IDEAS home Printed from https://ideas.repec.org/a/spr/ijsaem/vyid10.1007_s13198-020-01012-8.html
   My bibliography  Save this article

Three reliability models of a building cable manufacturing plant: a comparative analysis

Author

Listed:
  • S. Z. Taj

    (National University of Science and Technology)

  • S. M. Rizwan

    (National University of Science and Technology)

  • B. M. Alkali

    (Glasgow Caledonian University)

  • D. K. Harrison

    (Glasgow Caledonian University)

  • G. Taneja

    (Maharshi Dayanand University)

Abstract

In this paper, comparative analysis between the profits of three reliability models of a building cable manufacturing plant is carried out. To facilitate the analysis, real maintenance data of the plant are collected. Three case specific reliability models of the plant are developed. Semi-Markov processes and regenerative point techniques are used to estimate optimized reliability indices of the plant; such as; mean time to plant failure, plant availability, expected number of plant repairs, expected busy period of the repairman and profit incurred to the plant. Comparison between the profits is demonstrated through graphical analysis.

Suggested Citation

  • S. Z. Taj & S. M. Rizwan & B. M. Alkali & D. K. Harrison & G. Taneja, 0. "Three reliability models of a building cable manufacturing plant: a comparative analysis," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-8.
  • Handle: RePEc:spr:ijsaem:v::y::i::d:10.1007_s13198-020-01012-8
    DOI: 10.1007/s13198-020-01012-8
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s13198-020-01012-8
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s13198-020-01012-8?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ram Niwas & M. S. Kadyan & Jitender Kumar, 2016. "MTSF (mean time to system failure) and profit analysis of a single-unit system with inspection for feasibility of repair beyond warranty," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 198-204, December.
    2. Seyed Mohammad Mortazavi & Mahdi Karbasian & Sareh Goli, 2017. "Evaluating MTTF of 2-out-of-3 redundant systems with common cause failure and load share based on alpha factor and capacity flow models," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(3), pages 542-552, September.
    3. Anjali Naithani & Bhupender Parashar & P. K. Bhatia & Gulshan Taneja, 2017. "Probabilistic analysis of a 3-unit induced draft fan system with one warm standby with priority to repair of the unit in working state," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1383-1391, November.
    4. R. K. Bhardwaj & Komaldeep Kaur & S. C. Malik, 2017. "Reliability indices of a redundant system with standby failure and arbitrary distribution for repair and replacement times," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 423-431, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. S. Z. Taj & S. M. Rizwan & B. M. Alkali & D. K. Harrison & G. Taneja, 2020. "Three reliability models of a building cable manufacturing plant: a comparative analysis," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(2), pages 239-246, July.
    2. Yaqoob Al Rahbi & S. M. Rizwan & B. M. Alkali & Andrew Cowell & G. Taneja, 2019. "Reliability analysis of a rodding anode plant in aluminum industry with multiple units failure and single repairman," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(1), pages 97-109, February.
    3. Ram Niwas & M. S. Kadyan, 2022. "A bi-objective inspection policy for a repairable engineering system with failure free warranty," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(2), pages 881-891, April.
    4. Yu, Haiyue & Wu, Xinyang & Wu, Xiaoyue, 2020. "An extended object-oriented petri net model for mission reliability evaluation of phased-mission system with time redundancy," Reliability Engineering and System Safety, Elsevier, vol. 197(C).
    5. Ali Salmasnia & Amin Yazdekhasti, 2017. "A bi-objective model to optimize periodic preventive maintenance strategy during warranty period by considering customer satisfaction," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(4), pages 770-781, December.
    6. Kiril Tenekedjiev & Simon Cooley & Boyan Mednikarov & Guixin Fan & Natalia Nikolova, 2021. "Reliability Simulation of Two Component Warm-Standby System with Repair, Switching, and Back-Switching Failures under Three Aging Assumptions," Mathematics, MDPI, vol. 9(20), pages 1-40, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v::y::i::d:10.1007_s13198-020-01012-8. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.