IDEAS home Printed from https://ideas.repec.org/a/spr/cejnor/v21y2013i1p27-40.html
   My bibliography  Save this article

Solving job shop problems in the context of hypergraphs

Author

Listed:
  • Dušan Hvalica

Abstract

A class of hypergraphs, called $$B$$ -tails, is introduced. It is shown that a certain hypergraph can be assigned to any job shop problem in such a way that minimal $$B$$ -tails correspond to optimal schedules. An algorithm for searching for a minimal $$B$$ -tail is described. Copyright Springer-Verlag 2013

Suggested Citation

  • Dušan Hvalica, 2013. "Solving job shop problems in the context of hypergraphs," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(1), pages 27-40, June.
  • Handle: RePEc:spr:cejnor:v:21:y:2013:i:1:p:27-40
    DOI: 10.1007/s10100-012-0268-1
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/s10100-012-0268-1
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/s10100-012-0268-1?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tibor Csendes & Lidija Zadnik Stirn & Janez Žerovnik, 2013. "Editorial," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(1), pages 1-2, June.
    2. Andrej Kastrin & Janez Povh & Lidija Zadnik Stirn & Janez Žerovnik, 2021. "Methodologies and applications for resilient global development from the aspect of SDI-SOR special issues of CJOR," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(3), pages 773-790, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
    2. Sels, Veronique & Craeymeersch, Kjeld & Vanhoucke, Mario, 2011. "A hybrid single and dual population search procedure for the job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 215(3), pages 512-523, December.
    3. Jacomine Grobler & Andries Engelbrecht & Schalk Kok & Sarma Yadavalli, 2010. "Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time," Annals of Operations Research, Springer, vol. 180(1), pages 165-196, November.
    4. Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer, 2006. "Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times," International Journal of Production Economics, Elsevier, vol. 103(2), pages 633-647, October.
    5. Bürgy, Reinhard & Bülbül, Kerem, 2018. "The job shop scheduling problem with convex costs," European Journal of Operational Research, Elsevier, vol. 268(1), pages 82-100.
    6. Zhang, Rui & Song, Shiji & Wu, Cheng, 2013. "A hybrid artificial bee colony algorithm for the job shop scheduling problem," International Journal of Production Economics, Elsevier, vol. 141(1), pages 167-178.
    7. Christoph Schuster, 2006. "No-wait Job Shop Scheduling: Tabu Search and Complexity of Subproblems," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 63(3), pages 473-491, July.
    8. Varela, Ramiro & Vela, Camino R. & Puente, Jorge & Gomez, Alberto, 2003. "A knowledge-based evolutionary strategy for scheduling problems with bottlenecks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 57-71, February.
    9. Pham, Dinh-Nguyen & Klinkert, Andreas, 2008. "Surgical case scheduling as a generalized job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 185(3), pages 1011-1025, March.
    10. El-Bouri, A. & Azizi, N. & Zolfaghari, S., 2007. "A comparative study of a new heuristic based on adaptive memory programming and simulated annealing: The case of job shop scheduling," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1894-1910, March.
    11. Christophe Sauvey & Wajdi Trabelsi & Nathalie Sauer, 2020. "Mathematical Model and Evaluation Function for Conflict-Free Warranted Makespan Minimization of Mixed Blocking Constraint Job-Shop Problems," Mathematics, MDPI, vol. 8(1), pages 1-17, January.
    12. Pisut Pongchairerks, 2019. "A Two-Level Metaheuristic Algorithm for the Job-Shop Scheduling Problem," Complexity, Hindawi, vol. 2019, pages 1-11, March.
    13. Francis Sourd & Wim Nuijten, 2000. "Multiple-Machine Lower Bounds for Shop-Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 12(4), pages 341-352, November.
    14. Hurink, Johann & Knust, Sigrid, 2005. "Tabu search algorithms for job-shop problems with a single transport robot," European Journal of Operational Research, Elsevier, vol. 162(1), pages 99-111, April.
    15. Panos Pardalos & Oleg Shylo, 2006. "An Algorithm for the Job Shop Scheduling Problem based on Global Equilibrium Search Techniques," Computational Management Science, Springer, vol. 3(4), pages 331-348, September.
    16. Murovec, Bostjan & Suhel, Peter, 2004. "A repairing technique for the local search of the job-shop problem," European Journal of Operational Research, Elsevier, vol. 153(1), pages 220-238, February.
    17. M. Saqlain & S. Ali & J. Y. Lee, 2023. "A Monte-Carlo tree search algorithm for the flexible job-shop scheduling in manufacturing systems," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 548-571, June.
    18. Panos Pardalos & Oleg Shylo & Alkis Vazacopoulos, 2010. "Solving job shop scheduling problems utilizing the properties of backbone and “big valley”," Computational Optimization and Applications, Springer, vol. 47(1), pages 61-76, September.
    19. Ali Fırat İnal & Çağrı Sel & Adnan Aktepe & Ahmet Kürşad Türker & Süleyman Ersöz, 2023. "A Multi-Agent Reinforcement Learning Approach to the Dynamic Job Shop Scheduling Problem," Sustainability, MDPI, vol. 15(10), pages 1-24, May.
    20. Tao Ren & Yan Zhang & Shuenn-Ren Cheng & Chin-Chia Wu & Meng Zhang & Bo-yu Chang & Xin-yue Wang & Peng Zhao, 2020. "Effective Heuristic Algorithms Solving the Jobshop Scheduling Problem with Release Dates," Mathematics, MDPI, vol. 8(8), pages 1-25, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:cejnor:v:21:y:2013:i:1:p:27-40. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.