IDEAS home Printed from https://ideas.repec.org/a/tec/techni/v19y2023i1p1-13.html
   My bibliography  Save this article

Analysis Of The Priority Handling Of Enveromental Drainage Construction Project At Dinas Pekerjaan Umum Dan Penataan Ruang Banjarbaru City

Author

Listed:
  • Achmad Rizani

Abstract

Flood is one of the main problems of big cities in Indonesia, including Banjarbaru City. This is often caused by the not supportive existing drainage capacity when compared to the increasing of crowded urban conditions and reduced green open space. Handling of drainage including rehabilitation is necessary so that drainage can function properly as expected. On the other hand the Banjarbaru City Government has a limited budget each year that can be disbursed for drainage handling. The purpose of this thesis is to analyze criteria and subcriteria that are important in determining the priority of drainage handling. The ANP (Analytic Network Process) method is analyzed using the criteria in the Minister of Public Works regulation number 12/PRT/M/2014 tentang Penyelenggaraan Sistem Drainase Perkotaan to determine priorities for handling environmental drainage with important criteria, namely aspects of inundation, economic loss, social disruption and government facilities, loss of disturbance. transportation, loss to residential areas, and loss of personal property rights. Based on these 6 criteria, priorities for handling environmental drainage in Banjarbaru City are determined. Furthermore, an analysis is carried out to evaluate the priority of the choices that occur. This study suggests to decision makers that ANP can be used to analyze drainage management priorities in Banjarbaru City. This research focuses on variables consisting of criteria or considerations which form the background for priorities in handling the environmental drainage system in Banjarbaru City. The primary data results obtained from the field survey were followed by analysis using the ANP method with data tabulation calculations and assisted by Super Decisions software to determine the priority scale for handling environmental drainage in Banjarbaru City. The treatment priority scale in the Super Decisions software, the data of which is based on field survey results and data tabulation calculations, found that there are several locations that have a large priority scale but treatment has not been carried out due to several factors that are not contained in Minister of Public Works Regulation 12/PRT/M/2014 concerning Implementation of Urban Drainage Systems.

Suggested Citation

  • Achmad Rizani, 2023. "Analysis Of The Priority Handling Of Enveromental Drainage Construction Project At Dinas Pekerjaan Umum Dan Penataan Ruang Banjarbaru City," Technium, Technium Science, vol. 19(1), pages 1-13.
  • Handle: RePEc:tec:techni:v:19:y:2023:i:1:p:1-13
    DOI: 10.47577/technium.v19i.10522
    as

    Download full text from publisher

    File URL: https://techniumscience.com/index.php/technium/article/view/10522/4091
    Download Restriction: no

    File URL: https://techniumscience.com/index.php/technium/article/view/10522
    Download Restriction: no

    File URL: https://libkey.io/10.47577/technium.v19i.10522?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    JEL classification:

    • R00 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - General - - - General
    • Z0 - Other Special Topics - - General

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tec:techni:v:19:y:2023:i:1:p:1-13. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ana Maria Golita (email available below). General contact details of provider: .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.