MDPI, vol. 15(8), pages 1-20, August.
- Jeong-hoon Lee & Jin-sung Kim & Hak-ju Lee & Young-Min Lee & Hyung-Geun Kim, 2019. "Small-Scale Public Rental Housing Development Using Modular Construction—Lessons learned from Case Studies in Seoul, Korea," Sustainability, MDPI, vol. 11(4), pages 1-18, February.
- Akinade, Olugbenga O. & Oyedele, Lukumon O. & Bilal, Muhammad & Ajayi, Saheed O. & Owolabi, Hakeem A. & Alaka, Hafiz A. & Bello, Sururah A., 2015. "Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS)," Resources, Conservation & Recycling, Elsevier, vol. 105(PA), pages 167-176.
- Qianqian Zhao & Junzhen Li & Roman Fediuk & Sergey Klyuev & Darya Nemova, 2021. "Benefit Evaluation Model of Prefabricated Buildings in Seasonally Frozen Regions," Energies, MDPI, vol. 14(21), pages 1-18, November.
- Zezhou Wu & Changhong Chen & Yuzhu Cai & Chen Lu & Hao Wang & Tao Yu, 2019. "BIM-Based Visualization Research in the Construction Industry: A Network Analysis," IJERPH, MDPI, vol. 16(18), pages 1-13, September.
More about this item
Keywords
off-site construction (OSC); critical success factors; interpretive structural modeling (ISM); matrix of cross-impact multiplication applied to classification (MICMAC) analysis;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:13:y:2021:i:16:p:8911-:d:611183. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.