IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v45y1996i1-3p407-419.html
   My bibliography  Save this article

Stochastic properties of a production--inventory process with planned production using transform methodology

Author

Listed:
  • Grubbstrom, Robert W.

Abstract

No abstract is available for this item.

Suggested Citation

  • Grubbstrom, Robert W., 1996. "Stochastic properties of a production--inventory process with planned production using transform methodology," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 407-419, August.
  • Handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:407-419
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(96)00009-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Grubbstrom, Robert W. & Molinder, Anders, 1996. "Safety production plans in MRP-systems using transform methodology," International Journal of Production Economics, Elsevier, vol. 46(1), pages 297-309, December.
    2. Grubbstrom, Robert W. & Ovrin, Peter, 1992. "Intertemporal generalization of the relationship between material requirements planning and input-output analysis," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 311-318, February.
    3. Grubbstrom, Robert W & Molinder, Anders, 1994. "Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory systems," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 299-311, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Francisco Campuzano-Bolarín & Fulgencio Marín-García & José Andrés Moreno-Nicolás & Marija Bogataj & David Bogataj, 2021. "Network Simulation Method for the evaluation of perturbed supply chains on a finite horizon," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(3), pages 823-839, September.
    2. Grubbstrom, Robert W. & Tang, Ou, 2000. "Modelling rescheduling activities in a multi-period production-inventory system," International Journal of Production Economics, Elsevier, vol. 68(2), pages 123-135, November.
    3. Bogataj, Marija & Grubbström, Robert W., 2012. "On the representation of timing for different structures within MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 749-755.
    4. Borgonovo, E., 2008. "Differential importance and comparative statics: An application to inventory management," International Journal of Production Economics, Elsevier, vol. 111(1), pages 170-179, January.
    5. Bogataj, Marija & Bogataj, Ludvik, 2004. "On the compact presentation of the lead times perturbations in distribution networks," International Journal of Production Economics, Elsevier, vol. 88(2), pages 145-155, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Reprint of “Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 113-125.
    2. Robert Grubbstrom & Ou Tang, 2000. "An Overview of Input-Output Analysis Applied to Production-Inventory Systems," Economic Systems Research, Taylor & Francis Journals, vol. 12(1), pages 3-25.
    3. Grubbstrom, Robert W., 1999. "A net present value approach to safety stocks in a multi-level MRP system," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 361-375, March.
    4. Horvat, Liljana & Bogataj, Ludvik, 1999. "A market game with the characteristic function according to the MRP and input-output analysis model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 281-288, March.
    5. Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model," International Journal of Production Economics, Elsevier, vol. 193(C), pages 51-62.
    6. Bogataj, Ludvik & Horvat, Liljana, 1996. "Stochastic considerations of Grubbstrom--Molinder model of MRP, input-output and multi-echelon inventory systems," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 329-336, August.
    7. Grubbstrom, Robert W. & Molinder, Anders, 1996. "Safety production plans in MRP-systems using transform methodology," International Journal of Production Economics, Elsevier, vol. 46(1), pages 297-309, December.
    8. Grubbstrom, Robert W., 1998. "A net present value approach to safety stocks in planned production," International Journal of Production Economics, Elsevier, vol. 56(1), pages 213-229, September.
    9. Grubbström, Robert W. & Tang, Ou, 2012. "The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 765-777.
    10. Sagawa, Juliana Keiko & Nagano, Marcelo Seido, 2015. "Modeling the dynamics of a multi-product manufacturing system: A real case application," European Journal of Operational Research, Elsevier, vol. 244(2), pages 624-636.
    11. Segerstedt, Anders, 1996. "Formulas of MRP," International Journal of Production Economics, Elsevier, vol. 46(1), pages 127-136, December.
    12. Grubbstrom, Robert W., 1995. "Modelling production opportunities -- an historical overview," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 1-14, October.
    13. Bogataj, Ludvik & Bogataj, Marija, 2007. "The study of optimal additional investments in capacities for reduction of delays in value chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 281-290, July.
    14. Bogataj, Marija & Grubbström, Robert W., 2012. "On the representation of timing for different structures within MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 749-755.
    15. Danijel Kovačić & Marija Bogataj, 2013. "Reverse logistics facility location using cyclical model of extended MRP theory," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(1), pages 41-57, June.
    16. Tang, Ou, 2004. "Simulated annealing in lot sizing problems," International Journal of Production Economics, Elsevier, vol. 88(2), pages 173-181, March.
    17. Beullens, Patrick, 2014. "Revisiting foundations in lot sizing—Connections between Harris, Crowther, Monahan, and Clark," International Journal of Production Economics, Elsevier, vol. 155(C), pages 68-81.
    18. Girlich, H.-J.Hans-Joachim, 2004. "Applications of integral transforms to planning and finance," International Journal of Production Economics, Elsevier, vol. 88(2), pages 137-144, March.
    19. Erik Dietzenbacher & Isidoro Romero, 2007. "Production Chains in an Interregional Framework: Identification by Means of Average Propagation Lengths," International Regional Science Review, , vol. 30(4), pages 362-383, October.
    20. Grubbstrom, Robert W. & Tang, Ou, 1999. "Further developments on safety stocks in an MRP system applying Laplace transforms and input-output analysis," International Journal of Production Economics, Elsevier, vol. 60(1), pages 381-387, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:407-419. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.