Reference Model of Project Prototyping Problem
Author
Abstract
Suggested Citation
DOI: 10.2478/v10238-012-0034-7
Download full text from publisher
References listed on IDEAS
- Reichelt, Kimberly & Lyneis, James, 1999. "The dynamics of project performance: benchmarking the drivers of cost and schedule overrun," European Management Journal, Elsevier, vol. 17(2), pages 135-150, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Michael J. Pennock & Yacov Y. Haimes, 2002. "Principles and guidelines for project risk management," Systems Engineering, John Wiley & Sons, vol. 5(2), pages 89-108.
- Peter E D Love & Jim Smith & Ian Simpson & Michael Regan & Oluwole Olatunji, 2015. "Understanding the Landscape of Overruns in Transport Infrastructure Projects," Environment and Planning B, , vol. 42(3), pages 490-509, June.
- Chantal C. Cantarelli & Bent Flybjerg & Eric J. E. Molin & Bert van Wee, 2013. "Cost overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness," Papers 1307.2176, arXiv.org.
- Brian M. Kennedy & Durward K. Sobek & Michael N. Kennedy, 2014. "Reducing Rework by Applying Set‐Based Practices Early in the Systems Engineering Process," Systems Engineering, John Wiley & Sons, vol. 17(3), pages 278-296, September.
- Widdi MUGIJAYANI & Shandre Titik ANAS & Erizqa MAHARDHIKA & Yolanda ORIENT, 2024. "The COVID-19 Pandemic, Structural Transformation, and Training Programme Outcomes in Indonesia," Working Papers DP-2024-15, Economic Research Institute for ASEAN and East Asia (ERIA).
- Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
- Temitope Seun Omotayo & Bankole Awuzie & Valerie Kenechukwu Obi & Saheed Ajayi & Lovelin Ifeoma Obi & Oluyomi Osobajo & Adekunle Oke, 2022. "The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era," SAGE Open, , vol. 12(2), pages 21582440221, May.
More about this item
Keywords
project management; reference model; constraints satisfaction problem; constraint programming; alternative projects; knowledge base; decision support system; allocation planning; project management; reference model; constraints satisfaction problem; constraint programming; alternative projects; knowledge base; decision support system; allocation planning;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:founma:v:3:y:2011:i:1:p:33-46:n:3. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.