Two-phase heuristics for scheduling of multiple projects

Author

Listed:
  • M.L. Mittal
  • Arun Kanda

Abstract

This paper deals with the problem of scheduling of multiple projects sharing a common pool of resources. New two-phase heuristics are proposed and compared with the existing single and two-phase heuristics. These two-phase heuristics are based on a two-stage prioritisation process of activities for resource allocation in which, at any decision point, the projects are first prioritised as per project selection rule and eligible activities in the projects are then prioritised as per activity selection rule. The two-phase heuristics are categorized into look-ahead and non-look-ahead type based on the project selection rules used. Performance of the heuristics is evaluated in two stages for two performance measures – minimising mean project delay and minimising increase over critical project duration. The results show that the some look-ahead heuristics produces better schedules when used with appropriate minimum/maximum criterion. The results also show that the heuristics which are superior in minimising mean project delay generally perform poorly in minimising increase over critical project duration.

Suggested Citation

  • M.L. Mittal & Arun Kanda, 2009. "Two-phase heuristics for scheduling of multiple projects," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 4(2), pages 159-177.
  • Handle: RePEc:ids:ijores:v:4:y:2009:i:2:p:159-177
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=22598
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ben Issa, Samer & Patterson, Raymond A. & Tu, Yiliu, 2021. "Solving resource-constrained multi-project environment under different activity assumptions," International Journal of Production Economics, Elsevier, vol. 232(C).
    2. Anıl Can & Gündüz Ulusoy, 2014. "Multi-project scheduling with two-stage decomposition," Annals of Operations Research, Springer, vol. 217(1), pages 95-116, June.
    3. Bredael, Dries & Vanhoucke, Mario, 2023. "Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates," European Journal of Operational Research, Elsevier, vol. 308(1), pages 54-75.
    4. Yuvraj Gajpal & Ashraf Elazouni, 2015. "Enhanced heuristic for finance-based scheduling of construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 33(7), pages 531-553, July.
    5. Feifei Li & Zhe Xu, 2018. "A multi-agent system for distributed multi-project scheduling with two-stage decomposition," PLOS ONE, Public Library of Science, vol. 13(10), pages 1-24, October.
    6. Rob Eynde & Mario Vanhoucke, 2020. "Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling," Journal of Scheduling, Springer, vol. 23(3), pages 301-325, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijores:v:4:y:2009:i:2:p:159-177. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=170 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.