IDEAS home Printed from https://ideas.repec.org/a/bdu/oijepm/v4y2019i1p71-84id871.html

Determinants Of Successful Completion Of Housing Projects At National Housing Corporation In Kenya

Author

Listed:
  • Lillian Lumidi Luvuga

  • Dr. Christine Ngari

Abstract

Purpose: To establish the determinants of successful completion of housing projects at National Housing Corporation in Kenya. Methodology: This study employed descriptive research design. The design was suitable for the study because it described the situation regarding successful completion of housing projects at NHC. The target population was staff members in project management department at the National Housing. The unit of observation was 115 staff members. The research used both primary and secondary data. A five point Likert scale poll was utilized to get essential information on the independent variables of the research, that is; planning, monitoring and evaluation, shareholders involvement and resource accessibility. Primary data was gathered through the administration of questionnaires to respondents. Questionnaires were used because of their ability to reach big audience from different sources. Multiple linear regression was done to establish the influence of independent variable on dependent variable. Results: The study established significant and positive relationship between the independent variables and dependent variables. Project planning of housing projects had a significant and positive influence (β = 0.079 and p = 0.03) on the project success. Monitoring and evaluation had a positive and significant ((β = 0.122 and p = 0.02) influence on completion of housing projects. Additionally, it was revealed that stakeholder involvement had a positive and significant (β = 0.164 and p = 0.045) influence on completion of housing projects. Further, the study revealed resource availability had a positive and significant (β = 0.09 and p = 0.038) influence on completion of housing projects. Unique Contribution to theory, practice and policy: The study prescribes NHC to include its stakeholders in any project endeavour for an effective finish of the housing projects. The study also recommended that projects managers need to be more detailed in their planning to eliminate projects bottlenecks.

Suggested Citation

  • Lillian Lumidi Luvuga & Dr. Christine Ngari, 2019. "Determinants Of Successful Completion Of Housing Projects At National Housing Corporation In Kenya," International Journal of Entrepreneurship and Project Management, IPRJB, vol. 4(1), pages 71-84.
  • Handle: RePEc:bdu:oijepm:v:4:y:2019:i:1:p:71-84:id:871
    as

    Download full text from publisher

    File URL: https://iprjb.org/journals/IJEPM/article/view/871
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Long Li & Zhongfu Li & Guangdong Wu & Xiaodan Li, 2018. "Critical Success Factors for Project Planning and Control in Prefabrication Housing Production: A China Study," Sustainability, MDPI, vol. 10(3), pages 1-17, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Pei Dang & Zhanwen Niu & Shang Gao & Lei Hou & Guomin Zhang, 2020. "Critical Factors Influencing the Sustainable Construction Capability in Prefabrication of Chinese Construction Enterprises," Sustainability, MDPI, vol. 12(21), pages 1-21, October.
    2. Yongwoon Cha & Jonghyeob Kim & Chang-taek Hyun & Sangwon Han, 2018. "Development of a Program Definition Rating Index for the Performance Prediction of Construction Programs," Sustainability, MDPI, vol. 10(8), pages 1-18, August.
    3. Anat Anaqie Zahidy & Shahryar Sorooshian & Zahidy Abd Hamid, 2019. "Critical Success Factors for Corporate Social Responsibility Adoption in the Construction Industry in Malaysia," Sustainability, MDPI, vol. 11(22), pages 1-24, November.
    4. Xin Jin & Geoffrey Q. P. Shen & E. M. A. C. Ekanayake, 2021. "Improving Construction Industrialization Practices from a Socio-Technical System Perspective: A Hong Kong Case," IJERPH, MDPI, vol. 18(17), pages 1-20, August.
    5. Seoyoung Jung & Seulki Lee & Jungho Yu, 2021. "Identification and Prioritization of Critical Success Factors for Off-Site Construction Using ISM and MICMAC Analysis," Sustainability, MDPI, vol. 13(16), pages 1-21, August.
    6. Al-Hussein M. H. Al-Aidrous & Nasir Shafiq & Yasser Yahya Al-Ashmori & Al-Baraa Abdulrahman Al-Mekhlafi & Abdullah O. Baarimah, 2022. "Essential Factors Enhancing Industrialized Building Implementation in Malaysian Residential Projects," Sustainability, MDPI, vol. 14(18), pages 1-18, September.
    7. Xin Jin & Geoffrey Q. P. Shen & Qian-Cheng Wang & E. M. A. C. Ekanayake & Siqi Fan, 2021. "Promoting Construction Industrialisation with Policy Interventions: A Holistic Review of Published Policy Literature," IJERPH, MDPI, vol. 18(23), pages 1-23, November.
    8. Marco Nunes & António Abreu, 2020. "Managing Open Innovation Project Risks Based on a Social Network Analysis Perspective," Sustainability, MDPI, vol. 12(8), pages 1-31, April.
    9. Guangbin Wang & Huan Liu & Heng Li & Xiaochun Luo & Jiaxi Liu, 2020. "A Building Project-Based Industrialized Construction Maturity Model Involving Organizational Enablers: A Multi-Case Study in China," Sustainability, MDPI, vol. 12(10), pages 1-35, May.
    10. Shengxi Zhang & Zhongfu Li & Shengbin Ma & Long Li & Mengqi Yuan, 2022. "Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China," Sustainability, MDPI, vol. 14(9), pages 1-20, April.
    11. Weiping Jiang & Lirong Luo & Zezhou Wu & Jianbo Fei & Maxwell Fordjour Antwi-Afari & Tao Yu, 2019. "An Investigation of the Effectiveness of Prefabrication Incentive Policies in China," Sustainability, MDPI, vol. 11(19), pages 1-24, September.
    12. Lei Jiang & Zhongfu Li & Long Li & Tiankun Li & Yunli Gao, 2018. "A Framework of Industrialized Building Assessment in China Based on the Structural Equation Model," IJERPH, MDPI, vol. 15(8), pages 1-20, August.
    13. Ionica Oncioiu & Sorinel Căpuşneanu & Mirela Cătălina Türkeș & Dan Ioan Topor & Dana-Maria Oprea Constantin & Andreea Marin-Pantelescu & Mihaela Ștefan Hint, 2018. "The Sustainability of Romanian SMEs and Their Involvement in the Circular Economy," Sustainability, MDPI, vol. 10(8), pages 1-19, August.
    14. Haiying Luan & Long Li & Shengxi Zhang, 2022. "Exploring the Impact Mechanism of Interface Management Performance of Sustainable Prefabricated Construction: The Perspective of Stakeholder Engagement," Sustainability, MDPI, vol. 14(17), pages 1-18, August.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bdu:oijepm:v:4:y:2019:i:1:p:71-84:id:871. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chief Editor (email available below). General contact details of provider: https://iprjb.org/journals/IJEPM/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.