Integrated macroeconomic and climate impact assessment of Japan-financed power plants in Indonesia: a cost–benefit and input–output approach
Author
Abstract
Suggested Citation
DOI: 10.1007/s41685-025-00372-y
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kongyang Nhiakao & Helmut Yabar & Takeshi Mizunoya, 2022. "Cost-Benefit Analysis of the Nam Che 1 Hydropower Plant, Thathom District, Laos: An Ex-Post Analysis," Sustainability, MDPI, vol. 14(6), pages 1-16, March.
- Hassan Ali & Han Phoumin & Steven R. Weller & Beni Suryadi, 2021. "Cost–Benefit Analysis of HELE and Subcritical Coal-Fired Electricity Generation Technologies in Southeast Asia," Sustainability, MDPI, vol. 13(3), pages 1-16, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Amanda Qinisile Vilakazi & Sehliselo Ndlovu & Liberty Chipise & Alan Shemi, 2022. "The Recycling of Coal Fly Ash: A Review on Sustainable Developments and Economic Considerations," Sustainability, MDPI, vol. 14(4), pages 1-32, February.
- Chien, FengSheng & Vu, Trong Lam & Hien Phan, Thi Thu & Van Nguyen, Sang & Viet Anh, Nguyen Ho & Ngo, Thanh Quang, 2023. "Zero-carbon energy transition in ASEAN countries: The role of carbon finance, carbon taxes, and sustainable energy technologies," Renewable Energy, Elsevier, vol. 212(C), pages 561-569.
- Han Phoumin & Fukunari Kimura & Jun Arima, 2021. "ASEAN’s Energy Transition towards Cleaner Energy System: Energy Modelling Scenarios and Policy Implications," Sustainability, MDPI, vol. 13(5), pages 1-29, March.
- Hassan Ali & Han Phoumin & Beni Suryadi & Aitazaz A. Farooque & Raziq Yaqub, 2022. "Assessing ASEAN’s Liberalized Electricity Markets: The Case of Singapore and the Philippines," Sustainability, MDPI, vol. 14(18), pages 1-24, September.
More about this item
Keywords
Coal power plants; Geothermal; Indonesia; Cost–benefit analysis; Input–output analysis; Japanese public funding;All these keywords.
JEL classification:
- C67 - Mathematical and Quantitative Methods - - Mathematical Methods; Programming Models; Mathematical and Simulation Modeling - - - Input-Output Models
- D61 - Microeconomics - - Welfare Economics - - - Allocative Efficiency; Cost-Benefit Analysis
- Q43 - Agricultural and Natural Resource Economics; Environmental and Ecological Economics - - Energy - - - Energy and the Macroeconomy
- Q54 - Agricultural and Natural Resource Economics; Environmental and Ecological Economics - - Environmental Economics - - - Climate; Natural Disasters and their Management; Global Warming
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:apjors:v:9:y:2025:i:2:d:10.1007_s41685-025-00372-y. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.