IDEAS home Printed from https://ideas.repec.org/a/vrs/founma/v3y2011i1p33-46n3.html
   My bibliography  Save this article

Reference Model of Project Prototyping Problem

Author

Listed:
  • Relich Marcin

    (Faculty of Economics and Management, University of Zielona Góra, Zielona Góra, Poland)

  • Banaszak Zbigniew

    (Faculty of Management, Warsaw University of Technology, Warsaw, Poland)

Abstract

The paper presents the idea of reference model of project prototyping problem for the projects that are at risk of failure. The hierarchical structure of declarative model connects two fields: functionalities of a typical service enterprise and management system of project execution in the enterprise. The functionalities as separate Constraints Satisfaction Problems (CSP) are described. CSP contains the sets of decision variables, their domains and constraints, which link these variables. The separated problems described as CSP, then in single main CSP are integrated. On the other hand, these problems can decompose into the subproblems concerning the functionalities of different fields. The open structure of model enables to solve the decision problems with different level of specificity. The decision problem can regard a query about the results of proposed decisions as well as the decisions guaranteeing the expected results. A declarative kind of proposed reference model in a natural way allows to implement its in constraint programming languages. The possibility of this approach illustrates an example.

Suggested Citation

  • Relich Marcin & Banaszak Zbigniew, 2011. "Reference Model of Project Prototyping Problem," Foundations of Management, Sciendo, vol. 3(1), pages 33-46, January.
  • Handle: RePEc:vrs:founma:v:3:y:2011:i:1:p:33-46:n:3
    DOI: 10.2478/v10238-012-0034-7
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/v10238-012-0034-7
    Download Restriction: no

    File URL: https://libkey.io/10.2478/v10238-012-0034-7?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Reichelt, Kimberly & Lyneis, James, 1999. "The dynamics of project performance: benchmarking the drivers of cost and schedule overrun," European Management Journal, Elsevier, vol. 17(2), pages 135-150, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Michael J. Pennock & Yacov Y. Haimes, 2002. "Principles and guidelines for project risk management," Systems Engineering, John Wiley & Sons, vol. 5(2), pages 89-108.
    2. Peter E D Love & Jim Smith & Ian Simpson & Michael Regan & Oluwole Olatunji, 2015. "Understanding the Landscape of Overruns in Transport Infrastructure Projects," Environment and Planning B, , vol. 42(3), pages 490-509, June.
    3. Chantal C. Cantarelli & Bent Flybjerg & Eric J. E. Molin & Bert van Wee, 2013. "Cost overruns in Large-Scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness," Papers 1307.2176, arXiv.org.
    4. Brian M. Kennedy & Durward K. Sobek & Michael N. Kennedy, 2014. "Reducing Rework by Applying Set‐Based Practices Early in the Systems Engineering Process," Systems Engineering, John Wiley & Sons, vol. 17(3), pages 278-296, September.
    5. Widdi MUGIJAYANI & Shandre Titik ANAS & Erizqa MAHARDHIKA & Yolanda ORIENT, 2024. "The COVID-19 Pandemic, Structural Transformation, and Training Programme Outcomes in Indonesia," Working Papers DP-2024-15, Economic Research Institute for ASEAN and East Asia (ERIA).
    6. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
    7. Temitope Seun Omotayo & Bankole Awuzie & Valerie Kenechukwu Obi & Saheed Ajayi & Lovelin Ifeoma Obi & Oluyomi Osobajo & Adekunle Oke, 2022. "The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era," SAGE Open, , vol. 12(2), pages 21582440221, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:founma:v:3:y:2011:i:1:p:33-46:n:3. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.